Turbine Oil | DABV01-03-Q-2114 | DABV01-04-M-2111 | 1-Jan-04 | $61,102.00 | |||||||||||||||
Repair Hal Al Wasety Road | DABV01-03-R-3076 | DABV01-03-C-3053 | 1-Jan-04 | $177,900.00 | |||||||||||||||
Repair Road - Omall to Tayran | DABV01-03-R-3079 | DABV01-03-C-3054 | 1-Jan-04 | $93,000.00 | |||||||||||||||
Repair Taza Police Station | DABV01-03-R-3086 | DABV01-03-C-3052 | 1-Jan-04 | $21,258.00 | |||||||||||||||
Domis Road Lighting | DABV01-03-R-3221 | DABV01-03-C-3057 | 1-Jan-04 | $8,900.00 | |||||||||||||||
Rehab Kirkuk Fire Station #2 | DABV01-03-R-3222 | DABV01-03-C-3058 | 1-Jan-04 | $11,857.00 | |||||||||||||||
RADIO STUDIO CONSTRUCTION- HILLA | DABV01-04-R-8003 | DABV01-04-M-8003 | 2-Jan-04 | $152,300.00 | |||||||||||||||
Pumps, vertical circulation, water | DABV01-03-Q-2038 | DABV01-04-M-2113 | 3-Jan-04 | $483,873.00 | |||||||||||||||
Gould pumps | DABV01-03-Q-2051 | DABV01-03-M-2112 | 3-Jan-04 | $38,025.00 | |||||||||||||||
Sulpheric Acid Transfer and Unloading pumps | DABV01-03-Q-2091 | DABV01-04-M-2117 | 3-Jan-04 | $21,100.00 | |||||||||||||||
Outage Work Tools | DABV01-03-Q-2196 | DABV01-04-M-2115 | 3-Jan-04 | $21,706.00 | |||||||||||||||
Ultra Coolant, Synthetic SSR Lubricant | DABV01-03-Q-2206 | DABV01-04-M-2116 | 3-Jan-04 | $3,908.00 | |||||||||||||||
lighting arresters | DABV01-03-Q-2234 | DABV01-03-M-2119 | 3-Jan-04 | $29,074.91 | |||||||||||||||
Battery Chargers | DABV01-03-Q-2251 | DABV01-04-M-2118 | 3-Jan-04 | $52,707.00 | |||||||||||||||
Asaige Project | DABV01-03-Q-3126 | DABV01-03-M-3154 | 3-Jan-04 | $5,000.00 | |||||||||||||||
Tawella Computers | DABV01-03-Q-3127 | DABV01-03-M-3155 | 3-Jan-04 | $5,000.00 | |||||||||||||||
Serwan Computers | DABV01-03-Q-3128 | DABV01-03-M-3156 | 3-Jan-04 | $5,000.00 | |||||||||||||||
Said Sadiq Computers | DABV01-03-Q-3129 | DABV01-03-M-3157 | 3-Jan-04 | $5,000.00 | |||||||||||||||
15 Police Vehicles | DABV01-03-Q-5157 | DABV01-04-M-5002 | 3-Jan-04 | $180,000.00 | |||||||||||||||
15 Police Vehicles (combined w/SIS 0362) | DABV01-03-Q-5157 | DABV01-04-M-5002 | 3-Jan-04 | $180,000.00 | |||||||||||||||
Refurbishment of Kirkuk Univ | DABV01-03-R-3065 | DABV01-03-C-3055 | 3-Jan-04 | $99,973.00 | |||||||||||||||
Summayl Electrical Distribution | DABV01-03-R-3140 | DABV01-03-C-3062 | 3-Jan-04 | $182,927.00 | |||||||||||||||
Winter Jackets for Kirkuk Police | DABV01-03-R-3224 | DABV01-03-C-3056 | 3-Jan-04 | $150,000.00 | |||||||||||||||
Trucks for ICDC | N/A | DABV01-04-C-0036 | 3-Jan-04 | $10,625,350.00 | |||||||||||||||
Renovation of Sa'Adia Hospital | DABV01-03-R-3007 | DABV01-03-C-3046 | 4-Jan-04 | $116,250.00 | |||||||||||||||
Al Abrara (2) Water Treatment | DABV01-03-R-3054 | DABV01-03-C-3049 | 4-Jan-04 | $33,550.00 | |||||||||||||||
Braem Day Care Renovation | DABV01-03-R-3225 | DABV01-04-C-3001 | 4-Jan-04 | $105,215.00 | |||||||||||||||
BUILDING DEMOLITION | DABV01-04-R-8016 | DABV01-04-M-8016 | 4-Jan-04 | $491,000.00 | |||||||||||||||
Drinking Water Distr Station (Basrah) | [n/a] | DABV01-04-M-5025 | 5-Jan-04 | $116,935.00 | |||||||||||||||
Drinking Water Distr Station (Basrah) | [n/a] | DABV01-04-M-5026 | 5-Jan-04 | $99,270.00 | |||||||||||||||
Hamden Sewage Works Filter Beds | [n/a] | DABV01-04-M-5027 | 5-Jan-04 | $19,440.00 | |||||||||||||||
Misc. GE Parts | DABV01-03-Q-2013 | DABV01-04-M-2125 | 5-Jan-04 | $3,203,217.13 | |||||||||||||||
UPS | DABV01-03-Q-2194 | DABV01-04-M-2120 | 5-Jan-04 | $71,000.00 | |||||||||||||||
Flexible Boroscope | DABV01-03-Q-2247 | DABV01-04-M-2121 | 5-Jan-04 | $17,500.00 | |||||||||||||||
Sewage Vacuum Trucks Phase I/II | DABV01-03-Q-5132 | DABV01-04-M-5029 | 5-Jan-04 | $282,883.00 | |||||||||||||||
COMPUTERS- HILLA UNIVERSITY | DABV01-04-R-8005 | DABV01-04-M-8005 | 5-Jan-04 | $32,180.00 | |||||||||||||||
FURNITURE FOR RADIO STATION | DABV01-04-R-8020 | DABV01-04-M-8020 | 5-Jan-04 | $17,550.00 | |||||||||||||||
Cell Phones for Interim Council | N/A | DABV01-04-M-5028 | 5-Jan-04 | $31,371.00 | |||||||||||||||
Said Sadiq Internet | DABV01-03-Q-3130 | DABV01-03-M-3158 | 6-Jan-04 | $3,500.00 | |||||||||||||||
Replc. Electrodes | DABV01-03-Q-2174 | DABV01-04-M-2126 | 7-Jan-04 | $68,832.00 | |||||||||||||||
Temperature Transmitters | DABV01-03-Q-2242 | DABV01-04-M-2123 | 7-Jan-04 | $8,453.00 | |||||||||||||||
FUEL SYSTEM REPAIR | DABV01-04-R-8006 | DABV01-04-M-8006 | 7-Jan-04 | $45,000.00 | |||||||||||||||
TRIBAL DEMOCRACY CENTER- NAJAF | DABV01-04-R-8021 | DABV01-04-M-8021 | 7-Jan-04 | $164,375.00 | |||||||||||||||
TRIBAL DEMOCRACY CENTER- KARBALA | DABV01-04-R-8022 | DABV01-04-M-8022 | 7-Jan-04 | $86,385.00 | |||||||||||||||
REGIONAL TRIBAL DEMOCRACY CENTER | DABV01-04-R-8023 | DABV01-04-M-8023 | 7-Jan-04 | $497,500.00 | |||||||||||||||
RAILROAD CROSSING | DABV01-04-R-8026 | DABV01-04-M-8026 | 7-Jan-04 | $5,600.00 | |||||||||||||||
MUSASAYIB AUX. WATER TREATMENT | DABV01-04-R-8061 | DABV-01-04-M-8061 | 7-Jan-04 | $34,500.00 | |||||||||||||||
JAMJAH ROAD PROJECT | DABV01-04-R-8217 | DABV01-04-M-8217 | 7-Jan-04 | $62,920.00 | |||||||||||||||
Water Treatment Chemicals | DABV01-03-Q-2061 | DABV01-04-M-2127 | 8-Jan-04 | $11,370.00 | |||||||||||||||
SDMO | DABV01-03-Q-2224 | DABV01-04-M-2114 | 8-Jan-04 | $381,338.00 | |||||||||||||||
Haweejah Region Security Equip | N/A | DABV01-03-M-3068 | 8-Jan-04 | $5,000.00 | |||||||||||||||
Motor for Scanner Air Fans | DABV01-03-Q-2030 | DABV01-04-M-2124 | 9-Jan-04 | $3,992.00 | |||||||||||||||
Flow nozzles | DABV01-03-Q-2239 | DABV01-04-M-2122 | 9-Jan-04 | $453,576.00 | |||||||||||||||
SPECIALTY ELEC TOOLS NAJAF | DABV01-04-M-8045 | DABV01-04-M-8045 | 9-Jan-04 | $13,438.00 | |||||||||||||||
SPECIALTY ELEC TOOLS HILLA | DABV01-04-M-8046 | DABV01-04-M-8046 | 9-Jan-04 | $27,273.00 | |||||||||||||||
AL KAWTHER HEALTH CENTER | DABV01-04-R-8038 | DABV01-04-M-8038 | 9-Jan-04 | $6,900.00 | |||||||||||||||
MOHAMMAD BORDAN HAMZA | DABV01-04-R-8039 | DABV01-04-M-8039 | 9-Jan-04 | $6,850.00 | |||||||||||||||
AL THAWBA HEALTH CENTER | DABV01-04-R-8040 | DABV01-04-M-8040 | 9-Jan-04 | $8,778.00 | |||||||||||||||
14 JULY HEALTH CENTER | DABV01-04-R-8041 | DABV01-04-M-8041 | 9-Jan-04 | $9,484.00 | |||||||||||||||
BABIL CLINIC | DABV01-04-R-8042 | DABV01-04-M-8042 | 9-Jan-04 | $8,572.00 | |||||||||||||||
TB CENTER | DABV01-04-R-8043 | DABV01-04-M-8043 | 9-Jan-04 | $8,100.00 | |||||||||||||||
HANDICAPPED CENTER | DABV01-04-R-8044 | DABV01-04-M-8044 | 9-Jan-04 | $23,194.00 | |||||||||||||||
Hig prs. Pumps | DABV01-03-Q-2033 | DABV01-04-M-2134 | 10-Jan-04 | $9,750.00 | |||||||||||||||
Pressure Switches and Connection Adapters | DABV01-03-Q-2042 | DABV01-04-M-2133 | 10-Jan-04 | $6,078.00 | |||||||||||||||
Tech rep Dibis | DABV01-03-Q-2078 | DABV01-04-M-2131 | 10-Jan-04 | $10,800.00 | |||||||||||||||
BLDG PRIMARY CENTRE Ar RUMAYTHAH | DABV01-03-Q-5143 | DABV01-04-M-5032 | 10-Jan-04 | $46,163.00 | |||||||||||||||
Al Madaan Primary School | N/A | DABV01-04-M-5030 | 10-Jan-04 | $12,935.00 | |||||||||||||||
Tuz Region Supplies and Equip | N/A | DABV01-03-M-3101 | 11-Jan-04 | $5,000.00 | |||||||||||||||
FPS CLOTHING | DABV01-04-R-8002 | DABV01-04-M-8002 | 11-Jan-04 | $117,811.75 | |||||||||||||||
Abu Pschute Irrigation System (RI) | [n/a] | DABV01-04-M-5034 | 12-Jan-04 | $49,383.00 | |||||||||||||||
Um Al Fisheg Irrigation Channel (RI) | [n/a] | DABV01-04-M-5034 | 12-Jan-04 | $9,009.00 | |||||||||||||||
Maysan Agricultural Bank Rehabilitation (RI) | [n/a] | DABV01-04-M-5034 | 12-Jan-04 | $23,688.00 | |||||||||||||||
Al Kahla CourthoUSAe Rehabilitation (RI) | [n/a] | DABV01-04-M-5034 | 12-Jan-04 | $17,490.00 | |||||||||||||||
Qala Salih CourthoUSAe Rehabilitation (RI) | [n/a] | DABV01-04-M-5034 | 12-Jan-04 | $18,995.00 | |||||||||||||||
Ali Al Gharbi CourthoUSAe Rehabilitation (RI) | [n/a] | DABV01-04-M-5034 | 12-Jan-04 | $26,459.00 | |||||||||||||||
Al Amarah Technical Institute – Mech (RI) | [n/a] | DABV01-04-M-5034 | 12-Jan-04 | $92,981.00 | |||||||||||||||
Al Amarah Technical Institute – Shops (RI) | [n/a] | DABV01-04-M-5034 | 12-Jan-04 | $53,379.00 | |||||||||||||||
Aluminum dosing pump | DABV01-03-Q-2001 | DABV01-04-M-2128 | 12-Jan-04 | $10,840.00 | |||||||||||||||
Seal Oil Pumps | DABV01-03-Q-2052 | DABV01-04-M-2137 | 12-Jan-04 | $2,416,581.00 | |||||||||||||||
Traveling Water Screen Parts | DABV01-03-Q-2056 | DABV01-04-M-2130 | 12-Jan-04 | $75,973.00 | |||||||||||||||
Heaters for Power Plant | DABV01-03-Q-2097 | DABV01-04-M-2129 | 12-Jan-04 | $22,460.00 | |||||||||||||||
Portable Heating Treatment systems | DABV01-03-Q-2262 | DABV01-04-M-2136 | 12-Jan-04 | $25,759.00 | |||||||||||||||
Uniforms | Verbal | DABV01-04-M-0001 | 12-Jan-04 | $38,000.00 | |||||||||||||||
Container Buildings for IRPS | [n/a] | DABV01-04-M-5033 | 13-Jan-04 | $66,190.00 | |||||||||||||||
Ammo Movement from Jordan | DABV01-04-Q-0001 | DABV01-04-M-0015 | 13-Jan-04 | $129,000.00 | |||||||||||||||
Kirkuk Police Tires and Batteries | DABV01-03-Q-3040 | DABV01-03-M-3048 | 13-Jan-04 | $10,000.00 | |||||||||||||||
Baqubah Lighting Project | DABV01-03-Q-3093 | DABV01-04-M-3121 | 14-Jan-04 | $3,600.00 | |||||||||||||||
Technicial Institute (Rehab) | DABV01-03-Q-5074 | DABV01-04-M-5035 | 14-Jan-04 | $50,621.00 | |||||||||||||||
Al Khalis Water Treatment Plant | DABV01-03-R-3056 | DABV01-04-C-3003 | 14-Jan-04 | $175,000.00 | |||||||||||||||
KARBALA GOVT BUILDING REPAIR | DABV01-04-R-8029 | DABV01-04-M-8029 | 14-Jan-04 | $109,000.00 | |||||||||||||||
AL HINDYA YOUTH CENTER ROOF REPAIR | DABV01-04-R-8047 | DABV01-04-M-8047 | 14-Jan-04 | $30,600.00 | |||||||||||||||
AL HAYDERIA POLICE STATION | DABV01-04-R-8059 | DABV01-04-M-8059 | 14-Jan-04 | $41,300.00 | |||||||||||||||
AZ-ZEHAWI SCHOOL | DABV01-04-R-8060 | DABV01-04-M-8060 | 14-Jan-04 | $74,275.00 | |||||||||||||||
Al ZAHRAWi Hospital | N/A | DABV01-04-M-5031 | 14-Jan-04 | $59,885.00 | |||||||||||||||
FIRE AND POLICE PICKUPS | DABV01-04-R-8008 | DABV01-04-M-8008 | 14-Jan-04 | $412,800.00 | |||||||||||||||
SPECIALTY ELEC TOOLS NAJAF | DABV01-04-R-8045 | DABV01-04-M-8045 | 14-Jan-04 | $13,438.00 | |||||||||||||||
Samawah Youth Center Refurb | [n/a] | DABV01-04-M-5012 | 15-Jan-04 | $43,341.00 | |||||||||||||||
Pneumatic Transducers and Controllers | DABV01-03-Q-2023 | DABV01-04-M-2139 | 15-Jan-04 | $81,558.00 | |||||||||||||||
Kirkuk-Salah Ad Din Road Repair | DABV01-03-R-3080 | DABV01-04-C-3005 | 15-Jan-04 | $178,750.00 | |||||||||||||||
Turkish Market Asphalt Repair | DABV01-03-R-3083 | DABV01-04-C-3006 | 15-Jan-04 | $100,000.00 | |||||||||||||||
Kirkuk-Baghdad Road Diversion | DABV01-03-R-3084 | DABV01-04-C-3004 | 15-Jan-04 | $63,000.00 | |||||||||||||||
Kirkuk 5-Dist Sewage Renovation | DABV01-03-R-3223 | DABV01-04-C-3002 | 15-Jan-04 | $167,615.00 | |||||||||||||||
Complete Valve Actuators | DABV01-04-Q-2283 | DABV01-04-M-2138 | 15-Jan-04 | $59,600.00 | |||||||||||||||
SEWER TRUCK | DABV01-03-R-8167 | DABV01-03-M-8167 | 15-Jan-04 | $18,200.00 | |||||||||||||||
Mosul Recruiting Center Meals | DABV01-04-Q-3008 | DABV01-04-M-3008 | 16-Jan-04 | $613.00 | |||||||||||||||
SPECIALTY ELEC TOOLS HILLA | DABV01-04-R-8046 | DABV01-04-M-8046 | 16-Jan-04 | $27,273.00 | |||||||||||||||
Food Delivery | DABV01- 04-Q-0001 | DABV01-04-M-0016 | 17-Jan-04 | $16,400.00 | |||||||||||||||
Overcurrent Relays | DABV01-03-Q-2104 | DABV01-04-M-2132 | 17-Jan-04 | $33,060.18 | GENERATOR | DABV01-04-R-8063 | DABV01-03-M-8063 | 17-Jan-04 | $95,000.00 | ||||||||||
CLASSROOM CONSTRUCTION- HILLA ACEADEMY | DABV01-04-R-8064 | DABV01-03-M-8064 | 17-Jan-04 | $470,800.00 | |||||||||||||||
BUSA Transportation | N/A | DABV01-04-M-0007 | 17-Jan-04 | $250,000.00 | |||||||||||||||
Overcurrent & Earth Relays | DABV01-03-Q-2058 | DABV01-04-M-2152 | 18-Jan-04 | $36,444.00 | |||||||||||||||
Stainless Steel Shims | DABV01-03-Q-2260 | DABV01-04-M-2147 | 18-Jan-04 | $13,711.00 | |||||||||||||||
Parts for GE Frame 5 CombUSAtion Turbine at Shuaiba | DABV01-04-Q-2286 | DABV01-04-M-2151 | 18-Jan-04 | $36,694.00 | |||||||||||||||
RMS AC/DC Clamp Meter | DABV01-04-Q-2288 | DABV01-04-M-2148 | 18-Jan-04 | $3,204.00 | |||||||||||||||
ICDC Winter Jackets | DABV01-04-Q-3006 | DABV01-04-M-3006 | 18-Jan-04 | $43,500.00 | |||||||||||||||
Bathroom/Latrine for Mosul Rec | DABV01-04-R-3027 | DABV01-04-C-3023 | 18-Jan-04 | $40,970.00 | |||||||||||||||
AL JABOOR SCHOOL- KIFL | DABV01-04-R-8065 | DABV01-04-M-8065 | 18-Jan-04 | $49,795.00 | |||||||||||||||
JUAD AWAD MOHAMED MEETING HALL- KIFL | DABV01-04-R-8066 | DABV01-04-M-8066 | 18-Jan-04 | $37,496.00 | |||||||||||||||
GPS for IDP Monitoring Teams | N/A | DABV01-03-M-3105 | 18-Jan-04 | $2,500.00 | |||||||||||||||
RO Water Tank | [n/a] | DABV01-04-M-5036 | 19-Jan-04 | $40,000.00 | |||||||||||||||
Generator for Raheed Ashar Bank | [n/a] | DABV01-04-M-5043 | 19-Jan-04 | $18,000.00 | |||||||||||||||
Boiler Feedwater Pumps | DABV01-03-Q-2173 | DABV01-04-M-2090 | 19-Jan-04 | $586,467.00 | |||||||||||||||
Boiler Tubes | DABV01-03-Q-2213 | DABV01-04-M-2158 | 19-Jan-04 | $4,746,000.00 | |||||||||||||||
Traffic Police HQ - Basrah | DABV01-03-Q-5149 | DABV01-04-M-5041 | 19-Jan-04 | $15,579.00 | |||||||||||||||
Barah Police HQ | DABV01-03-Q-5150 | DABV01-04-M-5040 | 19-Jan-04 | $79,122.00 | |||||||||||||||
Umm Qasr Fire Station - Basrah | DABV01-03-Q-5151 | DABV01-04-M-5042 | 19-Jan-04 | $43,968.00 | |||||||||||||||
Furniture | N/A | DABV01-04-M-0001 | 19-Jan-04 | $7,537.50 | |||||||||||||||
Hand Held Metal Detectors | DABV01-03-Q-0119 | DABV01-04-M-0005 | 20-Jan-04 | $3,040.00 | |||||||||||||||
Cadet Equipment | DABV01-03-Q-0119 | DABV01-04-M-0006 | 20-Jan-04 | $536,272.00 | |||||||||||||||
HILLAH TRIBAL DEMOCRACY CENTER | DABV01-04-R-8067 | DABV01-04-M-8067 | 20-Jan-04 | $103,311.00 | |||||||||||||||
Gas Turbine Nozzle Rings | DABV01-03-Q-0041 | DABV01-04-M-2163 | 21-Jan-04 | $53,339.00 | |||||||||||||||
Helium Leak Testing | DABV01-03-Q-2008 | DABV01-04-M-2162 | 21-Jan-04 | $91,500.00 | |||||||||||||||
Hydraulic Jacks | DABV01-03-Q-2040 | DABV01-04-M-2014 | 21-Jan-04 | $4,566.42 | |||||||||||||||
Supply Voltage | DABV01-03-Q-2244 | DABV01-04-M-2157 | 21-Jan-04 | $38,436.00 | |||||||||||||||
Gland Packing for Pumps | DABV01-03-Q-2259 | DABV01-04-M-2156 | 21-Jan-04 | $135,500.00 | |||||||||||||||
Signal Converter/Isolater | DABV01-04-Q-2291 | DABV01-04-M-2161 | 21-Jan-04 | $1,402.00 | |||||||||||||||
Hawija Police Equipment | N/A | DABV01-03-M-3102 | 21-Jan-04 | $4,281.00 | |||||||||||||||
Nationality Cards | Vendor Quotes | DABV01-04-M-0004 | 21-Jan-04 | $112,500.00 | |||||||||||||||
ReligioUSA Tourism Visas | Vendor Quotes | DABV01-04-M-0004 | 21-Jan-04 | $9,000.00 | |||||||||||||||
Supply Relays | DABV01-04-Q-2163 | DABV01-04-M-2266 | 21-Jan-04 | $22,080.00 | |||||||||||||||
Concrete Walkway in Khormal | DABV01-03-R-3026 | DABV01-04-C-3009 | 22-Jan-04 | $75,400.00 | |||||||||||||||
Renovate Halabja ICU | DABV01-03-R-3185 | DABV01-04-C-3013 | 22-Jan-04 | $192,850.25 | |||||||||||||||
Construct Retaining Wall | DABV01-03-R-3192 | DABV01-04-C-3014 | 22-Jan-04 | $48,250.00 | |||||||||||||||
Renovate Municipal Building | DABV01-03-R-3197 | DABV01-04-C-3012 | 22-Jan-04 | $51,928.00 | |||||||||||||||
Renovate Middle School | DABV01-03-R-3.00 | DABV01-04-C-3021 | 22-Jan-04 | $48,107.00 | |||||||||||||||
Repair Sewage Line in Khormal | DABV01-03-R-3201 | DABV01-04-C-3017 | 22-Jan-04 | $209,250.00 | |||||||||||||||
Concrete Stair for road in Khormal | DABV01-03-R-3203 | DABV01-04-C-3010 | 22-Jan-04 | $47,575.00 | |||||||||||||||
Renovate Nursery School | DABV01-03-R-3207 | DABV01-04-C-3019 | 22-Jan-04 | $9,800.00 | |||||||||||||||
Renovate Children Activity Center | DABV01-03-R-3208 | DABV01-04-C-3011 | 22-Jan-04 | $10,947.00 | |||||||||||||||
Renovate Khormal Children Center | DABV01-03-R-3209 | DABV01-04-C-3016 | 22-Jan-04 | $12,844.00 | |||||||||||||||
Masker & Kanishehk Clinic Ren | DABV01-03-R-3210 | DABV01-04-C-3015 | 22-Jan-04 | $27,012.00 | |||||||||||||||
Construct Playground & Fence | DABV01-03-R-3212 | DABV01-04-C-3020 | 22-Jan-04 | $7,044.00 | |||||||||||||||
Tuz Computer and Printer | DABV01-04-Q-3025 | DABV01-04-M-3027 | 22-Jan-04 | $10,000.00 | |||||||||||||||
Repair of Generator | DABV01-04-Q-3026 | DABV01-04-M-3028 | 22-Jan-04 | $310.00 | |||||||||||||||
INTERNET SYSTEM-UNIV | DABV01-04-R-8062 | DABV01-04-M-8062 | 22-Jan-04 | $13,380.00 | |||||||||||||||
AL RAMADI TRIBAL DEMOCRACY CENTER | DABV01-04-R-8068 | DABV01-04-M-8068 | 22-Jan-04 | $130,000.00 | |||||||||||||||
Combat Boots | N/A | DABV01-04-M-0011 | 22-Jan-04 | $104,300.00 | |||||||||||||||
WarehoUSAe Shelving | Vendor Quotes | DABV01-04-M-0012 | 22-Jan-04 | $5,000.00 | |||||||||||||||
Border Equipment | DABV01-03-Q-0125 | DABV01-04-M0008 | 23-Jan-04 | $1,813,696.00 | |||||||||||||||
Carbon Steel Pipe - ASTM | DABV01-03-Q-2179 | DABV01-04-M-2140 | 23-Jan-04 | $26,488.92 | |||||||||||||||
Ghazlani IDP H2O and Sanitation | DABV01-03-R-3110 | DABV01-04-C-3024 | 23-Jan-04 | $65,399.20 | |||||||||||||||
Ninevah Auditing Board Ren | DABV01-03-R-3111 | DABV01-04-C-3025 | 23-Jan-04 | $7,597.00 | |||||||||||||||
Mosul Road Repair | DABV01-03-R-3112 | DABV01-04-C-3026 | 23-Jan-04 | $188,700.00 | |||||||||||||||
Ninevah Governorate Annex Ren | DABV01-03-R-3120 | DABV01-04-C-3027 | 23-Jan-04 | $73,377.00 | |||||||||||||||
Renovate Al Quds School | DABV01-03-R-3137 | DABV01-04-C-3028 | 23-Jan-04 | $15,135.00 | |||||||||||||||
Tawellah Walkway Reconstruction | DABV01-03-R-3187 | DABV01-04-C-3022 | 23-Jan-04 | $76,400.00 | |||||||||||||||
Ahmad Awa Water & Sewage | DABV01-03-R-3204 | DABV01-04-C-3018 | 23-Jan-04 | $80,900.00 | |||||||||||||||
POLICE ACADEMY SECURITY WALL | DABV01-04-R-8069 | DABV01-04-M-8069 | 23-Jan-04 | $475,000.00 | |||||||||||||||
Fertilizer for Provinces (Combined Order) | [n/a] | DABV01-04-M-5045 | 24-Jan-04 | $600,000.00 | |||||||||||||||
9 | Turbine Generator Stator Winding Cooler | DABV01-03-Q-2076 | DABV01-04-M-2159 | 24-Jan-04 | $35,988.00 | ||||||||||||||
Gate Valves | DABV01-03-Q-2178 | DABV01-04-M-2150 | 24-Jan-04 | $206,310.00 | |||||||||||||||
FUSAes | DABV01-03-Q-2184 | DABV01-04-M-2146 | 24-Jan-04 | $286.25 | Pressure Differential Switches | DABV01-03-Q-2215 | DABV01-04-M-2164 | 24-Jan-04 | $16,920.00 | ||||||||||
Summayl Trash Collection Trailers | DABV01-03-Q-3080 | DABV01-04-M-3022 | 24-Jan-04 | $45,000.00 | |||||||||||||||
Barima & Makmour Road Repair | DABV01-03-R-3113 | DABV01-04-C-3032 | 24-Jan-04 | $87,807.50 | Aqrah SlaughterhoUSAe | DABV01-03-R-3144 | DABV01-04-C-3033 | 24-Jan-04 | $74,810.00 | ||||||||||
Rotary Screw Pumps | DABV01-04-Q-2281 | DABV01-04-M-2165 | 24-Jan-04 | $89,952.00 | |||||||||||||||
Al Hartha RO Unit Installation | DABV01-04-Q-5.00 | ||||||||||||||||||
DABV01-04-M-5037 | 24-Jan-04 | $228,900.00 | |||||||||||||||||
Al Quarnah RO Plant/Al Jubalayah Plant | DABV01-04-Q-5.00 | ||||||||||||||||||
DABV01-04-M-5038 | 24-Jan-04 | $436,485.00 | |||||||||||||||||
Abu Al-Kahsib Plant | DABV01-04-Q-5.00 | ||||||||||||||||||
DABV01-04-M-5039 | 24-Jan-04 | $340,333.00 | |||||||||||||||||
Bulldozer (wheeled) | DABV01-04-R-3014 | DABV01-04-C-3029 | 24-Jan-04 | $78,900.00 | |||||||||||||||
Asphalt Truck & Paver | DABV01-04-R-3019 | DABV01-04-C-3031 | 24-Jan-04 | $197,000.00 | |||||||||||||||
Street Cleaning Vehicles | DABV01-04-R-3020 | DABV01-04-C-3030 | 24-Jan-04 | $194,000.00 | |||||||||||||||
PRINTING PRESS AL NAJAF | DABV01-04-R-8025 | DABV01-04-M-8025 | 24-Jan-04 | $522,250.00 | |||||||||||||||
OFFICE BLDG/WATER SYSTEM | DABV01-04-R-8070 | DABV01-04-M-8070 | 24-Jan-04 | $495,000.00 | |||||||||||||||
Broiler Layer Protein Concentrate | NA | DABV01-04-C-0003 | 24-Jan-04 | $14,596,350.00 | |||||||||||||||
Zhako Phone Company Equip | DABV01-03-Q-3081 | DABV01-04-M-3023 | 25-Jan-04 | $24,043.00 | |||||||||||||||
Dokeri Bridge Construction | DABV01-03-R-3141 | DABV01-04-C-3043 | 25-Jan-04 | $55,260.00 | |||||||||||||||
Beresetik School Renovation | DABV01-03-R-3145 | DABV01-04-C-3040 | 25-Jan-04 | $12,931.00 | |||||||||||||||
Shkaftiyan School Renovation | DABV01-03-R-3146 | DABV01-04-C-3041 | 25-Jan-04 | $125,642.00 | |||||||||||||||
Baidrah-An Sinfi Road Repair | DABV01-03-R-3148 | DABV01-04-C-3042 | 25-Jan-04 | $221,000.00 | |||||||||||||||
4 Fire Stations | DABV01-04-Q-5001 | DABV01-04-M-5046 | 25-Jan-04 | $143,992.00 | |||||||||||||||
Mosul Metro Area Signage Project | DABV01-03-R-3116 | DABV01-04-C-3054 | 26-Jan-04 | $209,870.00 | |||||||||||||||
Al Had Bridge | DABV01-03-R-3118 | DABV01-04-C-3053 | 26-Jan-04 | $130,000.00 | |||||||||||||||
Balka Sewer Construction | DABV01-03-R-3195 | DABV01-04-C-3007 | 26-Jan-04 | $35,830.00 | |||||||||||||||
Khormal Public Baths Renovation | DABV01-03-R-3211 | DABV01-04-C-3008 | 26-Jan-04 | $26,435.00 | |||||||||||||||
WATER NETWORK- AL BASHER | DABV01-04-R-8034 | DABV01-04-M-8034 | 26-Jan-04 | $79,991.00 | |||||||||||||||
WATER NETWORK- AL ABASSIA | DABV01-04-R-8035 | DABV01-04-M-8035 | 26-Jan-04 | $52,825.00 | |||||||||||||||
WATER CONNECTION- AL TEL | DABV01-04-R-8036 | DABV01-04-M-8036 | 26-Jan-04 | $19,160.00 | |||||||||||||||
WATER TREATMENT PLANT- ABU GRAB | DABV01-04-R-8037 | DABV01-04-M-8037 | 26-Jan-04 | $141,708.00 | |||||||||||||||
Nasiriyah Stadium | [n/a] | DABV01-04-M-5047 | 27-Jan-04 | $144,683.00 | |||||||||||||||
Jersey Barriers | [n/a] | DABV01-04-M-5048 | 27-Jan-04 | $6,550.00 | |||||||||||||||
Brika School Project | DABV01-03-R-3189 | DABV01-04-C-3051 | 27-Jan-04 | $100,690.64 | PUK-Boarding HoUSAe Renovation | DABV01-03-R-3218 | DABV01-04-C-3046 | 27-Jan-04 | $121,522.50 | Islamic Bldg-School Renovation | DABV01-03-R-3220 | DABV01-04-C-3045 | 27-Jan-04 | $225,190.00 | |||||
Kirkuk 50-ton Crane | DABV01-04-R-3003 | DABV01-04-C-3055 | 27-Jan-04 | $180,000.00 | |||||||||||||||
Shaqlawa Primary School Ren | DABV01-04-R-3030 | DABV01-04-C-3037 | 27-Jan-04 | $7,800.00 | |||||||||||||||
Shaqlawa Comm Center Ren | DABV01-04-R-3031 | DABV01-04-C-3038 | 27-Jan-04 | $169,500.00 | |||||||||||||||
Comm Bldg-Youth Center Ren | DABV01-04-R-3219 | DABV01-04-C-3044 | 27-Jan-04 | $163,935.00 | |||||||||||||||
CIVIL DEFENSE EQUIPMENT | DABV01-04-R-8017 | DABV01-04-M-8017 | 27-Jan-04 | $23,065.00 | |||||||||||||||
AL QUIDI PRIMARY SCHOOL | DABV01-04-R-8048 | DABV01-04-M-8048 | 27-Jan-04 | $23,901.00 | |||||||||||||||
AL SUMAINANIA PRIMARY SCHOOL | DABV01-04-R-8049 | DABV01-04-M-8049 | 27-Jan-04 | $10,961.00 | |||||||||||||||
SAEED AL SHOHADA PRIMARY SCHOOL | DABV01-04-R-8050 | DABV01-04-M-8050 | 27-Jan-04 | $23,624.00 | |||||||||||||||
AL MABADA PRIMARY SCHOOL | DABV01-04-R-8051 | DABV01-04-M-8051 | 27-Jan-04 | $10,398.00 | |||||||||||||||
SECONDARY SCHOOL FOR GIRLS | DABV01-04-R-8052 | DABV01-04-M-8052 | 27-Jan-04 | $28,600.00 | |||||||||||||||
ESSAMA BIN ZAID PRIMARY SCHOOL | DABV01-04-R-8053 | DABV01-04-M-8053 | 27-Jan-04 | $24,789.00 | |||||||||||||||
AL FARAHIDI PRIMARY SCHOOL | DABV01-04-R-8055 | DABV01-04-M-8055 | 27-Jan-04 | $15,345.00 | |||||||||||||||
AL MONTHER PRIMARY SCHOOL | DABV01-04-R-8056 | DABV01-04-M-8056 | 27-Jan-04 | $14,450.00 | |||||||||||||||
AL QUIBA SCHOOL FOR GIRLS | DABV01-04-R-8057 | DABV01-04-M-8057 | 27-Jan-04 | $18,980.00 | |||||||||||||||
AL TAOON PRIMARY SCHOOL | DABV01-04-R-8058 | DABV01-04-M-8058 | 27-Jan-04 | $13,134.00 | |||||||||||||||
HOUSAE REBUILD (ROCKET DAMAGE)- AL HILLA | DABV01-04-R-8084 | DABV01-04-M-8084 | 27-Jan-04 | $17,170.00 | |||||||||||||||
Forklift | Iraqi MOI Quotes | DABV01-04-M-0013 | 27-Jan-04 | $12,890.00 | |||||||||||||||
Farmers Bridge Al Warka | [n/a] | DABV01-04-M-5004 | 28-Jan-04 | $61,423.00 | |||||||||||||||
Al Qurnah Post Office | [n/a] | DABV01-04-M-5044 | 28-Jan-04 | $69,714.00 | |||||||||||||||
Office Supplies for Shat Al Arab Naval Academy | [n/a] | DABV01-04-M-5050 | 28-Jan-04 | $42,532.00 | |||||||||||||||
Repair of DCS | DABV01-03-Q-2205 | DABV01-04-M-2167 | 28-Jan-04 | $32,684.20 | Kirkuk Police Motorcycles | DABV01-03-Q-3007 | DABV01-04-M-3007 | 28-Jan-04 | $43,000.00 | ||||||||||
Meals at Mosul Recruting Center | DABV01-03-R-3025 | DABV01-04-C-3069 | 28-Jan-04 | $4,236.00 | |||||||||||||||
Mosul-Jadeeda Vocational School | DABV01-03-R-3117 | DABV01-04-C-3070 | 28-Jan-04 | $92,583.00 | |||||||||||||||
Al Muharribin Clinic Repair | DABV01-03-R-3119 | DABV01-04-C-3066 | 28-Jan-04 | $153,770.00 | |||||||||||||||
Mosul MUSAeum Repair | DABV01-03-R-3121 | DABV01-04-C-3067 | 28-Jan-04 | $120,806.00 | |||||||||||||||
Zhako City Hospital Upgrade | DABV01-03-R-3149 | DABV01-04-C-3068 | 28-Jan-04 | $125,642.00 | |||||||||||||||
Suly Chwarbakh Nursery Ren | DABV01-03-R-3198 | DABV01-04-C-3065 | 28-Jan-04 | $12,075.00 | |||||||||||||||
Suly Director of Social Care Ren | DABV01-03-R-3199 | DABV01-04-C-3064 | 28-Jan-04 | $11,010.00 | |||||||||||||||
Extended Cab Trucks | DABV01-04-Q-0008 | DABV01-04-M-0018 | 28-Jan-04 | $5,220,000.00 | |||||||||||||||
CARS FOR JUDICIARY | DABV01-04-R-8026 | DABV01-04-M-8026 | 28-Jan-04 | $73,600.00 | |||||||||||||||
Waste Transfer Station - Basrah | [n/a] | DABV01-04-M-5052 | 29-Jan-04 | $39,520.00 | |||||||||||||||
Transmitters & Misc. Test Equipment | DABV01-03-Q-2070 | DABV01-04-M-2170 | 29-Jan-04 | $3,785.00 | |||||||||||||||
Blue Gland Packing | DABV01-03-Q-2272 | DABV01-04-M-2153 | 29-Jan-04 | $84,830.00 | |||||||||||||||
Body Armour for IRPS | DABV01-03-Q-5180 | DABV01-04-M-5049 | 29-Jan-04 | $36,840.00 | |||||||||||||||
Ninewa Cultural Arts Center | DABV01-03-R-3138 | DABV01-04-C-3072 | 29-Jan-04 | $225,850.00 | |||||||||||||||
Darge Shakayen Walkway Recon | DABV01-03-R-3193 | DABV01-04-C-3052 | 29-Jan-04 | $51,240.00 | |||||||||||||||
Miri Sur School Classrooms | DABV01-03-R-3213 | DABV01-04-C-3049 | 29-Jan-04 | $116,908.00 | |||||||||||||||
Suly Dialysis Center Construction | DABV01-03-R-3214 | DABV01-04-C-3047 | 29-Jan-04 | $150,716.00 | |||||||||||||||
Khormal Democratic Org Bldg | DABV01-03-R-3215 | DABV01-04-C-3050 | 29-Jan-04 | $157,477.00 | |||||||||||||||
4X4 Vehicles | DABV01-04-Q-0008 | DABV01-04-M-0014 | 29-Jan-04 | $676,500.00 | |||||||||||||||
Water Transport Truck;Fuel Truck; | DABV01-04-Q-0008 | DABV01-04-M-0017 | 29-Jan-04 | $138,000.00 | |||||||||||||||
Spark Plugs | DABV01-04-Q-2250 | DABV01-04-M-2173 | 29-Jan-04 | $4,242.32 | Mosul Environmental Test Center | DABV01-04-R-3024 | DABV01-04-C-3071 | 29-Jan-04 | $500,000.00 | ||||||||||
HIGHWAY PATROL CARS | DABV01-04-R-8028 | DABV01-04-M-8028 | 29-Jan-04 | $131,328.00 | |||||||||||||||
CONSULTATION CLINICS- AL FURAT HOSPITAL | DABV01-04-R-8071 | DABV01-04-M-8071 | 29-Jan-04 | $151,450.00 | |||||||||||||||
OPERATING ROOMS- AL FURAT HOSPITAL | DABV01-04-R-8072 | DABV01-04-M-8072 | 29-Jan-04 | $134,653.00 | |||||||||||||||
CHECK POINT BUILDING | DABV01-04-R-8074 | DABV01-04-M-8074 | 29-Jan-04 | $45,217.00 | |||||||||||||||
Tikrit Vet Clinic Generator | DABV01-03-Q-3089 | DABV01-03-M-3117 | 30-Jan-04 | $28,500.00 | |||||||||||||||
KMTB Renovation | DABV01-03-R-0033 | DABV01-04-C-0034 | 30-Jan-04 | $8,037,250.00 | |||||||||||||||
Ninevah Public Records Database | DABV01-03-R-3115 | DABV01-04-C-3074 | 30-Jan-04 | $298,916.00 | |||||||||||||||
Qadissiya Orphange Renovation | DABV01-03-R-3136 | DABV01-04-C-3073 | 30-Jan-04 | $189,437.00 | |||||||||||||||
Renovation of Pashi Gawra School | DABV01-03-R-3157 | DABV01-04-C-3034 | 30-Jan-04 | $52,189.00 | |||||||||||||||
Diyala Disabled Vets Equipment | DABV01-04-Q-3013 | DABV01-04-M-3013 | 30-Jan-04 | $5,000.00 | |||||||||||||||
TURNKEY RADIO STATION | DABV01-04-R-8001 | DABV01-04-M-8001 | 30-Jan-04 | $192,909.00 | |||||||||||||||
ARCHEO SITE FENCE-NUFR | DABV01-04-R-8085 | DABV01-04-M-8085 | 30-Jan-04 | $46,500.00 | |||||||||||||||
A/H Soot Blower | DABV01-03-Q-2095 | DABV01-04-M-2172 | 31-Jan-04 | $43,810.00 | |||||||||||||||
Differential Pressure Transducer | DABV01-03-Q-2246 | DABV01-04-M-2169 | 31-Jan-04 | $39,346.00 | |||||||||||||||
F009 LPG Distribution at Muthanna & Maysan | DABV01-03-Q-5179 | DABV01-04-M-5011 | 31-Jan-04 | $106,454.00 | |||||||||||||||
30FT Launch Boats for IRPS | DABV01-03-Q-5181 | DABV01-04-M-5051 | 31-Jan-04 | $1,430,593.00 | |||||||||||||||
Swing Check Valves | DABV01-04-Q-2171 | DABV01-04-M-2171 | 31-Jan-04 | $14,800.00 | |||||||||||||||
AL NEEL MARKET | DABV01-04-R-8004 | DABV01-04-M-8004 | 31-Jan-04 | $38,100.00 | |||||||||||||||
MOBILE COMMAND POSTS | DABV01-04-R-8089 | DABV01-04-M-8089 | 31-Jan-04 | $455,000.00 | |||||||||||||||
500 KVA GENERATOR | DABV01-04-R-8090 | DABV01-04-M-8090 | 31-Jan-04 | $105,000.00 | |||||||||||||||
ARCHAEOLOGICAL COMMAND POSTS | DABV01-04-R-8091 | DABV01-04-M-8091 | 31-Jan-04 | $498,600.00 | |||||||||||||||
GENERATOR/LIVING QUARTERS | DABV01-04-R-8092 | DABV01-04-M-8092 | 31-Jan-04 | $497,530.00 | |||||||||||||||
Reach Truck | local quotes | DABV01-04-M-0019 | 31-Jan-04 | $40,000.00 | |||||||||||||||
Maint at Police Logistics Compound | local quotes | DABV01-04-M-0020 | 31-Jan-04 | $276,000.00 | |||||||||||||||
Basrah BUSAiness Center | [n/a] | DABV01-04-M-5055 | 1-Feb-04 | $81,130.00 | |||||||||||||||
BadUSAh Grain Storage Renovation | DABV01-03-R-3114 | DABV01-04-C-3076 | 1-Feb-04 | $56,852.00 | |||||||||||||||
Tal-Afar Life Support | DABV01-04-R-3035 | DABV01-04-C-3075 | 1-Feb-04 | $2,369,258.00 | |||||||||||||||
SHELTER FOR CONTAINERS | DABV01-04-R-8086 | DABV01-04-M-8086 | 1-Feb-04 | $30,000.00 | |||||||||||||||
Fuel Oil Heater Gaskets | DABV01-03-Q-2028 | DABV01-04-M-2176 | 2-Feb-04 | $309,140.80 | Heat Exchanger Tubes | DABV01-03-Q-2149 | DABV01-04-M-2177 | 2-Feb-04 | $396,880.00 | ||||||||||
Bathymetric Survey | DABV01-03-R-2232 | DABV01-04-M-2135 | 2-Feb-04 | $57,000.00 | |||||||||||||||
CombUSAtion Turbine Parts - Taji | DABV01-04-Q-2310 | DABV01-04-M-2175 | 2-Feb-04 | $425,364.82 | OFFICE FURNITURE- WR CENTER (KARBALA) | DABV01-04-R-8087 | DABV01-04-M-8087 | 2-Feb-04 | $18,680.00 | ||||||||||
ACADEMY LIVING QUARTERS | DABV01-04-R-8093 | DABV01-04-M-8093 | 2-Feb-04 | $498,235.00 | |||||||||||||||
Pumps Boiler Feedwater | DABV01-03-Q-2154 | DABV01-04-M-2174 | 3-Feb-04 | $990,701.60 | GPS Handheld Radios for KBI | DABV01-03-Q-3001 | DABV01-04-M-3001 | 3-Feb-04 | $18,820.00 | ||||||||||
Base and Mobile Radios | DABV01-04-Q-0007 | DABV01-04-M-0021 | 3-Feb-04 | $1,609,500.00 | |||||||||||||||
ISSR 240 police sedans;36 4x4 dbl cab PU;36 single cab PU | DABV01-04-Q-5005 | DABV01-04-M-5056 | 3-Feb-04 | $4,905,600.00 | |||||||||||||||
Public Health Laboratory Equipment | DABV01-03-Q-5127 | DABV01-04-M-5001 | 4-Feb-04 | $217,392.00 | |||||||||||||||
AL BALGEES PRIMARY SCHOOL | DABV01-04-R-8054 | DABV01-04-M-8054 | 4-Feb-04 | $20,454.00 | |||||||||||||||
ROOF AND FENCE REPAIR- AL FURAT HOSPITAL | DABV01-04-R-8073 | DABV01-04-M-8073 | 4-Feb-04 | $49,650.00 | |||||||||||||||
SEWER SYSTEM- AL HAYY | DABV01-04-R-8076 | DABV01-04-M-8076 | 4-Feb-04 | $31,585.00 | |||||||||||||||
COOLING SYSTEM | DABV01-04-R-8078 | DABV01-04-M-8078 | 4-Feb-04 | $8,620.00 | |||||||||||||||
UTILIZATION FACILITIES- AL KUT | DABV01-04-R-8080 | DABV01-04-M-8080 | 4-Feb-04 | $31,493.00 | |||||||||||||||
TRAFFIC POLICE STATION- AL KUT | DABV01-04-R-8083 | DABV01-04-M-8083 | 4-Feb-04 | $142,720.00 | |||||||||||||||
Tower Renovation at Taji | N/A | DABV01-04-M-0009 | 4-Feb-04 | $15,000.00 | |||||||||||||||
Rehab Parking Lot | N/A | DABV01-04-M-0010 | 4-Feb-04 | $7,500.00 | |||||||||||||||
Primary Current Injection Test Set | DABV01-03-Q-2204 | DABV01-04-M-2181 | 5-Feb-04 | $11,802.00 | |||||||||||||||
Resins | DABV01-03-Q-2276 | DABV01-04-M-2183 | 5-Feb-04 | $187,330.00 | |||||||||||||||
Diyala IDP Heaters | DABV01-04-R-3037 | DABV01-04-C-3084 | 5-Feb-04 | $175,000.00 | |||||||||||||||
FATMA AL BARNWAY PRIMARY SCHOOL | DABV01-04-R-8011 | DABV01-04-M-8011 | 5-Feb-04 | $44,260.00 | |||||||||||||||
AL SHAYMA INTER. SCHOOL FOR GIRLS | DABV01-04-R-8012 | DABV01-04-M-8012 | 5-Feb-04 | $51,541.00 | |||||||||||||||
IBN-SINA SCHOOL | DABV01-04-R-8013 | DABV01-04-M-8013 | 5-Feb-04 | $32,841.00 | |||||||||||||||
DRAINAGE CHANNEL | DABV01-04-R-8014 | DABV01-04-M-8014 | 5-Feb-04 | $70,730.00 | |||||||||||||||
CONVEYING CLEAR WATER-HIT | DABV01-04-R-8015 | DABV01-04-M-8015 | 5-Feb-04 | $9,590.00 | |||||||||||||||
KARBALA HUMAN RIGHTS WATCH BUILDING | DABV01-04-R-8088 | DABV01-04-M-8088 | 5-Feb-04 | $75,369.00 | |||||||||||||||
Rotor Assy & Shaft Sleeve | DABV01-03-Q-2047 | DABV01-04-M-2179 | 6-Feb-04 | $129,516.00 | |||||||||||||||
Hydraulic Pumps for Steam Turbine | DABV01-03-Q-2050 | DABV01-04-m-2184 | 6-Feb-04 | $15,196.00 | |||||||||||||||
Rigid Inflatable Boat (RIB) for IRPS | DABV01-03-Q-5182 | DABV01-04-M-5054 | 6-Feb-04 | $521,638.00 | |||||||||||||||
Ranyia Orphanage Renovation | DABV01-03-R-3186 | DABV01-04-C-3058 | 6-Feb-04 | $12,430.00 | |||||||||||||||
Darbandikan Nursery Renovation | DABV01-03-R-3188 | DABV01-04-C-3061 | 6-Feb-04 | $16,990.00 | |||||||||||||||
Assaij S.W.A.T. Equipment | DABV01-03-R-3190 | DABV01-04-C-3060 | 6-Feb-04 | $58,610.00 | |||||||||||||||
Sulay Pediatric Center Renovation | DABV01-03-R-3191 | DABV01-04-C-3048 | 6-Feb-04 | $53,894.00 | |||||||||||||||
Kifri Nursery Renovation | DABV01-03-R-3194 | DABV01-04-C-3057 | 6-Feb-04 | $9,240.00 | |||||||||||||||
Penjwin Children Cntr Renovation | DABV01-03-R-3196 | DABV01-04-C-3059 | 6-Feb-04 | $13,825.00 | |||||||||||||||
Serwan Student Cntr Renovation | DABV01-03-R-3216 | DABV01-04-C-3056 | 6-Feb-04 | $30,241.00 | |||||||||||||||
TRANSFORMER SUBSTATIONS-KARBALA TOWN | DABV01-04-M-8027 | DABV01-04-M-8027 | 6-Feb-04 | $168,766.00 | |||||||||||||||
ELECTRIC APPLIANCES FOR KARABALA STAGE 3 | DABV01-04-M-8027 | DABV01-04-M-8027 | 6-Feb-04 | $168,766.00 | |||||||||||||||
ELECTRIC APPLIANCES ARBALLAS STAGE 4 | DABV01-04-M-8027 | DABV01-04-M-8027 | 6-Feb-04 | $168,765.00 | |||||||||||||||
ELECTRIC KIOSKS-AL HUSASIAN | DABV01-04-M-8027 | DABV01-04-M-8027 | 6-Feb-04 | $168,766.00 | |||||||||||||||
Finger Printing Material | NA | DABV01-04-M-0027 | 6-Feb-04 | $1,579.75 | Globe Valves for Boiler Feedwater & Tech Rep | DABV01-03-Q-2034 | DABV01-04-M-2186 | 7-Feb-04 | $486,813.00 | ||||||||||
GE Electrical Trip Devices | DABV01-03-Q-2102 | DABV01-04-M-2191 | 7-Feb-04 | $23,023.08 | Condensate Pump Suction Expansion joint | DABV01-03-Q-2108 | DABV01-04-M-2145 | 7-Feb-04 | $3,250.00 | ||||||||||
Mobile Hydraulic Cranes | DABV01-03-Q-2197/2299 | DABV01-04-M-2190 | 7-Feb-04 | $627,545.62 | Level Transmitters | DABV01-03-Q-2268 | DABV01-04-M-2182 | 7-Feb-04 | $9,585.00 | ||||||||||
CLIN 0003 of Public Health Equipment | DABV01-03-Q-5127 | DABV01-04-M-5007 | 7-Feb-04 | $32,487.00 | |||||||||||||||
Flame Monitoring Service | DABV01-03-R-2231 | DABV01-04-M-2192 | 7-Feb-04 | $1,469,036.50 | Vertical Sump Pumps | DABV01-04-Q-2290 | DABV01-04-M-2185 | 7-Feb-04 | $35,500.00 | ||||||||||
ASTM Standards Books & CDs | DABV01-04-Q-2296 | DABV01-04-M-2168 | 7-Feb-04 | $10,736.00 | |||||||||||||||
CombUSAtion Turbine Gaskets | DABV01-04-Q-2317 | DABV01-04-M-2189 | 7-Feb-04 | $1,377.30 | Kirkuk Mobile Phones | DABV01-04-Q-3027 | DABV01-04-M-3029 | 7-Feb-04 | $11,500.00 | ||||||||||
Kirkuk SlaughterhoUSAe Repair | DABV01-04-Q-3028 | DABV01-04-M-3030 | 7-Feb-04 | $5,000.00 | |||||||||||||||
P020 Mobile Sub Station | DABV01-04-Q-5001 | DABV01-04-M-5058 | 7-Feb-04 | $940,000.00 | |||||||||||||||
General & Special Clinic Equipment | DABV01-03-Q-5119 | DABV01-04-M-5003 | 8-Feb-04 | $63,045.00 | |||||||||||||||
Special Clinic Equipment | DABV01-03-Q-5119 | DABV01-04-M-5003 | 8-Feb-04 | $163,726.00 | |||||||||||||||
GEN AND SPECIAL MEDICAL EQUIP | DABV01-03-Q-5119 | DABV01-04-M-5059 | 8-Feb-04 | $16,293.00 | |||||||||||||||
GEN AND SPECIAL MEDICAL EQUIP | DABV01-03-Q-5119 | DABV01-04-M-5060 | 8-Feb-04 | $49,995.00 | |||||||||||||||
Kirkuk Univ College of Law | DABV01-03-R-3073 | DABV01-04-C-3085 | 8-Feb-04 | $114,000.00 | |||||||||||||||
Summayl Electrical Project | DABV01-03-R-3140 | DABV01-04-C-3086 | 8-Feb-04 | $182,927.00 | |||||||||||||||
Carbon Steel Pipe (Nassiriyah) | DABV01-04-Q-2195 | DABV01-04-M-2178 | 8-Feb-04 | $22,065.00 | |||||||||||||||
Kirkuk DMV Desktop Computers | DABV01-04-Q-3002 | DABV01-04-M-3002 | 8-Feb-04 | $20,920.00 | |||||||||||||||
SPORTS HALL- AL KUT | DABV01-04-R-8079 | DABV01-04-M-8079 | 8-Feb-04 | $116,000.00 | |||||||||||||||
AL METHAK PRIMARY SCHOOL | DABV01-04-R-8.00 | ||||||||||||||||||
DABV01-04-M-8.00 | |||||||||||||||||||
8-Feb-04 | $17,302.00 | ||||||||||||||||||
AL NASSIR PRIMARY SCHOOL | DABV01-04-R-8101 | DABV01-04-M-8101 | 8-Feb-04 | $14,415.00 | |||||||||||||||
BADRA SECONDARY SCHOOL | DABV01-04-R-8102 | DABV01-04-M-8102 | 8-Feb-04 | $17,063.00 | |||||||||||||||
BADRA PRIMARY SCHOOL FOR GIRLS | DABV01-04-R-8103 | DABV01-04-M-8103 | 8-Feb-04 | $31,115.00 | |||||||||||||||
BADRA PRIMARY SCHOOL | DABV01-04-R-8104 | DABV01-04-M-8104 | 8-Feb-04 | $25,121.00 | |||||||||||||||
THURAT AL ISHRIN SCHOOL | DABV01-04-R-8105 | DABV01-04-M-8105 | 8-Feb-04 | $13,098.00 | |||||||||||||||
AL TAKAFIL PRIMARY SCHOOL | DABV01-04-R-8106 | DABV01-04-M-8106 | 8-Feb-04 | $17,015.00 | |||||||||||||||
AL MUHANAD PRIMARY SCHOOL | DABV01-04-R-8107 | DABV01-04-M-8107 | 8-Feb-04 | $31,241.00 | |||||||||||||||
AL SHAMAEL PRIMARY SCHOOL | DABV01-04-R-8109 | DABV01-04-M-8109 | 8-Feb-04 | $26,464.00 | |||||||||||||||
AL SHAAB PRIMARY SCHOOL | DABV01-04-R-8110 | DABV01-04-M-8110 | 8-Feb-04 | $22,274.00 | |||||||||||||||
AL BAGHDAD PRIMARY SCHOOL | DABV01-04-R-8111 | DABV01-04-M-8111 | 8-Feb-04 | $9,026.00 | |||||||||||||||
AL KISSAEE PRIMARY SCHOOL | DABV01-04-R-8112 | DABV01-04-M-8112 | 8-Feb-04 | $24,169.00 | |||||||||||||||
AL DOUBUNI SECONDARY SCHOOL | DABV01-04-R-8113 | DABV01-04-M-8113 | 8-Feb-04 | $17,685.00 | |||||||||||||||
AL ENSAF PRIMARY SCHOOL | DABV01-04-R-8114 | DABV01-04-M-8114 | 8-Feb-04 | $29,870.00 | |||||||||||||||
AL AHRAR PRIMARY SCHOOL | DABV01-04-R-8115 | DABV01-04-M-8115 | 8-Feb-04 | $25,195.00 | |||||||||||||||
YOUNIS AL SABAWY SCHOOL | DABV01-04-R-8116 | DABV01-04-M-8116 | 8-Feb-04 | $21,020.00 | |||||||||||||||
Renovation Wiedah Tech School | N/A | DABV01-04-M-0030 | 8-Feb-04 | $100,397.00 | |||||||||||||||
Construction Supplies | NA | DABV01-04-M-0029 | 8-Feb-04 | $6,129.00 | |||||||||||||||
Suk Alshuyuk Technical High School | [n/a] | DABV01-04-M-5062 | 9-Feb-04 | $134,431.00 | |||||||||||||||
Houiash Water Treatment | DABV01-03-C-3015 | DABV01-04-C-3089 | 9-Feb-04 | $28,979.00 | |||||||||||||||
Digital Multiplexers | DABV01-03-Q-2248 | DABV01-04-M-2193 | 9-Feb-04 | $111,147.58 | Al Alay Water Treatment | DABV01-03-R-3071 | DABV01-04-C-3090 | 9-Feb-04 | $25,200.00 | ||||||||||
Nawfal Water Treatment | DABV01-03-R-3107 | DABV01-04-C-3091 | 9-Feb-04 | $31,344.00 | |||||||||||||||
Abu Khamees Water Treatment | DABV01-03-R-3108 | DABV01-04-C-3088 | 9-Feb-04 | $35,560.00 | |||||||||||||||
Baqubah Fiber Optic Cable | DABV01-03-R-3130 | DABV01-04-C-3087 | 9-Feb-04 | $55,700.00 | |||||||||||||||
High Pressure R.O. Feed Pump | DABV01-04-Q-2113 | DABV01-04-M-2144 | 9-Feb-04 | $323,585.00 | |||||||||||||||
SDMO Generator Training | DABV01-04-Q-2278 | DABV01-04-M-2194 | 9-Feb-04 | $251,181.00 | |||||||||||||||
IPS Comic Book | NA | DABV01-04-M-0034 | 9-Feb-04 | $2,500.00 | |||||||||||||||
Retirement Office | [n/a] | DABV01-04-M-5009 | 10-Feb-04 | $42,663.00 | |||||||||||||||
Gas Turbine Parts (Al Qudas) | DABV01-03-Q-2289 | DABV01-04-M-2188 | 10-Feb-04 | $9,026,380.08 | Baqubah Food for Town Hall | DABV01-04-Q-3017 | DABV01-04-M-3017 | 10-Feb-04 | $260.00 | ||||||||||
AN NUMANIYAH AMBULANCES | DABV01-04-R-8009 | DABV01-04-M-8009 | 10-Feb-04 | $40,500.00 | |||||||||||||||
AL KUT AMBULANCES | DABV01-04-R-8009 | DABV01-04-M-8030 | 10-Feb-04 | $40,350.00 | |||||||||||||||
AL HAYY AMBULANCES | DABV01-04-R-8009 | DABV01-04-M-8031 | 10-Feb-04 | $40,500.00 | |||||||||||||||
AZ AZIZIYAH AMBULANCES | DABV01-04-R-8009 | DABV01-04-M-8032 | 10-Feb-04 | $41,712.00 | |||||||||||||||
AS SUWAYRAH AMBULANCES | DABV01-04-R-8009 | DABV01-04-M-8033 | 10-Feb-04 | $32,280.00 | |||||||||||||||
TRIBAL DEMOCRACY CENTER- AL KUT | DABV01-04-R-8128 | DABV01-04-M-8128 | 10-Feb-04 | $62,313.00 | |||||||||||||||
Internet Site for Basrah Technical Institute | [n/a] | DABV01-04-M-5063 | 11-Feb-04 | $32,524.00 | |||||||||||||||
Internet Site for Basrah Technical College | [n/a] | DABV01-04-M-5064 | 11-Feb-04 | $36,860.00 | |||||||||||||||
Internet Site for University of Basrah Graduate Center | [n/a] | DABV01-04-M-5065 | 11-Feb-04 | $22,038.00 | |||||||||||||||
Spherical Roller ThrUSAt Bearing | DABV01-03-Q-2237 | DABV01-04-M-2199 | 11-Feb-04 | $41,797.30 | Walaty Zhery Bridge | DABV01-03-R-3074 | DABV01-04-C-3094 | 11-Feb-04 | $265,855.00 | ||||||||||
Renovation of Al Shagat Hospital | DABV01-03-R-3096 | DABV01-04-C-3095 | 11-Feb-04 | $192,565.00 | |||||||||||||||
AK-47 Armorer Kits/BFAs/Blanks | DABV01-04-Q-0016 | DABV01-04-M-0037 | 11-Feb-04 | $228,400.00 | |||||||||||||||
AL JAZER RIVER ROAD | DABV01-04-R-8129 | DABV01-04-M-8129 | 11-Feb-04 | $27,154.00 | |||||||||||||||
Level Transmitters | DABV01-03-Q-2106 | DABV01-04-M-2198 | 12-Feb-04 | $10,333.04 | Landfill Bulldozer | DABV01-03-R-3048 | DABV01-04-C-3099 | 12-Feb-04 | $190,000.00 | ||||||||||
Shuhada Power Distribution | DABV01-03-R-3142 | DABV01-04-C-3101 | 12-Feb-04 | $28,652.00 | |||||||||||||||
Aqrah Electrical Distribution | DABV01-03-R-3143 | DABV01-04-C-3102 | 12-Feb-04 | $299,230.00 | |||||||||||||||
Renovation of Bawra School | DABV01-03-R-3157 | DABV01-04-C-3035 | 12-Feb-04 | $81,605.00 | |||||||||||||||
Basirma Government Building | DABV01-03-R-3162 | DABV01-04-C-3082 | 12-Feb-04 | $40,309.00 | |||||||||||||||
Emerg HoUSAing-Kalak Village | DABV01-03-R-3167 | DABV01-04-C-3096 | 12-Feb-04 | $194,670.00 | |||||||||||||||
Emerg HoUSAing-Shikhanan Village | DABV01-03-R-3168 | DABV01-04-C-3097 | 12-Feb-04 | $454,230.00 | |||||||||||||||
Kurdish Academy Completion | DABV01-03-R-3169 | DABV01-04-C-3098 | 12-Feb-04 | $254,726.00 | |||||||||||||||
Renvovate Kurdish Writer's Union | DABV01-03-R-3170 | DABV01-04-C-3039 | 12-Feb-04 | $52,760.00 | |||||||||||||||
AL HAYDERIA AGRICULTURAL BUILDING | DABV01-04-M-8134 | DABV01-04-M-8134 | 12-Feb-04 | $36,125.00 | |||||||||||||||
Iraqi NGO Office Repair | DABV01-04-Q-3024 | DABV01-04-M-3026 | 12-Feb-04 | $10,000.00 | |||||||||||||||
Doli Ballyan Valley Water Projects | DABV01-04-R-3042 | DABV01-04-C-3.00 | |||||||||||||||||
12-Feb-04 | $116,410.00 | ||||||||||||||||||
Digala Park Construction | DABV01-04-R-3043 | DABV01-04-C-3079 | 12-Feb-04 | $33,665.00 | |||||||||||||||
Cultural Center for Koya | DABV01-04-R-3044 | DABV01-04-C-3080 | 12-Feb-04 | $45,014.00 | |||||||||||||||
Digala Water Distribution | DABV01-04-R-3047 | DABV01-04-C-3077 | 12-Feb-04 | $93,319.00 | |||||||||||||||
Hareer Girl's School Renovation | DABV01-04-R-3050 | DABV01-04-C-3092 | 12-Feb-04 | $137,773.00 | |||||||||||||||
COUNTER TERROR EQUIP-TOOLS | DABV01-04-R-8096 | DABV01-04-M-8096 | 12-Feb-04 | $45,300.00 | |||||||||||||||
WATER TREATMENT PUMPS- MUSASAYIB | DABV01-04-R-8130 | DABV01-04-M-8130 | 12-Feb-04 | $58,000.00 | |||||||||||||||
MUSASAYIB UNIT #4 AIR COMPRESSOR REHAB | DABV01-04-R-8131 | DABV01-04-M-8131 | 12-Feb-04 | $71,942.00 | |||||||||||||||
BOILER CAMERA- MUSASAYIB | DABV01-04-R-8132 | DABV01-04-M-8132 | 12-Feb-04 | $13,600.00 | |||||||||||||||
JAMJAH ROAD (ETHNEIN) | DABV01-04-R-8135 | DABV01-04-M8135 | 12-Feb-04 | $17,685.00 | |||||||||||||||
BABYLON FOOT BRIDGE | DABV01-04-R-8136 | DABV01-04-M-8136 | 12-Feb-04 | $65,000.00 | |||||||||||||||
AL MAALE SCHOOL-KIFL | DABV01-04-R-8137 | DABV01-04-M-8137 | 12-Feb-04 | $117,050.00 | |||||||||||||||
AL NOAMAN PRIMARY SCHOOL | DABV01-04-R-8138 | DABV01-04-M-8138 | 12-Feb-04 | $112,281.00 | |||||||||||||||
Power Plant Air Heat Motor | DABV01-03-Q-2054 | DABV01-04-M-2.00 | |||||||||||||||||
13-Feb-04 | $4,107.20 | Turbine Parts (Daura) | DABV01-03-Q-2060 | DABV01-04-M-2187 | 13-Feb-04 | $1,095,483.60 | Gaskets | DABV01-03-Q-2129 | DABV01-04-M-2201 | 13-Feb-04 | $2,752.35 | Differential Pressure Controllers & Transmitters | DABV01-03-Q-2245 | DABV01-04-M-2202 | 13-Feb-04 | $44,000.00 | |||
Tawellah Retaining Wall Construct | DABV01-03-R-3192 | DABV01-04-C-3083 | 13-Feb-04 | $69,650.00 | |||||||||||||||
Byara Bridge Reconstruction | DABV01-03-R-3202 | DABV01-04-C-3062 | 13-Feb-04 | $37,965.00 | |||||||||||||||
Ahmad Awa Classroom Renovation | DABV01-03-R-3205 | DABV01-04-C-3063 | 13-Feb-04 | $18,195.00 | |||||||||||||||
Kirkuk Badging Office Equipment | DABV01-04-Q-3010 | DABV01-04-M-3010 | 13-Feb-04 | $24,478.83 | COUNTER TERROR-ARMOR PL | DABV01-04-R-8097 | DABV01-04-M-8097 | 13-Feb-04 | $42,000.00 | ||||||||||
PMO Bld. Prep and Site Clean-up | NA | DABV01-04-M-0035 | 13-Feb-04 | $46,600.00 | |||||||||||||||
Road Work Projects for Muthanna | [n/a] | DABV01-04-M-5066 | 14-Feb-04 | $217,155.00 | |||||||||||||||
Safety Equipment for Power Stations | [n/a] | DABV01-04-M-5070 | 14-Feb-04 | $133,338.00 | |||||||||||||||
Jetter Trailers | DABV01-03-Q-5130 | DABV01-04-M-5067 | 14-Feb-04 | $331,024.00 | |||||||||||||||
Al Alam Soccer Field | DABV01-04-Q-3033 | DABV01-04-M-3035 | 14-Feb-04 | $5,000.00 | |||||||||||||||
ISSR 240 police car radios | DABV01-04-Q-5006 | DABV01-04-M-5061 | 14-Feb-04 | $233,520.00 | |||||||||||||||
Fuel Conditioning Chemicals (Al Qudas) | DABV01-03-Q-2236 | DABV01-04-M-2205 | 15-Feb-04 | $397,416.96 | Zahko Growth Water Center | DABV01-03-R-3070 | DABV01-04-C-3103 | 15-Feb-04 | $39,840.00 | ||||||||||
Mulla Abdulla Blankets & Heaters | DABV01-04-Q-3030 | DABV01-04-M-3032 | 15-Feb-04 | $6,000.00 | |||||||||||||||
Tuz Police Station Repairs & Billboards | DABV01-04-Q-3031 | DABV01-04-M-3033 | 15-Feb-04 | $10,281.00 | |||||||||||||||
Salah Ah Din Police Academy | DABV01-04-R-3052 | DABV01-04-C-3104 | 15-Feb-04 | $348,696.00 | |||||||||||||||
NEW WATER NETWORK- AL KAJEAIA | DABV01-04-R-8120 | DABV01-04-M-8120 | 15-Feb-04 | $28,986.00 | |||||||||||||||
NEW WATER NETWORK- AL BOHEDARY | DABV01-04-R-8121 | DABV01-04-M-8121 | 15-Feb-04 | $6,027.00 | |||||||||||||||
NEW WATER NETWORK- AM NENA | DABV01-04-R-8122 | DABV01-04-M-8122 | 15-Feb-04 | $19,088.00 | |||||||||||||||
NEW WATER NETWORK- AL ALBO KANGER | DABV01-04-R-8123 | DABV01-04-M-8123 | 15-Feb-04 | $6,053.00 | |||||||||||||||
NEW WATER NETWORK- AL MHJRA | DABV01-04-R-8124 | DABV01-04-M-8124 | 15-Feb-04 | $18,680.00 | |||||||||||||||
NEW WATER NETWORK- TABER FORAWN | DABV01-04-R-8125 | DABV01-04-M-8125 | 15-Feb-04 | $6,009.00 | |||||||||||||||
NEW WATER CONNECTION- AL RMOL | DABV01-04-R-8126 | DABV01-04-M-8126 | 15-Feb-04 | $9,577.00 | |||||||||||||||
PUMPING STATION MAINTENANCE | DABV01-04-R-8127 | DABV01-04-M-8127 | 15-Feb-04 | $17,016.00 | |||||||||||||||
REPAIR SEWAGE NETWROK- AL HINDYA | DABV01-04-R-8141 | DABV01-04-M-8141 | 15-Feb-04 | $15,630.00 | |||||||||||||||
BUILDING IMPROVEMENTS- KARBALA WOMEN'S RIGHTS CENTER | DABV01-04-R-8169 | DABV01-04-M-8169 | 15-Feb-04 | $36,000.00 | |||||||||||||||
OFFICE EQUIPMENT- DIWANIYAH TRIBAL DEMOCRAC CENTER | DABV01-04-R-8170 | DABV01-04-M-8170 | 15-Feb-04 | $73,435.00 | |||||||||||||||
15 BORDER POLIC DIESAL PUSA (THRU Dutch) | [n/a] | DABV01-04-M-5074 | 16-Feb-04 | $240,000.00 | |||||||||||||||
Transmitters & Misc. Test Equipment | DABV01-03-Q-2070 | DABV01-04-M-2208 | 16-Feb-04 | $4,764.26 | Pneumatic Level Transmitters | DABV01-03-Q-2267 | DABV01-04-M-2180 | 16-Feb-04 | $13,469.40 | Youth Development Ctr Furniture | DABV01-03-R-3061 | DABV01-04-C-3110 | 16-Feb-04 | $34,443.75 | Youth Development Ctr Computers | DABV01-03-R-3061 | DABV01-04-C-3111 | 16-Feb-04 | $11,170.00 |
Derbanei Village IDP Homes | DABV01-03-R-3150 | DABV01-04-C-3106 | 16-Feb-04 | $299,553.00 | |||||||||||||||
Gre'Beye Village IDP Homes | DABV01-03-R-3151 | DABV01-04-C-3107 | 16-Feb-04 | $299,699.00 | |||||||||||||||
Enishki Village IDP Homes | DABV01-03-R-3152 | DABV01-04-C-3108 | 16-Feb-04 | $129,871.00 | |||||||||||||||
Swaratoka Village IDP Homes | DABV01-03-R-3153 | DABV01-04-C-3109 | 16-Feb-04 | $289,971.00 | |||||||||||||||
WATER SYSTEM- AL HAYY | DABV01-04-M-8075 | DABV01-04-M-8075 | 16-Feb-04 | $17,200.00 | |||||||||||||||
AL ENTESSERAT PRIMARY SCHOOL | DABV01-04-M-8117 | DABV01-04-M-8117 | 16-Feb-04 | $20,654.00 | |||||||||||||||
AL FEKER PRIMARY SCHOOL | DABV01-04-M-8118 | DABV01-04-M-8118 | 16-Feb-04 | $30,887.00 | |||||||||||||||
GEEP GENERATOR | DABV01-04-M-8144 | DABV01-04-M-8144 | 16-Feb-04 | $32,000.00 | |||||||||||||||
ELECTRICAL POWER TOOLS | DABV01-04-M-8145 | DABV01-04-M-8145 | 16-Feb-04 | $76,481.00 | |||||||||||||||
PARKING LOT AND DRIVE- MUSASAYIB PP | DABV01-04-M-8146 | DABV01-04-M-8146 | 16-Feb-04 | $27,025.00 | |||||||||||||||
Differential Pressure Gauges | DABV01-04-Q-2208 | DABV01-04-M-2204 | 16-Feb-04 | $35,116.00 | |||||||||||||||
Electronic Instrument Converter - Hartha | DABV01-04-Q-2257 | DABV01-04-M-2206 | 16-Feb-04 | $6,242.00 | |||||||||||||||
Roller Bearings - Nassiryah | DABV01-04-Q-2316 | DABV01-04-M-2207 | 16-Feb-04 | $18,678.91 | Fadia-Namrik Road Repair | DABV01-04-R-3022 | DABV01-04-C-3105 | 16-Feb-04 | $73,420.00 | ||||||||||
Hareer SlaughterhoUSAe Renovation | DABV01-04-R-3064 | DABV01-04-C-3081 | 16-Feb-04 | $22,558.00 | |||||||||||||||
Haji Omaran School Renovation | DABV01-04-R-3136 | DABV01-04-C-3036 | 16-Feb-04 | $23,283.00 | |||||||||||||||
DIWANIYAH TELEVISION STN. | DABV01-04-R-8151 | DABV01-04-M-8151 | 16-Feb-04 | $52,536.00 | |||||||||||||||
ISKAN BMB HOME REPAIRS | DABV01-04-R-8166 | DABV01-04-M-8166 | 16-Feb-04 | $47,233.00 | |||||||||||||||
Internet Links for Health Sector | [n/a] | DABV01-04-M-5071 | 17-Feb-04 | $56,855.00 | |||||||||||||||
Hydrogen Seals - MUSAsayib | DABV01-03-Q-2307 | DABV01-04-M-2154 | 17-Feb-04 | $231,108.40 | |||||||||||||||
DRD Equipment & Training | DABV01-03-R-3060 | DABV01-04-C-3112 | 17-Feb-04 | $59,869.00 | |||||||||||||||
Uniforms | DABV01-04-Q-0009 | DABV01-04-M-0026 | 17-Feb-04 | $448,000.00 | |||||||||||||||
SCREENING TM EQUIP | DABV01-04-R-8143 | DABV01-04-M-8143 | 17-Feb-04 | $23,805.00 | |||||||||||||||
SCREENING BLDG RENOVATE | DABV01-04-R-8147 | DABV01-04-M-8147 | 17-Feb-04 | $23,825.00 | |||||||||||||||
Rotor Shaft & Impeller | DABV01-03-Q-2255 | DABV01-04-M-2203 | 18-Feb-04 | $710,600.00 | |||||||||||||||
ISSR 1600 sets of Level IV Body Armor | DABV01-04-Q-5007 | DABV01-04-M-5073 | 18-Feb-04 | $314,112.00 | |||||||||||||||
AL QADISIYAH JUDICIARY PCS | DABV01-04-R-8119 | DABV01-04-M-8119 | 18-Feb-04 | $14,108.00 | |||||||||||||||
IRRIGATION PUMP STATION- METRIC | DABV01-04-R-8148 | DABV01-04-M-8148 | 18-Feb-04 | $49,925.00 | |||||||||||||||
IRRIGATION PUMP STATION- VERTICAL | DABV01-04-R-8149 | DABV01-04-M-8149 | 18-Feb-04 | $116,000.00 | |||||||||||||||
SEWAGE PUMPING STATION- AL SUWEIRA | DABV01-04-R-8150 | DABV01-04-M-8150 | 18-Feb-04 | $93,048.00 | |||||||||||||||
RECONSTRUCTION OF ENGINEERING BUILDING | DABV01-04-R-8155 | DABV01-04-M-8155 | 18-Feb-04 | $59,913.00 | |||||||||||||||
IP CLOTHING | DABV01-04-R-8161 | DABV01-04-M-8161 | 18-Feb-04 | $300,000.00 | |||||||||||||||
IP NIGHTSTICKS(KARBALA) | DABV01-04-R-8163 | DABV01-04-M-8163 | 18-Feb-04 | $30,000.00 | |||||||||||||||
IP WHISTLES-KARBALA | DABV01-04-R-8163 | DABV01-04-M-8163 | 18-Feb-04 | $6,000.00 | |||||||||||||||
IP HANDCUFFS-KARBALA | DABV01-04-R-8163 | DABV01-04-M-8163 | 18-Feb-04 | $150,000.00 | |||||||||||||||
Street Furniture | [n/a] | DABV01-04-M-5018 | 19-Feb-04 | $116,815.00 | |||||||||||||||
Compressor Motor | DABV01-03-Q-0015 | DABV01-04-M-2218 | 19-Feb-04 | $33,683.44 | |||||||||||||||
Oval Wheel Flow Meter | DABV01-03-Q-2074 | DABV01-04-M-2209 | 19-Feb-04 | $10,721.00 | |||||||||||||||
Gasket Material | DABV01-03-Q-2169 | DABV01-04-M-2216 | 19-Feb-04 | $2,700.00 | |||||||||||||||
Snow Plows & Vehicles - Soran | DABV01-03-R-3159 | DABV01-04-C-3114 | 19-Feb-04 | $151,000.00 | |||||||||||||||
Snow Plows & Vehicles - Shaqlawa | DABV01-03-R-3166 | DABV01-04-C-3113 | 19-Feb-04 | $151,000.00 | |||||||||||||||
Turbine Parts - Khor Zubair | DABV01-04-Q-2146 | DABV01-04-M-2210 | 19-Feb-04 | $335,387.00 | |||||||||||||||
Pressure Switches | DABV01-04-Q-2228 | DABV01-04-M-2219 | 19-Feb-04 | $38,146.50 | |||||||||||||||
IP ATV | DABV01-04-R-8160 | DABV01-04-M-8160 | 19-Feb-04 | $81,000.00 | |||||||||||||||
HUMAN RIGHTS TRAINING | DABV01-04-R-8164 | DABV01-04-M-8164 | 19-Feb-04 | $196,044.00 | |||||||||||||||
Old Port Fire Station | [n/a] | DABV01-04-M-5019 | 20-Feb-04 | $12,646.00 | |||||||||||||||
Air Compressor Parts | DABV01-03-Q-0027 | DABV01-04-M-2050 | 20-Feb-04 | $30,276.44 | Siemens Cntrol Card & Parts/Assemblies | DABV01-03-Q-2017/2006 | DABV01-04-M-2214 | 20-Feb-04 | $1,278,211.56 | ||||||||||
Aux. Steam Valves (MUSAsayib) | DABV01-03-Q-2166 | DABV01-04-M-2221 | 20-Feb-04 | $85,892.00 | |||||||||||||||
Temperature Recorder | DABV01-03-Q-2273 | DABV01-04-M-2232 | 20-Feb-04 | $8,000.00 | |||||||||||||||
Transistors | DABV01-04-Q-2322 | DABV01-04-M-2220 | 20-Feb-04 | $932.86 | Soran Institute for Handicap | DABV01-04-R-3045 | DABV01-04-C-3093 | 20-Feb-04 | $83,552.50 | ||||||||||
AGRICULTURE TRAINING CENTER | DABV01-04-R-8082 | DABV01-04-M-8082 | 20-Feb-04 | $32,733.00 | |||||||||||||||
500 KVA GENERATOR | DABV01-04-R-8165 | DABV01-04-M-8165 | 20-Feb-04 | $105,000.00 | |||||||||||||||
DEMOLITION OF BA'ATH PARTY HEADQUARTERS | DABV01-04-R-8167 | DABV01-04-M-8167 | 20-Feb-04 | $452,800.00 | |||||||||||||||
Renovate Youth Ctr | N/A | DABV01-04-M-0032 | 20-Feb-04 | $79,310.00 | |||||||||||||||
Refurbishment of the Central Bank in Basrah | [n/a] | DABV01-04-M-5076 | 21-Feb-04 | $304,227.00 | |||||||||||||||
Sewage Trucks for Thi-Qar Province | [n/a] | DABV01-04-M-5077 | 21-Feb-04 | $490,000.00 | |||||||||||||||
Solenoid Valves | DABV01-03-Q-2039 | DABV01-04-M-2236 | 21-Feb-04 | $9,320.00 | |||||||||||||||
Babbit Material | DABV01-03-Q-2117 | DABV01-04-M-2223 | 21-Feb-04 | $1,115.77 | |||||||||||||||
Indicator Light Bulbs | DABV01-03-Q-2214 | DABV01-04-M-2222 | 21-Feb-04 | $2,752.35 | Tubular Packing | DABV01-03-Q-2274 | DABV01-04-M-2237 | 21-Feb-04 | $10,575.00 | ||||||||||
Contactor Magnetic Starter | DABV01-03-Q-2319 | DABV01-04-M-2215 | 21-Feb-04 | $8,500.00 | |||||||||||||||
Digital Thickness Gauge, Hardness Tester, Portable Flaw Detector | DABV01-04-Q-2309 | DABV01-04-M-2224 | 21-Feb-04 | $37,602.00 | |||||||||||||||
W011-14 Water Pipeline Equipment - CPA 004 | DABV01-04-Q-5002 | DABV01-04-M-5016 | 21-Feb-04 | $140,788.00 | |||||||||||||||
Six Dbl Cab Pickup Trucks | DABV01-04-Q-5004 | DABV01-04-M-5075 | 21-Feb-04 | $60,000.00 | |||||||||||||||
72 hf RADIOS; 26 BASE Stations | DABV01-04-Q-5005 | DABV01-04-M-5069 | 21-Feb-04 | $519,866.00 | |||||||||||||||
Kirkuk College of Nursing | DABV01-03-R-3072 | DABV01-04-C-3119 | 22-Feb-04 | $156,715.00 | |||||||||||||||
Baqubah School of Nursing | DABV01-03-R-3131 | DABV01-04-C-3120 | 22-Feb-04 | $90,179.00 | |||||||||||||||
Pneumatic Positioned Locking Valve | DABV01-04-Q-2075 | DABV01-04-M-2225 | 22-Feb-04 | $4,340.00 | |||||||||||||||
Tuz Police Station Repairs | DABV01-04-Q-3031 | DABV01-04-M-3033 | 22-Feb-04 | $5,000.00 | |||||||||||||||
Ryadh School Renovations | DABV01-04-R-3001 | DABV01-04-C-3121 | 22-Feb-04 | $101,930.00 | |||||||||||||||
Kalar Police Station Renovation | DABV01-04-R-3008 | DABV01-04-C-3122 | 22-Feb-04 | $15,313.00 | |||||||||||||||
Gov't Security Building Renovation | DABV01-04-R-3009 | DABV01-04-C-3123 | 22-Feb-04 | $49,505.00 | |||||||||||||||
Altun Kupri Sewage Channels | DABV01-04-R-3021 | DABV01-04-C-3124 | 22-Feb-04 | $28,770.00 | |||||||||||||||
Kirkuk Street Lights | DABV01-04-R-3057 | DABV01-04-C-3118 | 22-Feb-04 | $64,356.00 | |||||||||||||||
WASIT IP SALOON CARS | DABV01-04-R-8171 | DABV01-04-M-8171 | 22-Feb-04 | $190,000.00 | |||||||||||||||
TRIBAL DEMO TRANSPORT | DABV01-04-R-8173 | DABV01-04-M-8173 | 22-Feb-04 | $46,000.00 | |||||||||||||||
RADIO STATION GENERATOR | DABV01-04-R-8177 | DABV01-04-M-8177 | 22-Feb-04 | $25,500.00 | |||||||||||||||
Hydrogen Systems Review | DABV01-04-Q-2211 | DABV01-04-M-2195 | 23-Feb-04 | $20,700.00 | |||||||||||||||
Motors | DABV01-04-Q-2287 | DABV01-04-M-2241 | 23-Feb-04 | $44,092.00 | |||||||||||||||
High Speed Temperature Bearings | DABV01-04-Q-2301 | DABV01-04-M-2240 | 23-Feb-04 | $4,800.00 | |||||||||||||||
Power Plant Steam Valves | DABV01-03-Q-2148 | DABV01-04-M-2227 | 24-Feb-04 | $64,095.00 | |||||||||||||||
Furnace Sight Glass | DABV01-03-Q-2172 | DABV01-04-M-2196 | 24-Feb-04 | $4,461.25 | |||||||||||||||
Potentiometer Transmitter | DABV01-03-Q-2264 | DABV01-04-M-2242 | 24-Feb-04 | $3,870.00 | |||||||||||||||
Erbil Fine Arts Institute Instruments | DABV01-03-R-3062 | DABV01-04-C-3128 | 24-Feb-04 | $6,665.00 | |||||||||||||||
Erbil Fine Arts Institute Computers | DABV01-03-R-3062 | DABV01-04-C-3129 | 24-Feb-04 | $7,325.00 | |||||||||||||||
Diyala Traffic Lights Repair | DABV01-03-R-3134 | DABV01-04-C-3127 | 24-Feb-04 | $38,850.00 | |||||||||||||||
Kavtrasor Elecric Distribution Repair | DABV01-03-R-3139 | DABV01-04-C-3125 | 24-Feb-04 | $176,518.00 | |||||||||||||||
Armish Electric Distribution Repair | DABV01-03-R-3147 | DABV01-04-C-3126 | 24-Feb-04 | $345,688.00 | |||||||||||||||
Laminated Graphite Products, Eurosket | DABV01-04-Q-2277 | DABV01-04-M-2243 | 24-Feb-04 | $201,527.15 | Thyristors & FUSAes | DABV01-04-Q-2304 | DABV01-04-M-2212 | 24-Feb-04 | $22,410.00 | ||||||||||
Electronic Recorder | DABV01-04-Q-2318 | DABV01-04-M-2226 | 24-Feb-04 | $85,366.00 | |||||||||||||||
Tikrit Drug WarehoUSAe Electrical Work | DABV01-04-Q-3041 | DABV01-04-M-3043 | 24-Feb-04 | $12,673.00 | |||||||||||||||
Site Security of 3KM Site Near BIAP | DABV01-04-R-0014 | DABV01-04-C-0013 | 24-Feb-04 | $1,247,422.00 | |||||||||||||||
MEDICAL SUPPLIES | DABV01-04-R-8133 | DABV01-04-M-8133 | 24-Feb-04 | $13,570.00 | |||||||||||||||
SEWAGE DUMP INTAKE | DABV01-04-R-8152 | DABV01-04-M-8152 | 24-Feb-04 | $19,880.00 | |||||||||||||||
HILLA SEWER | DABV01-04-R-8153 | DABV01-04-M-8153 | 24-Feb-04 | $81,200.00 | |||||||||||||||
SEWAGE PUMP | DABV01-04-R-8154 | DABV01-04-M-8154 | 24-Feb-04 | $29,500.00 | |||||||||||||||
FURNITURE-HUMAN RIGHTS | DABV01-04-R-8168 | DABV01-04-M-8168 | 24-Feb-04 | $17,745.00 | |||||||||||||||
BABIL RADIO EQUIPMENT | DABV01-04-R-8178 | DABV01-04-M-8178 | 24-Feb-04 | $27,061.00 | |||||||||||||||
ISHTAR NEWSPAPER OFFICE EQUIPMENT | DABV01-04-R-8179 | DABV01-04-M-8179 | 24-Feb-04 | $8,328.00 | |||||||||||||||
BUSAes | N/A | DABV01-04-M-0039 | 24-Feb-04 | $168,000.00 | |||||||||||||||
Fingerprint Kits | N/A | DABV01-04-M-0041 | 24-Feb-04 | $605.00 | |||||||||||||||
Power Supply | DABV01-03-Q-0076 | DABV01-04-M-2235 | 25-Feb-04 | $620.00 | |||||||||||||||
AC Tachometer GE | DABV01-03-Q-2103 | DABV01-04-M-2244 | 25-Feb-04 | $6,832.00 | |||||||||||||||
Gland Packing | DABV01-03-Q-2270 | DABV01-04-M-2211 | 25-Feb-04 | $58,567.50 | UPS for TV/Radio Station in Diyala | DABV01-03-R-3129 | DABV01-04-C-3130 | 25-Feb-04 | $52,700.00 | ||||||||||
Oil Burner Parts (Al Qudas) | DABV01-04-Q-2219 | DABV01-04-M-2239 | 25-Feb-04 | $148,000.00 | |||||||||||||||
Maintenance Materials | DABV01-04-Q-2293 | DABV01-04-M-2245 | 25-Feb-04 | $15,044.04 | Gas Recirculation Fans | DABV01-04-Q-2302 | DABV01-04-M-2213 | 25-Feb-04 | $801,392.00 | ||||||||||
OPC Monthly Bulletins | DABV01-04-Q-3037 | DABV01-04-M-3037 | 25-Feb-04 | $11,150.00 | |||||||||||||||
MESHKAB COUNCIL BLDG | DABV01-04-R-8007 | DABV01-04-M-8007 | 25-Feb-04 | $27,747.00 | |||||||||||||||
CONSTITUTIONAL WORKSHOP | DABV01-04-R-8203 | DABV01-04-M-8203 | 25-Feb-04 | $89,404.00 | |||||||||||||||
UofD Womens' Dorm Renovation | DABV01-03-R-3127 | DABV01-04-C-3131 | 26-Feb-04 | $423,663.00 | |||||||||||||||
Centrifugal Pumps | DABV01-04-Q-2292 | DABV01-04-M-2246 | 26-Feb-04 | $19,676.00 | |||||||||||||||
ASME Code (Print) | DABV01-04-Q-2295 | DABV01-04-M-2250 | 26-Feb-04 | $9,210.23 | Pressure Switches | DABV01-04-Q-2320 | DABV01-04-M-2229 | 26-Feb-04 | $4,520.00 | ||||||||||
W011-14 Augmentation Mains Pipe and Fittings - CPA 005 | DABV01-04-Q-5015 | DABV01-04-M-5020 | 26-Feb-04 | $3,327,039.00 | |||||||||||||||
OFFICE EQUIPMENT- REGIONAL TRIBAL DEMOCRACY CENTER | DABV01-04-R-8174 | DABV01-04-M-8174 | 26-Feb-04 | $92,000.00 | |||||||||||||||
SPORTS EQUIPMENT FOR SCHOOLS | DABV01-04-R-8175 | DABV01-04-M-8175 | 26-Feb-04 | $35,412.00 | |||||||||||||||
AFAK HOSP ULTRASOUND | DABV01-04-R-8.00 | ||||||||||||||||||
DABV01-04-M-8.00 | |||||||||||||||||||
26-Feb-04 | $14,000.00 | ||||||||||||||||||
DIWANIYAH HOSP EQUIP | DABV01-04-R-8201 | DABV01-04-M-8201 | 26-Feb-04 | $24,750.00 | |||||||||||||||
Seal Oil & PDS Pumps | DABV01-03-Q-2024 | DABV01-04-M-2247 | 27-Feb-04 | $2,851,569.00 | |||||||||||||||
Pipe Bending Machine | DABV01-03-Q-2140 | DABV01-04-M-2230 | 27-Feb-04 | $23,821.00 | |||||||||||||||
Ball Bearings | DABV01-04-Q-2327 | DABV01-04-M-2249 | 27-Feb-04 | $320.03 | PCC Building Renovation | DABV01-04-R-3013 | DABV01-04-C-3134 | 27-Feb-04 | $36,087.00 | ||||||||||
Kirkuk Asphalt Factory Renovation | DABV01-04-R-3015 | DABV01-04-C-3133 | 27-Feb-04 | $37,820.00 | |||||||||||||||
Tuz Asphalt Plant Renovation | DABV01-04-R-3018 | DABV01-04-C-3135 | 27-Feb-04 | $38,495.00 | |||||||||||||||
HUMAN RIGHTS TRANSPORT | DABV01-04-R-8199 | DABV01-04-M-8199 | 27-Feb-04 | $78,000.00 | |||||||||||||||
SECURITY FORCES TRANSPORT | DABV01-04-R-8199 | DABV01-04-M-8199 | 27-Feb-04 | $169,000.00 | |||||||||||||||
TRIBAL DEMO TRANSPORT | DABV01-04-R-8199 | DABV01-04-M-8199 | 27-Feb-04 | $91,000.00 | |||||||||||||||
WOMENS RIGHTS TRANSPORT | DABV01-04-R-8199 | DABV01-04-M-8199 | 27-Feb-04 | $78,000.00 | |||||||||||||||
SHAFIYAH ULTRASOUND | DABV01-04-R-8.00 | ||||||||||||||||||
DABV01-04-M-8.00 | |||||||||||||||||||
27-Feb-04 | $16,000.00 | ||||||||||||||||||
APC Equipment for Hartha | DABV01-03-Q-0079 | DABV01-04-M-2266 | 28-Feb-04 | $83,468.00 | |||||||||||||||
Pulse to Pneumatic Converters | DABV01-03-Q-2112 | DABV01-04-M-2267 | 28-Feb-04 | $197,901.00 | |||||||||||||||
ContinuoUSA Blowdown Pumps | DABV01-03-Q-2163 | DABV01-04-M-2263 | 28-Feb-04 | $22,000.00 | |||||||||||||||
Dial Thermometers & Temperature Switches | DABV01-03-Q-2209 | DABV01-04-M-2264 | 28-Feb-04 | $15,675.60 | Pressure Gauges | DABV01-03-Q-2210 | DABV01-04-M-2268 | 28-Feb-04 | $8,560.00 | ||||||||||
Adhesive Silver Roll Packing | DABV01-03-Q-2275 | DABV01-04-M-2261 | 28-Feb-04 | $42,840.00 | |||||||||||||||
Rehab of PTCH & Schuaibah Plants | DABV01-03-R-0035 | DABV01-04-C-0038 | 28-Feb-04 | $15,022,317.00 | |||||||||||||||
Tuz Micro-Projects | DABV01-04-Q-3046 | DABV01-04-M-3048 | 28-Feb-04 | $5,000.00 | |||||||||||||||
W011-14 Water Pipeline Equipment - CPA 002a | DABV01-04-Q-5002 | DABV01-04-M-5021 | 28-Feb-04 | $1,459,550.00 | |||||||||||||||
LABORATORY- AL FURAT HOSPITAL | DABV01-04-R-8139 | DABV01-04-M-8139 | 28-Feb-04 | $121,199.00 | |||||||||||||||
PH DEPARTMENTS- AL FURAT HOSPITAL | DABV01-04-R-8140 | DABV01-04-M-8140 | 28-Feb-04 | $86,790.00 | |||||||||||||||
IP EQUIPMENT(KARBALA) | DABV01-04-R-8162 | DABV01-04-M-8162 | 28-Feb-04 | $195,000.00 | |||||||||||||||
AUR SCHOOL | DABV01-04-R-8193 | DABV01-04-M-8193 | 28-Feb-04 | $55,217.00 | |||||||||||||||
AL JOUAHRI PRIMARY SCHOOL | DABV01-04-R-8195 | DABV01-04-M-8195 | 28-Feb-04 | $61,370.00 | |||||||||||||||
SHOMALY SPORTS CLUB | DABV01-04-R-8197 | DABV01-04-M-8197 | 28-Feb-04 | $56,634.00 | |||||||||||||||
Jumariyah Fire Station Maintenance Building | [n/a] | DABV01-04-M-5084 | 29-Feb-04 | $165,000.00 | |||||||||||||||
Kirkuk Badging Office Computer | DABV01-04-Q-3047 | DABV01-04-M-3049 | 29-Feb-04 | $500.00 | |||||||||||||||
AL MOWAFAQIA BRIDGE | DABV01-04-R-8158 | DABV01-04-M-8158 | 29-Feb-04 | $18,000.00 | |||||||||||||||
AL AZIZIA BRIDGE | DABV01-04-R-8159 | DABV01-04-M-8159 | 29-Feb-04 | $20,000.00 | |||||||||||||||
COUNTER TERROR EQUIP-VEST | DABV01-04-R-8094 | DABV01-04-M-8094 | 1-Mar-04 | $118,042.00 | |||||||||||||||
NEWSPAPER OFFICE SUPPLIES | DABV01-04-R-8156 | DABV01-04-M-8156 | 1-Mar-04 | $13,000.00 | |||||||||||||||
NEWSPAPER OFFICE SUPPLIES | DABV01-04-R-8157 | DABV01-04-M-8157 | 1-Mar-04 | $13,000.00 | |||||||||||||||
WASIT IP SALOON CARS | DABV01-04-R-8171 | DABV01-04-M-8171 | 1-Mar-04 | $205,000.00 | |||||||||||||||
BABYLON SPORTS CLUB | DABV01-04-R-8194 | DABV01-04-M-8194 | 1-Mar-04 | $27,860.00 | |||||||||||||||
BABYLON ATHLETIC FACILITY | DABV01-04-R-8196 | DABV01-04-M-8196 | 1-Mar-04 | $43,879.00 | |||||||||||||||
MASHRU SPORTS CLUB | DABV01-04-R-8198 | DABV01-04-M-8198 | 1-Mar-04 | $73,425.00 | |||||||||||||||
Feed Water Pump Coupler | DABV01-03-Q-2141 | DABV01-04-M-2149 | 2-Mar-04 | $15,508.00 | |||||||||||||||
Test Module Hpo 3 | DABV01-03-Q-2159 | DABV01-04-M-2252 | 2-Mar-04 | $37,842.00 | |||||||||||||||
Speed Reducer for Air Heater Soot Blower | DABV01-03-Q-2235 | DABV01-04-M-2253 | 2-Mar-04 | $7,500.00 | |||||||||||||||
Laboratory Test Equipment | DABV01-04-Q-2186 | DABV01-04-M-2234 | 2-Mar-04 | $133,376.00 | |||||||||||||||
W011-14 Water Pipeline Equipment - CPA 002c Items 1 & 2 | DABV01-04-Q-5002 | DABV01-04-M-5023 | 2-Mar-04 | $975,280.00 | |||||||||||||||
Diyala Transformers | DABV01-04-R-3036 | DABV01-04-M-3136 | 2-Mar-04 | $663,485.00 | |||||||||||||||
RAMADI-HRSOCIETY FURN | DABV01-04-R-8204 | DABV01-04-M-8204 | 2-Mar-04 | $36,457.00 | |||||||||||||||
BARNOON WATER TREATMENT | DABV01-04-R-8205 | DABV01-04-M-8205 | 2-Mar-04 | $30,000.00 | |||||||||||||||
ADNON Palace MOI Office | DABV01-04-Q-0014 | DABV01-04-C-0015 | 3-Mar-04 | $1,552,590.00 | |||||||||||||||
AK-47 | DABV01-04-Q-0022 | DABV01-04-M-0043 | 3-Mar-04 | $236,000.00 | |||||||||||||||
RKI Gas Detection Kits | DABV01-04-Q-2265 | DABV01-04-M-2233 | 3-Mar-04 | $10,073.50 | 16 Reconditioned Fuel Pumps | DABV01-04-Q-5013 | DABV01-04-M-5083 | 3-Mar-04 | $88,100.00 | ||||||||||
BUSA FOR TRIBAL | DABV01-04-R-8213 | DABV01-04-M-8213 | 3-Mar-04 | $220,500.00 | |||||||||||||||
BUSA TRANS HUMAN RIGHTS | DABV01-04-R-8214 | DABV01-04-M-8214 | 3-Mar-04 | $208,800.00 | |||||||||||||||
Al Muwafaquia Access Road | [n/a] | DABV01-04-M-5080 | 4-Mar-04 | $89,740.00 | |||||||||||||||
Clean up Campaign - Basrah | [n/a] | DABV01-04-M-5091 | 4-Mar-04 | $129,220.00 | |||||||||||||||
Qaladza Hospital | DABV01-03-R-3067 | DABV01-04-C-3115 | 4-Mar-04 | $93,790.00 | |||||||||||||||
Qaladizah Hospital, Police & Reception | DABV01-03-R-3068 | DABV01-04-C-3116 | 4-Mar-04 | $38,173.00 | |||||||||||||||
Raniah Hospital Police & Reception | DABV01-03-R-3069 | DABV01-04-C-3117 | 4-Mar-04 | $37,557.00 | |||||||||||||||
Baqubah TV/Radio Station Renovation | DABV01-03-R-3133 | DABV01-04-C-3137 | 4-Mar-04 | $430,543.00 | |||||||||||||||
KARBALA ATK GRANT | DABV01-04-G-8002 | DABV01-04-G-8002 | 4-Mar-04 | $100,000.00 | |||||||||||||||
Turbine Parts | DABV01-04-Q-2012 | DABV01-04-M-2269 | 4-Mar-04 | $40,801.38 | Three School BUSAes | DABV01-04-Q-5004 | DABV01-04-M-5090 | 4-Mar-04 | $90,000.00 | ||||||||||
NIEL CLINIC ELECTRIC | DABV01-04-R-8202 | DABV01-04-M-8202 | 4-Mar-04 | $5,200.00 | |||||||||||||||
WOMENS RIGHTS PROGRAM | DABV01-04-R-8215 | DABV01-04-M-8215 | 4-Mar-04 | $33,120.00 | |||||||||||||||
MUSATWASF CLINIC | DABV01-04-R-8216 | DABV01-04-M-8216 | 4-Mar-04 | $34,800.00 | |||||||||||||||
JOWADYIA PRIMARY AND SECONDARY SCHOOL | DABV01-04-R-8217 | DABV01-04-M-8217 | 4-Mar-04 | $39,300.00 | |||||||||||||||
OFFICE EQUIPMENT- HILLA TD CENTER | DABV01-04-R-8219 | DABV01-04-M-8219 | 4-Mar-04 | $72,200.00 | |||||||||||||||
JASRAH PEDESTRIAN BRIDGE | DABV01-04-R-8224 | DABV01-04-M-8224 | 4-Mar-04 | $131,400.00 | |||||||||||||||
Al-Quids Primary School (EI) | DABV01-03-Q-5103 | DABV01-04-M-5082 | 5-Mar-04 | $38,355.00 | |||||||||||||||
Al-Jazeera Primary School (EI) | DABV01-03-Q-5104 | DABV01-04-M-5082 | 5-Mar-04 | $52,111.00 | |||||||||||||||
Al-Tawheed Primary School (EI) | DABV01-03-Q-5105 | DABV01-04-M-5082 | 5-Mar-04 | $52,722.00 | |||||||||||||||
Tawakulna Ala Allah Primary School (EI) | DABV01-03-Q-5106 | DABV01-04-M-5082 | 5-Mar-04 | $20,592.00 | |||||||||||||||
Al Dayr School Rehab | DABV01-03-Q-5107 | DABV01-04-M-5082 | 5-Mar-04 | $150,984.00 | |||||||||||||||
Ad Campaign to Educate Iraqis | DABV01-04-R-0009 | DABV01-04-C-0012 | 5-Mar-04 | $5,854,864.00 | |||||||||||||||
NAJAF POLICE VEHICLES | DABV01-04-R-8226 | DABV01-04-M-8226 | 5-Mar-04 | $127,500.00 | |||||||||||||||
BABIL TV EQUIPMENT | DABV01-04-R-8230 | DABV01-04-M-8230 | 5-Mar-04 | $125,730.00 | |||||||||||||||
AL FAYHAA NEWS EQUIP | DABV01-04-R-8231 | DABV01-04-M-8231 | 5-Mar-04 | $36,020.00 | |||||||||||||||
Electronid Cards | DABV01-03-Q-2132 | DABV01-04-M-2273 | 6-Mar-04 | $303,450.00 | |||||||||||||||
Pressure Controller & Transmitter | DABV01-03-Q-2243 | DABV01-04-M-2255 | 6-Mar-04 | $11,448.00 | |||||||||||||||
Air Compressor | DABV01-04-Q-2116 | DABV01-04-M-2275 | 6-Mar-04 | $22,000.00 | |||||||||||||||
Critical Parts - al Qudas | DABV01-04-Q-2230 | DABV01-04-M-2276 | 6-Mar-04 | $68,281.10 | ABB Replacement Parts | DABV01-04-Q-2311 | DABV01-04-M-2274 | 6-Mar-04 | $22,650.00 | ||||||||||
Pick-up for Sports&Scouting Director | DABV01-04-Q-3043 | DABV01-04-M-3045 | 6-Mar-04 | $6,500.00 | |||||||||||||||
Digital Camera S&S Director | DABV01-04-Q-3044 | DABV01-04-M-3046 | 6-Mar-04 | $1,500.00 | |||||||||||||||
21 Passenger BUSA S&S Director | DABV01-04-Q-3048 | DABV01-04-M-3047 | 6-Mar-04 | $12,000.00 | |||||||||||||||
Erbil Police/Security Vehicles | DABV01-04-R-3097 | DABV01-04-C-3138 | 6-Mar-04 | $409,500.00 | |||||||||||||||
AL-NIDHAMMYA PRIMARY SCHOOL | DABV01-04-R-8181 | DABV01-04-M-8181 | 6-Mar-04 | $34,542.00 | |||||||||||||||
SHEIK SAAS PRIMARY SCHOOL | DABV01-04-R-8182 | DABV01-04-M-8182 | 6-Mar-04 | $33,025.00 | |||||||||||||||
EUM AL-KURA PRIMARY SCHOOL | DABV01-04-R-8183 | DABV01-04-M-8183 | 6-Mar-04 | $28,525.00 | |||||||||||||||
JASSAN SECONDARY SCHOOL | DABV01-04-R-8185 | DABV01-04-M-8185 | 6-Mar-04 | $18,176.00 | |||||||||||||||
AL-HEJAZE PRIMARY SCHOOL | DABV01-04-R-8186 | DABV01-04-M-8186 | 6-Mar-04 | $19,575.00 | |||||||||||||||
AL-AHRAR SECONDARY SCHOOL | DABV01-04-R-8187 | DABV01-04-M-8187 | 6-Mar-04 | $27,869.00 | |||||||||||||||
ZAIN AL-ABIDEN PRIMARY SCHOOL | DABV01-04-R-8188 | DABV01-04-M-8188 | 6-Mar-04 | $18,136.00 | |||||||||||||||
ABIN AL-BETAR PRIMARY SCHOOL | DABV01-04-R-8189 | DABV01-04-M-8189 | 6-Mar-04 | $18,899.00 | |||||||||||||||
AL-NHRAWAN PRIMARY SCHOOL | DABV01-04-R-8191 | DABV01-04-M-8191 | 6-Mar-04 | $17,737.00 | |||||||||||||||
AL FURSSAN SCHOOL | DABV01-04-R-8218 | DABV01-04-M-8218 | 6-Mar-04 | $85,100.00 | |||||||||||||||
SECURITY IMPROVEMENTS-GOV'T BLDG | DABV01-04-R-8220 | DABV01-04-M-8220 | 6-Mar-04 | $25,900.00 | |||||||||||||||
DORM FOR UNIVERSITY | DABV01-04-R-8237 | DABV01-04-M-8237 | 6-Mar-04 | $357,583.00 | |||||||||||||||
CONFERENCE CTR | DABV01-04-R-8238 | DABV01-04-M-8238 | 6-Mar-04 | $388,357.00 | |||||||||||||||
THEO UNIV DORMITORY | DABV01-04-R-8239 | DABV01-04-M-8239 | 6-Mar-04 | $350,000.00 | |||||||||||||||
KITCHEN FACILITY | DABV01-04-R-8240 | DABV01-04-M-8240 | 6-Mar-04 | $375,000.00 | |||||||||||||||
Rehabilitation of Al-Faiha Hospital Burns | [n/a] | DABV01-04-M-5094 | 7-Mar-04 | $179,794.00 | |||||||||||||||
Vehicles for Fine Arts Institute | DABV01-04-Q-3060 | DABV01-04-M-3062 | 7-Mar-04 | $20,100.00 | |||||||||||||||
Basrah Veteran Society Center | DABV01-04-Q-5020 | DABV01-04-M-5092 | 7-Mar-04 | $83,445.00 | |||||||||||||||
Al Madinah Fire Station | DABV01-04-Q-5021 | DABV01-04-M-5093 | 7-Mar-04 | $334,683.00 | |||||||||||||||
Telephone System for TV Station | DABV01-04-R-3130 | DABV01-04-C-3139 | 7-Mar-04 | $8,400.00 | |||||||||||||||
AL-EKHWAS PRIMARY SCHOOL | DABV01-04-R-8180 | DABV01-04-M-8180 | 7-Mar-04 | $37,025.00 | |||||||||||||||
AL-RABEAA PRIMARY SCHOOL | DABV01-04-R-8184 | DABV01-04-M-8184 | 7-Mar-04 | $29,060.00 | |||||||||||||||
JAFAR AL TAYAR PRIMARY SCHOOL | DABV01-04-R-8192 | DABV01-04-M-8192 | 7-Mar-04 | $33,263.00 | |||||||||||||||
PATIENT TRANSPORT | DABV01-04-M-8241 | DABV01-04-M-8241 | 8-Mar-04 | $54,000.00 | |||||||||||||||
PATIENT TRANSPORT | DABV01-04-M-8242 | DABV01-04-M-8242 | 8-Mar-04 | $54,000.00 | |||||||||||||||
PATIENT TRANSPORT | DABV01-04-M-8243 | DABV01-04-M-8243 | 8-Mar-04 | $49,000.00 | |||||||||||||||
PATIENT TRANSPORT | DABV01-04-M-8244 | DABV01-04-M-8244 | 8-Mar-04 | $55,616.00 | |||||||||||||||
PATIENT TRANSPORT | DABV01-04-M-8245 | DABV01-04-M-8245 | 8-Mar-04 | $53,800.00 | |||||||||||||||
Renovate PMO Bld. | DABV01-04-R-0012 | DABV01-04-C-0017 | 8-Mar-04 | $1,886,650.00 | |||||||||||||||
Shaqlawa Comm Center Access Rd | DABV01-04-R-3096 | DABV01-04-C-3141 | 8-Mar-04 | $48,000.00 | |||||||||||||||
AL-SHIMEYA PRIMARY SCHOOL | DABV01-04-R-8099 | DABV01-04-M-8099 | 8-Mar-04 | $37,589.00 | |||||||||||||||
MOUSA BIN NASSIR SECONDARY SCHOOL | DABV01-04-R-8225 | DABV01-04-M-8225 | 8-Mar-04 | $39,536.00 | |||||||||||||||
Catering at Police Academy | DABV01-04-Q-0024 | DABV01-04-M-0045 | 9-Mar-04 | $405,000.00 | |||||||||||||||
Food Service at Baghdad Academy | DABV01-04-Q-0024 | DABV01-04-M-0045 | 9-Mar-04 | $405,000.00 | |||||||||||||||
Transformer Oil | DABV01-04-Q-2220 | DABV01-04-M-2271 | 9-Mar-04 | $17,450.00 | |||||||||||||||
Cor-Ten Steel Strip | DABV01-04-Q-2331 | DABV01-04-M-2277 | 9-Mar-04 | $290,150.00 | |||||||||||||||
Four sub-stations in Basra | DABV01-04-Q-5012 | DABV01-04-M-5057 | 9-Mar-04 | $8,000,000.00 | |||||||||||||||
Survey of Iraqi's | DABV01-04-R-0017 | DABV01-04-C-0014 | 9-Mar-04 | $424,235.00 | |||||||||||||||
Baloka Bridge Reconstruction | DABV01-04-R-3051 | DABV01-04-C-3154 | 9-Mar-04 | $245,950.00 | |||||||||||||||
Al Askeri Sewage Pipeline | DABV01-04-R-3058 | DABV01-04-C-3153 | 9-Mar-04 | $115,590.00 | |||||||||||||||
SEBA SCHOOL | DABV01-04-R-8246 | DABV01-04-M-8246 | 9-Mar-04 | $109,982.00 | |||||||||||||||
P016 Cable Test Van | [n/a] | DABV01-04-M-5098 | 10-Mar-04 | $187,547.00 | |||||||||||||||
Suq Ash Shuyukh City Hospital Annex | [n/a] | DAVB01-04-M-5099 | 10-Mar-04 | $127,243.00 | |||||||||||||||
Pave Sherwan Mazin Road | DABV01-03-R-3158 | DABV01-04-C-3140 | 10-Mar-04 | $345,150.00 | |||||||||||||||
Khormal Sewer Extension | DABV01-03-R-3201 | DABV01-04-C-3155 | 10-Mar-04 | $296,850.00 | |||||||||||||||
ENG SVCS-HILLA UNIV | DABV01-04-M-8251 | DABV01-04-M-8251 | 10-Mar-04 | $118,400.00 | |||||||||||||||
VEHICLES FOR POLICE | DABV01-04-M-8252 | DABV01-04-M-8252 | 10-Mar-04 | $315,000.00 | |||||||||||||||
GOVERNATE VEHICLES | DABV01-04-M-8253 | DABV01-04-M-8253 | 10-Mar-04 | $361,000.00 | |||||||||||||||
FM SYSTEM-DIWANIYAH | DABV01-04-M-8254 | DABV01-04-M-8254 | 10-Mar-04 | $244,400.00 | |||||||||||||||
VEHICLES-KARBALA | DABV01-04-M-8255 | DABV01-04-M-8255 | 10-Mar-04 | $481,500.00 | |||||||||||||||
Equipment for Sports&Scouting Director | DABV01-04-Q-3042 | DABV01-04-M-3044 | 10-Mar-04 | $23,250.00 | |||||||||||||||
Kirkuk IPCC Vehicles | DABV01-04-Q-3045 | DABV01-04-M-3047 | 10-Mar-04 | $12,000.00 | |||||||||||||||
COLLEGE OF EDUCATION FOR GIRLS | DABV01-04-R-8176 | DABV01-04-M-8176 | 10-Mar-04 | $100,732.00 | |||||||||||||||
GOVERNORATE BUILDING | DABV01-04-R-8206 | DABV01-04-M-8206 | 10-Mar-04 | $133,161.00 | |||||||||||||||
DOCTOR'S HOSTEL-NAJAF GH | DABV01-04-R-8208 | DABV01-04-M-8208 | 10-Mar-04 | $21,557.00 | |||||||||||||||
REPAIR WATER NETWORK | DABV01-04-R-8209 | DABV01-04-M-8209 | 10-Mar-04 | $9,910.00 | |||||||||||||||
BUSA SUPPLY FOR WOMEN'S CENTER | DABV01-04-R-8210 | DABV01-04-M-8210 | 10-Mar-04 | $21,500.00 | |||||||||||||||
FENCE- DATE PALM RESEARCH CENTER | DABV01-04-R-8221 | DABV01-04-M-8221 | 10-Mar-04 | $33,800.00 | |||||||||||||||
DATE PALM RESEARCH CENTER | DABV01-04-R-8222 | DABV01-04-M-8222 | 10-Mar-04 | $41,000.00 | |||||||||||||||
MIRJAN HOSPITAL | DABV01-04-R-8247 | DABV01-04-M-8247 | 10-Mar-04 | $415,700.00 | |||||||||||||||
RAHMAN SCHOOL | DABV01-04-R-8248 | DABV01-04-M-8248 | 10-Mar-04 | $99,100.00 | |||||||||||||||
BESHIRE SCHOOL | DABV01-04-R-8249 | DABV01-04-M-8249 | 10-Mar-04 | $110,500.00 | |||||||||||||||
Al Haitham Hospital Renovation | N/A | DABV01-04-M-0047 | 10-Mar-04 | $108,300.00 | |||||||||||||||
Al Alwea Maternity Hospital | N/A | DABV01-04-M-0048 | 10-Mar-04 | $179,490.00 | |||||||||||||||
Transportation | N/A | DABV01-04-M-2279 | 10-Mar-04 | $3,650.00 | |||||||||||||||
Ponchos | N/A | DABV01-04-M-0046 | 10-Mar-04 | $35,100.00 | |||||||||||||||
Hydrogen Control Cabinets | DABV01-04-Q-2282 | DABV01-04-M-2280 | 11-Mar-04 | $224,372.74 | Mosul Recruiting Station Fuel | DABV01-04-Q-3061 | DABV01-04-M-3063 | 11-Mar-04 | $70.00 | ||||||||||
Rizgary Public Garden Renovation | DABV01-04-R-3085 | DABV01-04-C-3152 | 11-Mar-04 | $67,091.00 | |||||||||||||||
Mufty Public Garden Renovation | DABV01-04-R-3086 | DABV01-04-C-3149 | 11-Mar-04 | $54,786.00 | |||||||||||||||
Shorish Public Garden Renovation | DABV01-04-R-3088 | DABV01-04-C-3142 | 11-Mar-04 | $68,130.00 | |||||||||||||||
Kurdistan Public Garden Renovation | DABV01-04-R-3089 | DABV01-04-C-3148 | 11-Mar-04 | $111,183.00 | |||||||||||||||
Rapareen Public Garden Renovation | DABV01-04-R-3090 | DABV01-04-C-3150 | 11-Mar-04 | $51,110.00 | |||||||||||||||
Aulama Badawa Public Garden Renovation | DABV01-04-R-3091 | DABV01-04-C-3147 | 11-Mar-04 | $54,201.00 | |||||||||||||||
Ronaki Public Garden Renovation | DABV01-04-R-3092 | DABV01-04-C-3143 | 11-Mar-04 | $67,867.50 | Azadi Public Garden Sector 35/391 Renovation | DABV01-04-R-3093 | DABV01-04-C-3144 | 11-Mar-04 | $76,619.50 | Chewestan Public Garden Renovation | DABV01-04-R-3094 | DABV01-04-C-3151 | 11-Mar-04 | $55,383.00 | |||||
Shorta Public Garden Sector 405/157 Renovation | DABV01-04-R-3095 | DABV01-04-C-3145 | 11-Mar-04 | $72,028.40 | Two-Way Radios for Iraqi Riverine Patrol Service | [n/a] | DABV01-04-M-5095 | 12-Mar-04 | $31,860.00 | ||||||||||
VEHICLES FOR KEY IraqIS | DABV01-04-M-8257 | DABV01-04-M-8257 | 12-Mar-04 | $360,000.00 | |||||||||||||||
F009 LPG Trucks | DABV01-04-Q-5009 | DABV01-04-M-5096 | 12-Mar-04 | $513,300.00 | |||||||||||||||
F004 Fuel Station Works - Basrah 1 | DABV01-04-Q-5075 | DABV01-04-M-5088 | 12-Mar-04 | $381,900.00 | |||||||||||||||
F004 Fuel Station Works - Thi-Qar 1 | DABV01-04-Q-5076 | DABV01-04-M-5089 | 12-Mar-04 | $185,850.00 | |||||||||||||||
Baqubah Asphalt Factory Renovation | DABV01-04-R-3061 | DABV01-04-C-3158 | 12-Mar-04 | $111,335.78 | Construction at KMTB | DABV01-03-C-0034 | DABV01-03-C-0034 | 13-Mar-04 | $752,024.00 | ||||||||||
Screw Pumps (Mosul) | DABV01-03-Q-2182 | DABV01-04-M-2285 | 13-Mar-04 | $90,240.00 | |||||||||||||||
HILLA IP VEHICLES | DABV01-04-M-8258 | DABV01-04-M-8258 | 13-Mar-04 | $420,000.00 | |||||||||||||||
DIWANIYAH/WASIT VEHICLES | DABV01-04-M-8259 | DABV01-04-M-8259 | 13-Mar-04 | $419,000.00 | |||||||||||||||
Transformer Oil | DABV01-04-Q-2220 | DABV01-04-M-2286 | 13-Mar-04 | $25,324.00 | |||||||||||||||
AWS Standards - CD | DABV01-04-Q-2297 | DABV01-04-M-2287 | 13-Mar-04 | $2,659.96 | |||||||||||||||
AWS Standards - Print | DABV01-04-Q-2297 | DABV01-04-M-2288 | 13-Mar-04 | $16,627.00 | |||||||||||||||
Abu Rajash Water Treatment Facility | DABV01-03-R-3174 | DABV01-04-C-3169 | 14-Mar-04 | $257,500.00 | |||||||||||||||
Al Hamra Water Treatment Facility | DABV01-03-R-3175 | DABV01-04-C-3167 | 14-Mar-04 | $287,050.00 | |||||||||||||||
Ad Dujawl Water Treatment Facility | DABV01-03-R-3178 | DABV01-04-C-3170 | 14-Mar-04 | $160,000.00 | |||||||||||||||
Baiji Sewage Treatment Facility | DABV01-03-R-3179 | DABV01-04-C-3168 | 14-Mar-04 | $89,750.00 | |||||||||||||||
FURNITURE AND OFFICE EQUIPMENT- MOD #2 | DABV01-03-R-8178 | DABV01-03-8178,P02 | 14-Mar-04 | $21,700.00 | |||||||||||||||
LOGISTIC EQUIPMENT | DABV01-04-Q-0027 | DABV01-04-M-0050 | 14-Mar-04 | $1,902.19 | Pressure Regulator & Diaphragm | DABV01-04-Q-2314 | DABV01-04-M-2197 | 14-Mar-04 | $4,250.00 | ||||||||||
Tools for WarehoUSAe | DABV01-04-Q-2357 | DABV01-04-M-2290 | 14-Mar-04 | $233.00 | |||||||||||||||
Ainkawa School Computers | DABV01-04-Q-3059 | DABV01-04-M-3061 | 14-Mar-04 | $1,680.00 | |||||||||||||||
Furnish, install, test 33 KV Trans Line Abell/Najibia | DABV01-04-Q-5081 | DABV01-04-M-5085 | 14-Mar-04 | $500,000.00 | |||||||||||||||
Refurbishing 26 Boston Whalers | DABV01-04-Q-5082 | DABV01-04-M-5097 | 14-Mar-04 | $291,900.00 | |||||||||||||||
Water Project - Hajy Qazy/Boka/Mewakay/Yamarand | DABV01-04-R-3112 | DABV01-04-C-3159 | 14-Mar-04 | $37,426.00 | |||||||||||||||
WTR PLNT-DAGHARAH | DABV01-04-R-8260 | DABV01-04-M-8260 | 14-Mar-04 | $175,000.00 | |||||||||||||||
WTR PLNT-QADUSAIYAH | DABV01-04-R-8261 | DABV01-04-M-8261 | 14-Mar-04 | $135,000.00 | |||||||||||||||
WTR PLNT-DIWANIYAH | DABV01-04-R-8262 | DABV01-04-M-8262 | 14-Mar-04 | $168,000.00 | |||||||||||||||
WTR PLNT-QADISIYAH | DABV01-04-R-8263 | DABV01-04-M-8263 | 14-Mar-04 | $147,000.00 | |||||||||||||||
WTR PLNT-DAGHARAH NORTH | DABV01-04-R-8264 | DABV01-04-M-8264 | 14-Mar-04 | $141,300.00 | |||||||||||||||
Desert Boots, CMATT | N/A | DABV01-04-M-0049 | 14-Mar-04 | $100,000.00 | |||||||||||||||
Al Wajehia Asphalt Factory Renovation | DABV01-04-R-3059 | DABV01-04-C-3172 | 15-Mar-04 | $89,250.00 | |||||||||||||||
Muqdadiya Asphalt Factory Renovation | DABV01-04-R-3060 | DABV01-04-C-3173 | 15-Mar-04 | $88,000.00 | |||||||||||||||
Water Project - Azadi Q | DABV01-04-R-3084 | DABV01-04-C-3145 | 15-Mar-04 | $136,079.00 | |||||||||||||||
Water Project - Qader Karam | DABV01-04-R-3113 | DABV01-04-C-3160 | 15-Mar-04 | $234,644.00 | |||||||||||||||
Water Project - Garmk Shatry/Garmk Dall/Dangawara/Qallarewely Gawra | DABV01-04-R-3114 | DABV01-04-C-3161 | 15-Mar-04 | $55,147.00 | |||||||||||||||
Water Project - Ali Khalla/Khalefa Ahmad | DABV01-04-R-3115 | DABV01-04-C-3162 | 15-Mar-04 | $29,959.00 | |||||||||||||||
Water Project - Chea Raza/Chuarkallwy Khuaroo | DABV01-04-R-3116 | DABV01-04-C-3163 | 15-Mar-04 | $34,433.00 | |||||||||||||||
Water Project Baqlan | DABV01-04-R-3117 | DABV01-04-C-3164 | 15-Mar-04 | $31,875.00 | |||||||||||||||
AL TAHREER SCHOOL | DABV01-04-R-8256 | DABV01-04-M-8256 | 15-Mar-04 | $180,500.00 | |||||||||||||||
SECURITY FACILITY UPGRADES | DABV01-04-R-8265 | DABV01-04-M-8265 | 15-Mar-04 | $448,500.00 | |||||||||||||||
DEMOCRATIC IraqI G. CARS | DABV01-04-R-8268 | DABV01-04-M-8268 | 15-Mar-04 | $47,950.00 | |||||||||||||||
Border Police Buildings | [n/a] | DABV01-04-M-5101 | 16-Mar-04 | $416,036.00 | |||||||||||||||
Al Ashaary School Renovation (Baqubah) | DABV01-03-R-3123 | DABV01-04-C-3175 | 16-Mar-04 | $6,288.00 | |||||||||||||||
Al Mojahdeen School Renovation (Baqubah) | DABV01-03-R-3123 | DABV01-04-C-3176 | 16-Mar-04 | $16,974.00 | |||||||||||||||
Al Mafaker School Renovation (Baqubah) | DABV01-03-R-3123 | DABV01-04-C-3177 | 16-Mar-04 | $24,783.00 | |||||||||||||||
Iben Fernass School Renovation (Baqubah) | DABV01-03-R-3123 | DABV01-04-C-3178 | 16-Mar-04 | $19,546.00 | |||||||||||||||
Al Wattan School Renovation (Muqdadiya) | DABV01-03-R-3124 | DABV01-04-C-3183 | 16-Mar-04 | $29,439.00 | |||||||||||||||
Al Quddas School Renovation (Muqdadiya) | DABV01-03-R-3124 | DABV01-04-C-3184 | 16-Mar-04 | $26,149.00 | |||||||||||||||
Al Shaheed Ali School Renovation (Mukdadiya) | DABV01-03-R-3124 | DABV01-04-C-3185 | 16-Mar-04 | $20,216.00 | |||||||||||||||
Al Rafah School Renovation (Muqdadiya) | DABV01-03-R-3124 | DABV01-04-C-3186 | 16-Mar-04 | $35,164.00 | |||||||||||||||
FURNITURE AND OFFICE EQUIPMENT- MODIFICATION | DABV01-03-R-8178 | DABV01-03-8178,P01 | 16-Mar-04 | $16,200.00 | |||||||||||||||
Packing Material | DABV01-04-Q-2328 | DABV01-04-M-2289 | 16-Mar-04 | $9,000.00 | |||||||||||||||
Transportation | DABV01-04-Q-2356 | DABV01-04-M-2291 | 16-Mar-04 | $4,740.00 | |||||||||||||||
Al Assala School Renovation (Khalis) | DABV01-04-R-3032 | DABV01-04-C-3187 | 16-Mar-04 | $19,378.00 | |||||||||||||||
Al Mammon School Renovation (Khalis) | DABV01-04-R-3032 | DABV01-04-C-3188 | 16-Mar-04 | $12,882.00 | |||||||||||||||
Al Manar School Renovation (Khalis) | DABV01-04-R-3032 | DABV01-04-C-3189 | 16-Mar-04 | $27,947.00 | |||||||||||||||
Khola Bent Al-Azur School Renovation (Khalis) | DABV01-04-R-3032 | DABV01-04-C-3190 | 16-Mar-04 | $19,435.50 | Homady Shehab School Renovation (Bani Saad) | DABV01-04-R-3033 | DABV01-04-C-3179 | 16-Mar-04 | $14,345.00 | ||||||||||
Al Syoof School Renovation (Bani Saad) | DABV01-04-R-3033 | DABV01-04-C-3180 | 16-Mar-04 | $17,514.00 | |||||||||||||||
Malek Al Ashtar School Renovation (Bani Saad) | DABV01-04-R-3033 | DABV01-04-C-3181 | 16-Mar-04 | $14,185.00 | |||||||||||||||
Al Badeea School Renovation (Bani Saad) | DABV01-04-R-3033 | DABV01-04-C-3182 | 16-Mar-04 | $22,010.30 | Al Sadiyah Pump Station Renovation | DABV01-04-R-3062 | DABV01-04-C-3174 | 16-Mar-04 | $200,000.00 | ||||||||||
VEHICLES FOR UNIVERSITY OF BABYLON | DABV01-04-R-8250 | DABV01-04-M-8250 | 16-Mar-04 | $46,800.00 | |||||||||||||||
CONSULTATION SERVICES | DABV01-04-R-8267 | DABV01-04-M-8267 | 16-Mar-04 | $9,600.00 | |||||||||||||||
ESMA SCHOOL | DABV01-04-R-8269 | DABV01-04-M-8269 | 16-Mar-04 | $137,300.00 | |||||||||||||||
ANSAF SCHOOL | DABV01-04-R-8270 | DABV01-04-M-8270 | 16-Mar-04 | $127,500.00 | |||||||||||||||
SINA SCHOOL | DABV01-04-R-8271 | DABV01-04-M-8271 | 16-Mar-04 | $133,400.00 | |||||||||||||||
PT Gear and Uniforms | N/A | DABV01-04-M-0006 | 16-Mar-04 | $54,550.00 | |||||||||||||||
Purchase of Jersey Barriers/T-Walls. | DABV01-03-Q-0106 | DABV01-03-M-0151 | 17-Mar-04 | $350,025.00 | |||||||||||||||
TOILET UPGRADES | DABV01-04-M-8266 | DABV01-04-M-8266 | 17-Mar-04 | $15,100.00 | |||||||||||||||
Tikrit Trash Removal | DABV01-04-R-3156 | DABV01-04-C-3191 | 17-Mar-04 | $400.00 | |||||||||||||||
Build Playground in Tikrit | DABV01-04-R-3157 | DABV01-04-C-3192 | 17-Mar-04 | $24,650.00 | |||||||||||||||
Al Rahidia Water Network Repair | DABV01-04-R-3158 | DABV01-04-C-3193 | 17-Mar-04 | $9,500.00 | |||||||||||||||
Albo Ajeel Water Station Repair | DABV01-04-R-3159 | DABV01-04-C-3194 | 17-Mar-04 | $10,500.00 | |||||||||||||||
Tal Alsebnt Drinking Water System Repair | DABV01-04-R-3160 | DABV01-04-C-3195 | 17-Mar-04 | $9,500.00 | |||||||||||||||
Alalam Mosque Repair | DABV01-04-R-3161 | DABV01-04-C-3196 | 17-Mar-04 | $17,000.00 | |||||||||||||||
Abn Aija Mosque Repair | DABV01-04-R-3162 | DABV01-04-C-3197 | 17-Mar-04 | $21,908.75 | Al Abasia Water Repair | DABV01-04-R-3163 | DABV01-04-C-3198 | 17-Mar-04 | $12,985.00 | ||||||||||
Imeajel Water Repair | DABV01-04-R-3164 | DABV01-04-C-3199 | 17-Mar-04 | $5,900.00 | |||||||||||||||
At Toot Water Repair | DABV01-04-R-3165 | DABV01-04-C-3.00 | 17-Mar-04 | $11,210.00 | |||||||||||||||
Al Hurash Water Repair | DABV01-04-R-3166 | DABV01-04-C-3201 | 17-Mar-04 | $17,940.00 | |||||||||||||||
Al Risasa Irrigation Repair | DABV01-04-R-3167 | DABV01-04-C-3202 | 17-Mar-04 | $39,575.00 | |||||||||||||||
Al Eshakey Internet Center | DABV01-04-R-3168 | DABV01-04-C-3203 | 17-Mar-04 | $21,460.00 | |||||||||||||||
Road Repair in Al-Duloiyah | DABV01-04-R-3169 | DABV01-04-C-3204 | 17-Mar-04 | $21,000.00 | |||||||||||||||
Road Repair in Balad City | DABV01-04-R-3170 | DABV01-04-C-3205 | 17-Mar-04 | $20,000.00 | |||||||||||||||
Road Repair in Yathrib | DABV01-04-R-3171 | DABV01-04-C-3206 | 17-Mar-04 | $17,580.00 | |||||||||||||||
Road Repair in Sherqat Village (Right Bank) | DABV01-04-R-3172 | DABV01-04-C-3207 | 17-Mar-04 | $17,500.00 | |||||||||||||||
Road Repair in Sherqat Village (Left Bank) | DABV01-04-R-3173 | DABV01-04-C-3208 | 17-Mar-04 | $30,000.00 | |||||||||||||||
Water Repair in Serqat Village (Right Bank) | DABV01-04-R-3174 | DABV01-04-C-3209 | 17-Mar-04 | $18,500.00 | |||||||||||||||
Water Repair in Serqat Village (Left Bank) | DABV01-04-R-3175 | DABV01-04-C-3210 | 17-Mar-04 | $28,600.00 | |||||||||||||||
WATER CONNECTION- 17 LOCATIONS | DABV01-04-R-8207 | DABV01-04-M-8207 | 17-Mar-04 | $8,700.00 | |||||||||||||||
WATER TREATMENT PLANT- KUFA | DABV01-04-R-8212 | DABV01-04-M-8212 | 17-Mar-04 | $26,250.00 | |||||||||||||||
SHIH SAD SEWAGE PUMP STATION | DABV01-04-R-8232 | DABV01-04-M-8232 | 17-Mar-04 | $29,600.00 | |||||||||||||||
AL-AHRAR SEWAGE PUMP STATION | DABV01-04-R-8233 | DABV01-04-M-8233 | 17-Mar-04 | $37,600.00 | |||||||||||||||
AL-SHIHIMIA PETROL STATION | DABV01-04-R-8234 | DABV01-04-M-8234 | 17-Mar-04 | $54,900.00 | |||||||||||||||
AL-KUT FUEL STATION (FORMER MILITARY) | DABV01-04-R-8235 | DABV01-04-M-8235 | 17-Mar-04 | $67,400.00 | |||||||||||||||
DAMOOK SEWAGE PUMP STATION | DABV01-04-R-8236 | DABV01-04-M-8236 | 17-Mar-04 | $31,800.00 | |||||||||||||||
ISU CARS | DABV01-04-R-8273 | DABV01-04-M-8273 | 17-Mar-04 | $37,800.00 | |||||||||||||||
Air-Cooled Heat Exchangers | DABV01-03-R-0038 | DABV01-04-M-2015 | 18-Mar-04 | $779,200.00 | |||||||||||||||
Renovate Riverside Park | DABV01-03-R-3126 | DABV01-04-C-3211 | 18-Mar-04 | $450,000.00 | |||||||||||||||
Renovate Restrooms 19 Baqubah Schools | DABV01-03-R-3132 | DABV01-04-C-3212 | 18-Mar-04 | $38,575.00 | |||||||||||||||
USAed SUVs | DABV01-04-Q-0025 | DABV01-04-M-0053 | 18-Mar-04 | $88,000.00 | |||||||||||||||
Muhammad Al Dahash Mosque Renovation | DABV01-04-Q-3066 | DABV01-04-M-3070 | 18-Mar-04 | $5,605.00 | |||||||||||||||
Othman Bin Affan Din Affan Mosque Rehabilitation | DABV01-04-Q-3067 | DABV01-04-M-3071 | 18-Mar-04 | $14,773.00 | |||||||||||||||
Hamid Hasson Mosque Renovation | DABV01-04-Q-3068 | DABV01-04-M-3072 | 18-Mar-04 | $9,874.00 | |||||||||||||||
Al Shafeiaii Mosque Renovation | DABV01-04-Q-3069 | DABV01-04-M-3073 | 18-Mar-04 | $3,787.00 | |||||||||||||||
Ibn Hanbel Mosque Renovation | DABV01-04-Q-3070 | DABV01-04-M-3074 | 18-Mar-04 | $12,712.00 | |||||||||||||||
Al Shahid Fadil Mosque Renovation | DABV01-04-Q-3071 | DABV01-04-M-3075 | 18-Mar-04 | $7,289.00 | |||||||||||||||
Al Salam Mosque Renovation | DABV01-04-Q-3072 | DABV01-04-M-3076 | 18-Mar-04 | $14,420.00 | |||||||||||||||
Al Athem Mosque Renovation | DABV01-04-Q-3073 | DABV01-04-M-3077 | 18-Mar-04 | $9,776.00 | |||||||||||||||
Al Almuaminin Mosque Renovation | DABV01-04-Q-3074 | DABV01-04-M-3078 | 18-Mar-04 | $10,546.00 | |||||||||||||||
Abu Hanifa Mosque Renovation | DABV01-04-Q-3075 | DABV01-04-M-3079 | 18-Mar-04 | $8,720.00 | |||||||||||||||
Aalabit Mosque Renovation | DABV01-04-Q-3076 | DABV01-04-M-3080 | 18-Mar-04 | $2,347.00 | |||||||||||||||
FREE Trade Zone -Khor az Zubayer | DABV01-04-Q-5078 | DABV01-04-M-5.00 | |||||||||||||||||
18-Mar-04 | $234,650.00 | ||||||||||||||||||
Renovate Restrooms in 18 Khalis Schools | DABV01-04-R-3038 | DABV01-04-C-3213 | 18-Mar-04 | $39,148.00 | |||||||||||||||
Renovate Restrooms in 18 Muqdadiya Schools | DABV01-04-R-3039 | DABV01-04-C-3214 | 18-Mar-04 | $37,628.00 | |||||||||||||||
Communications Directorate Generator | DABV01-04-R-3069 | DABV01-04-C-3216 | 18-Mar-04 | $40,900.00 | |||||||||||||||
Traffic Signs for Erbil Governorate | DABV01-04-R-3099 | DABV01-04-C-3218 | 18-Mar-04 | $186,000.00 | |||||||||||||||
Dahuk Transportation Jail | DABV01-04-R-3134 | DABV01-04-C-3217 | 18-Mar-04 | $117,575.00 | |||||||||||||||
University of Diyala Office Equipment | DABV01-04-R-3215 | DABV01-04-C-3215 | 18-Mar-04 | $118,400.00 | |||||||||||||||
RADIO STATION ANT MAST | DABV01-04-R-8172 | DABV01-04-M-8172 | 18-Mar-04 | $150,000.00 | |||||||||||||||
AL MA'AMOUN SCHOOL | DABV01-04-R-8272 | DABV01-04-M-8272 | 18-Mar-04 | $146,963.00 | |||||||||||||||
QADISIYAH WATER PROJ | DABV01-04-R-8277 | DABV01-04-M-8277 | 18-Mar-04 | $106,035.00 | |||||||||||||||
ABED QADISIYAH WATER PROJ | DABV01-04-R-8278 | DABV01-04-M-8278 | 18-Mar-04 | $91,368.00 | |||||||||||||||
DAGHARAH, WATER PROJ | DABV01-04-R-8279 | DABV01-04-M-8279 | 18-Mar-04 | $147,210.00 | |||||||||||||||
HUMAN RIGHTS VEHICLE | DABV01-04-R-8301 | DABV01-04-M-8301 | 18-Mar-04 | $12,800.00 | |||||||||||||||
132kV Cables & Conductors | DABV01-03-Q-2029 | DABV01-04-M-2265 | 19-Mar-04 | $2,218,800.00 | |||||||||||||||
Al Sherqat Sewaget Treatment | DABV01-03-R-3184 | DABV01-04-C-3220 | 19-Mar-04 | $82,650.00 | |||||||||||||||
Steel Shelter Wheat Store Renovation | DABV01-03-R-3219 | DABV01-04-C-3219 | 19-Mar-04 | $49,058.00 | |||||||||||||||
Air Circuit Breakers | DABV01-04-Q-2324 | DABV01-04-M-2281 | 19-Mar-04 | $14,823.10 | |||||||||||||||
PROVINCIAL COUNCIL BUILDING | DABV01-04-R-8294 | DABV01-04-M-8294 | 19-Mar-04 | $334,800.00 | |||||||||||||||
Emergency Management Center | N/A | DABV01-04-C-0020 | 19-Mar-04 | $196,387.00 | |||||||||||||||
Emergency Management Center | N/A | DABV01-04-C-0020 | 19-Mar-04 | $196,387.00 | |||||||||||||||
Stainless Steel Flexible Hoses | DABV01-03-Q-2156 | DABV01-04-M-2292 | 20-Mar-04 | $5,535.00 | |||||||||||||||
MOBILE RADIO/INSTALLATION | DABV01-04-Q0029 | DABV01-04-M-0054 | 20-Mar-04 | $234,396.00 | |||||||||||||||
BABYLON POLICE ACADEMY | GRANT-7 | DABV01-04-G-8007 | 20-Mar-04 | $150,000.00 | |||||||||||||||
Hawarabarza School Building Renovation | N/A (Ratification) | DABV01-04-C-3156 | 20-Mar-04 | $48,500.00 | |||||||||||||||
Chwarqurna Kindergarten Renovation | N/A (Ratification) | DABV01-04-C-3157 | 20-Mar-04 | $34,500.00 | |||||||||||||||
Fire Department Free Zone | [n/a] | DABV01-04-M-5102 | 21-Mar-04 | $19,049.00 | |||||||||||||||
Samawah Boold Bank | [n/a] | DABV01-04-M-5104 | 21-Mar-04 | $81,283.00 | |||||||||||||||
Rehab of Tikrit U Med Student Dorms | DABV01-03-R-3.00 | DABV01-04-C-3227 | 21-Mar-04 | $95,000.00 | |||||||||||||||
Ibn Majid Factory | DABV01-04-Q-5088 | DABV01-04-M-5103 | 21-Mar-04 | $357,868.00 | |||||||||||||||
Araft 4 School Renovation | DABV01-04-R-3105 | DABV01-04-C-3222 | 21-Mar-04 | $153,563.00 | |||||||||||||||
Kirkuk Railway Directorate Fence Construction | DABV01-04-R-3107 | DABV01-04-C-3223 | 21-Mar-04 | $150,000.00 | |||||||||||||||
Double Dressing of Roads in Erbil | DABV01-04-R-3110 | DABV01-04-C-3221 | 21-Mar-04 | $293,950.00 | |||||||||||||||
9mm Pistols | N/A | DABV01-03-D-0002 | 21-Mar-04 | $213,500.00 | |||||||||||||||
Diyala Generators (21) | DABV01-04-R-3064 | DABV01-04-C-3224 | 22-Mar-04 | $331,850.00 | |||||||||||||||
Kirkuk Railway Directorate Equipment | DABV01-04-R-3106 | DABV01-04-C-3224 | 22-Mar-04 | $175,651.00 | |||||||||||||||
Teacher District Sewage Renovation | DABV01-04-R-3108 | DABV01-04-C-3225 | 22-Mar-04 | $299,376.50 | |||||||||||||||
SEWER CLEANING- AL HIKOKEEN | DABV01-04-R-8295 | DABV01-04-M-8295 | 22-Mar-04 | $9,900.00 | |||||||||||||||
HILLA OLYMPIC POOL | DABV01-04-R-8316 | DABV01-04-M-8316 | 22-Mar-04 | $108,140.00 | |||||||||||||||
NAJAF PUB WRKS DOZER | DABV01-04-R-8317 | DABV01-04-M-8317 | 22-Mar-04 | $148,000.00 | |||||||||||||||
NAJAF WATER PLANT | DABV01-04-R-8318 | DABV01-04-M-8318 | 22-Mar-04 | $258,500.00 | |||||||||||||||
SHINAFIYAH WATER PLANT | DABV01-04-R-8319 | DABV01-04-M-8319 | 22-Mar-04 | $144,780.00 | |||||||||||||||
POLICE VEHICLE | DABV01-04-R-8320 | DABV01-04-M-8320 | 22-Mar-04 | $260,500.00 | |||||||||||||||
BABYLON ADV POLICE | G-8 | DABV01-04-G-8008 | 22-Mar-04 | $500,000.00 | |||||||||||||||
NIPPUR ARCHEO PROJ | G-9 | DABV01-04-G-8009 | 22-Mar-04 | $10,000.00 | |||||||||||||||
Al-Malwya School Renovation | NA | n/a | 22-Mar-04 | $35,014.00 | |||||||||||||||
Al-MUSAtafa School Renovation | NA | n/a | 22-Mar-04 | $26,547.00 | |||||||||||||||
Al-Mutaz Belloh School Renovation | NA | n/a | 22-Mar-04 | $29,050.00 | |||||||||||||||
Al-Kamael School Renovation | NA | n/a | 22-Mar-04 | $18,350.00 | |||||||||||||||
Saad Al-Therthar School Renovation | NA | n/a | 22-Mar-04 | $24,095.00 | |||||||||||||||
Al-Tormuthy School Renovation | NA | n/a | 22-Mar-04 | $29,125.00 | |||||||||||||||
Al-Yasameen School Renovation | NA | n/a | 22-Mar-04 | $21,310.00 | |||||||||||||||
Esmaa for Girl's School Renovation | NA | n/a | 22-Mar-04 | $28,470.00 | |||||||||||||||
Samarra for Boy's School Renovation | NA | n/a | 22-Mar-04 | $29,600.00 | |||||||||||||||
Zobeader for Girl's School Renovation | NA | n/a | 22-Mar-04 | $29,475.00 | |||||||||||||||
Renovate Baghdad Women's Dorm | NA | DABV01-04-C-0019 | 22-Mar-04 | $403,290.00 | |||||||||||||||
Safety Equipment for Electric Distribution | [n/a] | DABV01-04-M-5105 | 23-Mar-04 | $118,500.00 | |||||||||||||||
Safety Equipment for Electric Distribution | [n/a] | DABV01-04-M-5106 | 23-Mar-04 | $118,720.00 | |||||||||||||||
Supply Materials ITPC cables refurbishment for All Governorate | [n/a] | DABV01-04-M-5107 | 23-Mar-04 | $190,000.00 | |||||||||||||||
32 Incinerators for Health Centers - Muthanna | [n/a] | DABV01-04-M-5111 | 23-Mar-04 | $119,000.00 | |||||||||||||||
Prosthetic Limb Center - Equipment | DABV01-03-Q-5148 | DABV01-04-M-5112 | 23-Mar-04 | $69,793.00 | |||||||||||||||
Ad Dawr Irrigation Renovation | DABV01-03-R-3172 | DABV01-04-C-3171 | 23-Mar-04 | $599,252.00 | |||||||||||||||
Audit of External Debt of Iraq | DABV01-04-R-0001 | DABV01-04-C-0016 | 23-Mar-04 | $13,216,560.00 | |||||||||||||||
SUMMER SCHOOL FOR BOYS | DABV01-04-R-8287 | DABV01-04-M-8287 | 23-Mar-04 | $84,900.00 | |||||||||||||||
AL NASSER SCHOOL | DABV01-04-R-8288 | DABV01-04-M-8288 | 23-Mar-04 | $41,100.00 | |||||||||||||||
EL ULMA AL ARABI SCHOOL | DABV01-04-R-8289 | DABV01-04-M-8289 | 23-Mar-04 | $60,200.00 | |||||||||||||||
AL GENAN SCHOOL | DABV01-04-R-8290 | DABV01-04-M-8290 | 23-Mar-04 | $59,000.00 | |||||||||||||||
GOV'T BUILDING EXTERIOR | DABV01-04-R-8291 | DABV01-04-M-8291 | 23-Mar-04 | $78,700.00 | |||||||||||||||
AL RAMADAN YOUTH CENTER | DABV01-04-R-8292 | DABV01-04-M-8292 | 23-Mar-04 | $60,900.00 | |||||||||||||||
AL ASKAN YOUTH CENTER | DABV01-04-R-8293 | DABV01-04-M-8293 | 23-Mar-04 | $69,400.00 | |||||||||||||||
HEALTH CENTERS- QADASIYAH | DABV01-04-R-8.00 | DABV01-04-M-8.00 | 23-Mar-04 | $148,900.00 | |||||||||||||||
Anti-dash Fence | [n/a] | DABV01-04-M-5113 | 24-Mar-04 | $15,288.00 | |||||||||||||||
Technicial Institute (Refurb) | [n/a] | DABV01-04-M-5116 | 24-Mar-04 | $66,015.00 | |||||||||||||||
Hajy Awa Water Project | DABV01-03-R-3119 | DABV01-04-C-3166 | 24-Mar-04 | $165,599.00 | |||||||||||||||
BUILDING REHAB- IPCC BABIL | DABV01-04-R-8297 | DABV01-04-M-8297 | 24-Mar-04 | $9,400.00 | |||||||||||||||
GENERAL HOSPITAL- DIWANIYAH | DABV01-04-R-8299 | DABV01-04-M-8299 | 24-Mar-04 | $195,300.00 | |||||||||||||||
AL KUT UNIVERSITY EXTENSION | DABV01-04-R-8321 | DABV01-04-M-8321 | 24-Mar-04 | $128,300.00 | |||||||||||||||
EDUCATION DEPT. WAREHOUSAE | DABV01-04-R-8323 | DABV01-04-M-8323 | 24-Mar-04 | $76,300.00 | |||||||||||||||
AL SHOMALI BRIDGE | DABV01-04-R-8324 | DABV01-04-M-8324 | 24-Mar-04 | $11,200.00 | |||||||||||||||
NAJAF WATER PLANT(ABU GHRAB) | DABV01-04-R-8325 | DABV01-04-M-8325 | 24-Mar-04 | $258,000.00 | |||||||||||||||
POLICE ACADEMY PWR SYS | DABV01-04-R-8326 | DABV01-03-M-8326 | 24-Mar-04 | $479,550.00 | |||||||||||||||
AL FURSSAN FOOTBRIDGE | DABV01-04-M-8327 | DABV01-04-M-8327 | 25-Mar-04 | $5,500.00 | |||||||||||||||
Erbil Fine Arts Institute Keyboard | DABV01-04-Q-3084 | DABV01-04-M-3128 | 25-Mar-04 | $3,300.00 | |||||||||||||||
W011-14 Water Pipeline Equipment - CPA 005 | DABV01-04-Q-5002 | DABV01-04-M-5117 | 25-Mar-04 | $258,880.00 | |||||||||||||||
Basrah Prison Equipment #2 | DABV01-04-Q-5091 | DABV01-04-M-5114 | 25-Mar-04 | $19,180.00 | |||||||||||||||
Basrah Prison Equipment #3 | DABV01-04-Q-5092 | DABV01-04-M-5115 | 25-Mar-04 | $24,122.00 | |||||||||||||||
Mine Awareness Training | DABV01-04-Q-5095 | DABV01-04-M-5116 | 25-Mar-04 | $161,374.00 | |||||||||||||||
Technical Institute Renovation | DABV01-04-R-3002 | DABV01-04-C-3229 | 25-Mar-04 | $13,003.00 | |||||||||||||||
CLEAN HILLAH STREETS PROJECT | DABV01-04-R-8298 | DABV01-04-M-8298 | 25-Mar-04 | $18,200.00 | |||||||||||||||
AL REGALIA ROAD | DABV01-04-R-8302 | DABV01-04-M-8302 | 25-Mar-04 | $226,000.00 | |||||||||||||||
SADRAYA STREET SEWAGE | DABV01-04-R-8315 | DABV01-04-M-8315 | 25-Mar-04 | $201,800.00 | |||||||||||||||
MAINT. SHEIK SAAD BRIDGE | DABV01-04-R-8322 | DABV01-04-M-8322 | 25-Mar-04 | $15,400.00 | |||||||||||||||
NAYIF AL JARYAN ROAD PROJECT | DABV01-04-R-8328 | DABV01-04-M-8328 | 25-Mar-04 | $11,100.00 | |||||||||||||||
WATER NETWORK- ABU GHARAB | DABV01-04-R-8282 | DABV01-04-M-8282 | 26-Mar-04 | $183,300.00 | |||||||||||||||
WATER NETWORK- AL MISHKAB | DABV01-04-R-8283 | DABV01-04-M-8283 | 26-Mar-04 | $194,300.00 | |||||||||||||||
WATER NETWORK- AL WAHHABI | DABV01-04-R-8284 | DABV01-04-M-8284 | 26-Mar-04 | $179,900.00 | |||||||||||||||
YOUTH AND SPORTS CENTER- HYDERIA | DABV01-04-R-8286 | DABV01-04-M-8286 | 26-Mar-04 | $157,000.00 | |||||||||||||||
AK-47s | N/A | DABV01-03-M-0034 | 26-Mar-04 | $418,487.30 | |||||||||||||||
SUMER LGE WATER PLANT | DABV01-03-R-8280 | DABV01-04-M-8280 | 27-Mar-04 | $190,000.00 | |||||||||||||||
INSTALL SUMER WATER PLANT | DABV01-03-R-8281 | DABV01-04-M-8281 | 27-Mar-04 | $106,000.00 | |||||||||||||||
FIBER OPTIC SPLICER- KARBALA PTT | DABV01-04-M-8275 | DABV01-04-M-8275 | 27-Mar-04 | $36,800.00 | |||||||||||||||
JAIL RENOVATION | DABV01-04-M-8276 | DABV01-04-M-8276 | 27-Mar-04 | $175,400.00 | |||||||||||||||
AL GENAEN KINDERGARTEN | DABV01-04-M-8313 | DABV01-04-M-8313 | 27-Mar-04 | $83,200.00 | |||||||||||||||
AN GAM KINDERGARTEN | DABV01-04-M-8314 | DABV01-04-M-8314 | 27-Mar-04 | $86,200.00 | |||||||||||||||
USAed SUVs | DABV01-04-Q-0030 | DABV01-04-M-0057 | 27-Mar-04 | $44,000.00 | |||||||||||||||
USAed SUVs | DABV01-04-Q-0030 | DABV01-04-M-0057 | 27-Mar-04 | $44,000.00 | |||||||||||||||
Winter Jackets for Traffic Police | DABV01-04-Q-3004 | DABV01-04-M-3004 | 27-Mar-04 | $60,000.00 | |||||||||||||||
Theatre - Utba bin Qhazwan (not named Al Terbia) | DABV01-04-Q-5094 | DABV01-04-M-5118 | 27-Mar-04 | $89,141.00 | |||||||||||||||
Kirkuk Agricultural Equipment | DABV01-04-R-3101 | DABV01-04-C-3228 | 27-Mar-04 | $672,140.89 | |||||||||||||||
Local Iraqi Police Vehicles | DABV01-04-R-3111 | DABV01-04-C-3230 | 27-Mar-04 | $97,000.00 | |||||||||||||||
SCANIA BY-PASS | DABV01-04-R-8329 | DABV01-04-M-8329 | 27-Mar-04 | $416,300.00 | |||||||||||||||
Abu Dalaf School Renovation | N/A (Ratification) | n/a | 27-Mar-04 | $21,980.00 | |||||||||||||||
Al-Baraka-Al-Hasna School Renovation | N/A (Ratification) | n/a | 27-Mar-04 | $29,390.00 | |||||||||||||||
Al-Muthana School Renovation | N/A (Ratification) | n/a | 27-Mar-04 | $30,000.00 | |||||||||||||||
Stickers and Posters | Ratification | DABV01-04M-0056 | 27-Mar-04 | $310,200.00 | |||||||||||||||
Ninevah Auditing Board | Termination | n/a | 27-Mar-04 | $0.00 | |||||||||||||||
Chamchamal Intersection Renovation | DABV01-03-R-3153 | DABV01-04-C-3231 | 28-Mar-04 | $183,275.00 | |||||||||||||||
Abu Pschute Irrigation System (RI) | DABV01-04-M-5034 | DABV01-04-M-5034 | 28-Mar-04 | $49,383.00 | |||||||||||||||
Um Al Fisheg Irrigation Channel (RI) | DABV01-04-M-5034 | DABV01-04-M-5034 | 28-Mar-04 | $9,009.00 | |||||||||||||||
Maysan Agricultural Bank Rehabilitation (RI) | DABV01-04-M-5034 | DABV01-04-M-5034 | 28-Mar-04 | $23,688.00 | |||||||||||||||
Al Kahla CourthoUSAe Rehabilitation (RI) | DABV01-04-M-5034 | DABV01-04-M-5034 | 28-Mar-04 | $17,490.00 | |||||||||||||||
Qala Salih CourthoUSAe Rehabilitation (RI) | DABV01-04-M-5034 | DABV01-04-M-5034 | 28-Mar-04 | $18,995.00 | |||||||||||||||
Ali Al Gharbi CourthoUSAe Rehabilitation (RI) | DABV01-04-M-5034 | DABV01-04-M-5034 | 28-Mar-04 | $26,459.00 | |||||||||||||||
Al Amarah Technical Institute – Mech (RI) | DABV01-04-M-5034 | DABV01-04-M-5034 | 28-Mar-04 | $92,981.00 | |||||||||||||||
Al Amarah Technical Institute – Shops (RI) | DABV01-04-M-5034 | DABV01-04-M-5034 | 28-Mar-04 | $53,379.00 | |||||||||||||||
City Council Municipal Buildings | DABV01-04-M-5119 | DABV01-04-M-5119 | 28-Mar-04 | $1,818,938.00 | |||||||||||||||
Generator for Raheed Ashar Bank | DABV01-04-M-5120 | DABV01-04-M-5120 | 28-Mar-04 | $26,495.00 | |||||||||||||||
Furniture For Aqriculture bank | DABV01-04-M-5121 | DABV01-04-M-5121 | 28-Mar-04 | $22,300.00 | |||||||||||||||
W011-14 Augmentation Water Mains Project #1 | DABV01-04-M-5124 | DABV01-04-M-5124 | 28-Mar-04 | $454,532.00 | |||||||||||||||
W011-14 Augmentation Water Mains Project #2 | DABV01-04-M-5125 | DABV01-04-M-5125 | 28-Mar-04 | $28,150.00 | |||||||||||||||
W011-14 Augmentation Water Mains Project #3 | DABV01-04-M-5126 | DABV01-04-M-5126 | 28-Mar-04 | $230,175.00 | |||||||||||||||
W011-14 Augmentation Water Mains Project #4 | DABV01-04-M-5127 | DABV01-04-M-5127 | 28-Mar-04 | $150,331.00 | |||||||||||||||
W011-14 Augmentation Water Mains Project #5 | DABV01-04-M-5128 | DABV01-04-M-5128 | 28-Mar-04 | $418,476.00 | |||||||||||||||
W011-14 Augmentation Water Mains Project #6 | DABV01-04-M-5129 | DABV01-04-M-5129 | 28-Mar-04 | $80,391.00 | |||||||||||||||
Berrets | DABV01-04-Q-0026 | DABV01-04-M-0058 | 28-Mar-04 | $8,160.00 | |||||||||||||||
Battery Charger | DABV01-04-Q-2344 | DABV01-04-M-2298 | 28-Mar-04 | $3,360.00 | |||||||||||||||
Moog Servo Valves | DABV01-04-Q-2349 | DABV01-04-M-2296 | 28-Mar-04 | $6,540.00 | |||||||||||||||
Harvest HT-4 Cordless phone | DABV01-04-Q-2350 | DABV01-04-M-2294 | 28-Mar-04 | $1,968.30 | |||||||||||||||
Laser Pointer Reflective Tape | DABV01-04-Q-2377 | DABV01-04-M-2297 | 28-Mar-04 | $668.12 | |||||||||||||||
Erbil Transportation Jail Renovation | DABV01-04-R-3177 | DABV01-04-C-3232 | 28-Mar-04 | $187,480.00 | |||||||||||||||
FURNITURE- GOV'T TELECOM | DABV01-04-R-8311 | DABV01-04-M-8311 | 28-Mar-04 | $12,500.00 | |||||||||||||||
AL MONTASSER SCHOOL | DABV01-04-R-8330 | DABV01-04-M-8330 | 28-Mar-04 | $129,600.00 | |||||||||||||||
UNIVERSITY LIBRARY | DABV01-04-R-8331 | DABV01-04-M-8331 | 28-Mar-04 | $51,600.00 | |||||||||||||||
Harvest HT-4 Cordless phone | DABV01-04-Q-2350 | DABV01-04-M-2295 | 28-Mar-04 | $5,315.00 | |||||||||||||||
Kirkuk City Schools Windows and Doors | DABV01-03-Q-3031 | DABV01-03-M-3039 | 29-Mar-04 | $5,000.00 | |||||||||||||||
AlTamin Hinterlands School Windows and Doo | DABV01-03-Q-3032 | DABV01-03-M-3040 | 29-Mar-04 | $5,000.00 | |||||||||||||||
Diyanah Clinic Renovation | DABV01-03-R-3156 | DABV01-04-C-3245 | 29-Mar-04 | $140,495.00 | |||||||||||||||
KARBALA MOTORCYCLES | DABV01-03-R-8336 | DABV01-04-M-8336 | 29-Mar-04 | $132,500.00 | |||||||||||||||
Installation Power ITPC cables refurbishment for All Governorate | DABV01-04-M-5122 | DABV01-04-M-5122 | 29-Mar-04 | $151,200.00 | |||||||||||||||
Installation ITPC cables refurbishment for All Governorate | DABV01-04-M-5123 | DABV01-04-M-5123 | 29-Mar-04 | $164,700.00 | |||||||||||||||
Basrah Landfill and Transfer Stations | DABV01-04-M-5130 | DABV01-04-M-5130 | 29-Mar-04 | $1,495,143.00 | |||||||||||||||
W011-14 Crew Repair Tools | DABV01-04-M-5131 | DABV01-04-M-5131 | 29-Mar-04 | $576,816.00 | |||||||||||||||
Road Markings for Erbil Governorate | DABV01-04-R-3.00 | DABV01-04-C-3236 | 29-Mar-04 | $73,050.00 | |||||||||||||||
BUSAINESS COM. TRAINING CENTER | DABV01-04-R-8274 | DABV01-04-M-8274 | 29-Mar-04 | $47,500.00 | |||||||||||||||
NEKHEEL SCHOOL | DABV01-04-R-8334 | DABV01-04-M-8334 | 29-Mar-04 | $131,800.00 | |||||||||||||||
Sinbad Neighborhood Central Gutter | N/A | DABV01-04-C-0021 | 29-Mar-04 | $109,350.00 | |||||||||||||||
Sewer Pump Station 52 Renovation | N/A | DABV01-04-C-0025 | 29-Mar-04 | $140,000.00 | |||||||||||||||
Al Nahrain Univ Po.l Sci. Building | N/A | DABV01-04-C-0026 | 29-Mar-04 | $389,488.00 | |||||||||||||||
Baghdad University Parking Lot/BUSA Station | N/A | DABV01-04-C-0027 | 29-Mar-04 | $270,405.00 | |||||||||||||||
Build Surface Run-Off | N/A | DABV01-04-C-0037 | 29-Mar-04 | $176,000.00 | |||||||||||||||
ERPRO SECURITY FORCE | N/A | DABV01-04-C-0038 | 29-Mar-04 | $3,304,169.47 | |||||||||||||||
Babylon Printing Ratification | N/A | DABV01-04-M-0025 | 29-Mar-04 | $11,900.00 | |||||||||||||||
Election Services | DABV01-04-C-0018 | 29-Mar-04 | $892,664.00 | ||||||||||||||||
KARBALA AMBULANCE | DABV01-03-R-8341 | DABV01-04-M-8341 | 30-Mar-04 | $171,500.00 | |||||||||||||||
KARBALA LIBRARY-LANDSCAPE | DABV01-03-R-8342 | DABV01-04-M-8342 | 30-Mar-04 | $197,500.00 | |||||||||||||||
KARBALA LIBRARY FURNITURE | DABV01-03-R-8343 | DABV01-04-M-8343 | 30-Mar-04 | $224,010.00 | |||||||||||||||
W011-14 Water Pipeline Equipment - CPA 002b Item 5 | DABV01-04-M-5022 | DABV01-04-M-5022 | 30-Mar-04 | $160,206.00 | |||||||||||||||
W011-14 Nasiriya Pipe Fittings | DABV01-04-M-5086 | DABV01-04-M-5086 | 30-Mar-04 | $387,432.00 | |||||||||||||||
Al Muthanna 40MW Electrical Project | DABV01-04-M-5087 | DABV01-04-M-5087 | 30-Mar-04 | $24,457,139.00 | |||||||||||||||
Jetter Trailers | DABV01-04-M-5132 | DABV01-04-M-5132 | 30-Mar-04 | $198,000.00 | |||||||||||||||
Double Dressing of Roads in Erbil | DABV01-04-R-3110 | DABV01-04-C-3221 | 30-Mar-04 | $220,910.00 | |||||||||||||||
AL HUSASAINIYA YOUTH CENTER | DABV01-04-R-8312 | DABV01-04-M-8312 | 30-Mar-04 | $195,100.00 | |||||||||||||||
KARBALA LIBRARY BUILDING REPAIR | DABV01-04-R-8339 | DABV01-04-M-8339 | 30-Mar-04 | $373,400.00 | |||||||||||||||
Port Operation Center Equipment | N/A | DABV01-04-M-0059 | 30-Mar-04 | $49,740.00 | |||||||||||||||
Baghdad Depository Implementation | N/A | DABV01-04-M-0060 | 30-Mar-04 | $250,000.00 | |||||||||||||||
INSTL WATER AL BUTAHER | DABV01-03-R-8344 | DABV01-04-M-8344 | 31-Mar-04 | $25,100.00 | |||||||||||||||
Line Haul Service | DABV01-04-A-0001 | DABV01-04-A-0001 | 31-Mar-04 | $0.00 | |||||||||||||||
Salinity balance of the tidal flow Shatt Al Arab waterway. | DABV01-04-M-5133 | DABV01-04-M-5133 | 31-Mar-04 | $29,976.00 | |||||||||||||||
Implementation of the Nassirya BUSAsiness Center. | DABV01-04-M-5135 | DABV01-04-M-5135 | 31-Mar-04 | $102,152.00 | |||||||||||||||
Abu Diflah 2 Km Irregation ditch | DABV01-04-M-5136 | DABV01-04-M-5136 | 1-Apr-04 | $92,000.00 | |||||||||||||||
Refurb Al Hartha Water Sector, Basrah | DABV01-04-M-5137 | DABV01-04-M-5137 | 1-Apr-04 | $19,206.00 | |||||||||||||||
Protective Relay | DABV01-04-Q-2333 | DABV01-04-M-2302 | 1-Apr-04 | $895.00 | |||||||||||||||
IPCC Legal Council A | DABV01-04-R-3192 | DABV01-04-C-3250 | 1-Apr-04 | $3,225.00 | |||||||||||||||
IPCC Legal Council B | DABV01-04-R-3193 | DABV01-04-C-3251 | 1-Apr-04 | $3,225.00 | |||||||||||||||
Construction | N/A | DABV01-04-C-0039 | 1-Apr-04 | $227,460.00 | |||||||||||||||
Construction | N/A | DABV01-04-C-0045 | 1-Apr-04 | $216,495.00 | |||||||||||||||
BARNOON WATER PLANT | DABV01-03-R-8346 | DABV01-04-M-8346 | 2-Apr-04 | $80,000.00 | |||||||||||||||
Water and Soil Quality | DABV01-04-M-5138 | DABV01-04-M-5138 | 2-Apr-04 | $72,480.00 | |||||||||||||||
TK-81 Tunable Filter | DABV01-04-Q-2338 | DABV01-04-M-2304 | 2-Apr-04 | $3,392.35 | Renovate Shuhada Park | DABV01-04-R-3081 | DABV01-04-R-3081 | 2-Apr-04 | $34,834.00 | ||||||||||
AL HILLAH FIRE DEPARTMENT HQ | DABV01-04-R-8333 | DABV01-04-M-8333 | 2-Apr-04 | $24,000.00 | |||||||||||||||
WATER-HUZARAN/OWNA | DABV01-03-R-8348 | DABV01-04-M-8348 | 3-Apr-04 | $180,800.00 | |||||||||||||||
WATER-GRADA/HIKMA | DABV01-03-R-8349 | DABV01-04-M-8349 | 3-Apr-04 | $249,000.00 | |||||||||||||||
ROAD-AL GARBEE | DABV01-03-R-8350 | DABV01-04-M-8350 | 3-Apr-04 | $98,950.00 | |||||||||||||||
RENOVATE SCHOOL-AL-RABAB | DABV01-03-R-8351 | DABV01-04-M-8351 | 3-Apr-04 | $53,250.00 | |||||||||||||||
BUILD CELEBRA RM-AL-ZAHRAA | DABV01-03-R-8352 | DABV01-04-M-8352 | 3-Apr-04 | $100,950.00 | |||||||||||||||
OFFICE EQUIPMENT- KARBALA TDC | DABV01-04-M-8335 | DABV01-04-M-8335 | 3-Apr-04 | $78,400.00 | |||||||||||||||
Pilot Exciter | DABV01-04-Q-2049 | DABV01-04-M-2306 | 3-Apr-04 | $41,221.60 | |||||||||||||||
Flame Scanner Detector | DABV01-04-Q-2347 | DABV01-04-M-2308 | 3-Apr-04 | $12,550.00 | |||||||||||||||
KARBALA LIBRARY INTERNET PROJECT | DABV01-04-R-8345 | DABV01-04-M-8345 | 3-Apr-04 | $498,900.00 | |||||||||||||||
Abu Diflah 2 Km Irregation ditch | N/A | DABV01-04-M-5136 | 4-Apr-04 | $92,000.00 | |||||||||||||||
Portable Oil Purification Pump | DABV01-04-Q-2314 | DABV01-04-M-2303 | 4-Apr-04 | $57,390.00 | |||||||||||||||
W011-14 Water Pipeline Equipment - CPA 005 | DABV01-04-Q-5002 | DABV01-04-M-5117 | 4-Apr-04 | $270,564.00 | |||||||||||||||
Basrah Prison Equipment #1(X, locks etc.) | DABV01-04-Q-5089 | DABV01-04-M-5108 | 4-Apr-04 | $17,605.00 | |||||||||||||||
Basrah Prison Equipment #1(Y, toilets) | DABV01-04-Q-5089 | DABV01-04-M-5109 | 4-Apr-04 | $20,880.00 | |||||||||||||||
Koya Central Fire Department | DABV01-04-R-3046 | DABV01-04-C-3248 | 4-Apr-04 | $132,413.00 | |||||||||||||||
KanikharzhalahRoad Contruction | DABV01-04-R-3155 | DABV01-04-C-3247 | 4-Apr-04 | $48,250.00 | |||||||||||||||
Farmer Training | n/a (Grant) | DABV01-04-1-3006 | 4-Apr-04 | $170,000.00 | |||||||||||||||
W011-14Butt FUSAion Machines | [n/a] | DABV01-04-M-5143 | 5-Apr-04 | $56,650.00 | |||||||||||||||
TNG FOR LIBRARY STAFF | DABV01-03-R-8353 | DABV01-04-M-8353 | 5-Apr-04 | $90,000.00 | |||||||||||||||
Police Equipment | DABV01-04-Q-0035 | DABV01-04-M-0062 | 5-Apr-04 | $2,512,150.00 | |||||||||||||||
Audit of the DFI | DABV01-04-R-0015 | DABV01-04-C-0036 | 5-Apr-04 | $4,663,000.00 | |||||||||||||||
Grain Discharging Equipment | DABV01-04-R-0018 | DABV01-04-C-0048 | 5-Apr-04 | $507,000.00 | |||||||||||||||
Refurbish Internal Affairs office | DABV01-04-R-3012 | DABV01-04-C-3258 | 5-Apr-04 | $69,975.00 | |||||||||||||||
Refurbish Vocational Training Centre in Kirkuk | DABV01-04-R-3103 | DABV01-04-C-3257 | 5-Apr-04 | $207,434.00 | |||||||||||||||
Refurbish Vocational Training Centre in Kirkuk | DABV01-04-R-3154 | DABV01-04-C-3249 | 5-Apr-04 | $157,000.00 | |||||||||||||||
Renovation of Samarra General Hospital | DABV01-04-R-3180 | DABV01-04-C-3233 | 5-Apr-04 | $293,700.00 | |||||||||||||||
HILLA GENERAL HOSPITAL | DABV01-04-R-8337 | DABV01-04-M-8337 | 5-Apr-04 | $662,800.00 | |||||||||||||||
Millenium Project | n/a (Grant) | DABV01-04-1-3007 | 5-Apr-04 | $147,958.00 | |||||||||||||||
Baghdad U Bathroom Renovation | DABV01-04-C-0042 | 5-Apr-04 | $147,715.00 | ||||||||||||||||
Motorcycles | DABV01-04-Q-5085 | DABV01-04-M-5142 | 6-Apr-04 | $80,000.00 | |||||||||||||||
Aqar Sorya-Sararu Road Repair | DABV01-04-R-3136 | DABV01-04-C-3235 | 6-Apr-04 | $351,670.00 | |||||||||||||||
Police Patrol & Support Vehicle for Suly | DABV01-04-R-3152 | DABV01-04-C-3246 | 6-Apr-04 | $257,500.00 | |||||||||||||||
Al Wea Children's Hosp Renovation | DABV01-04-C-0043 | 6-Apr-04 | $252,568.00 | ||||||||||||||||
ARMORED VEHICLES | DABV01-03-R-8354 | DABV01-04-M-8354 | 7-Apr-04 | $275,000.00 | |||||||||||||||
State Oil Marketing Organization Internal Audit | DABV01-04-R-0002 | DABV01-04-M-0036 | 7-Apr-04 | $164,994.00 | |||||||||||||||
Soccer Stadium Renovation | DABV01-04-R-3079 | DABV01-04-C-3268 | 7-Apr-04 | $53,004.00 | |||||||||||||||
Erbil Group A Water Projects | DABV01-04-R-3146 | DABV01-04-C-3261 | 7-Apr-04 | $131,738.20 | |||||||||||||||
Erbil Group B Water Projects | DABV01-04-R-3147 | DABV01-04-C-3262 | 7-Apr-04 | $103,960.90 | |||||||||||||||
Erbil Group C Water Projects | DABV01-04-R-3148 | DABV01-04-C-3263 | 7-Apr-04 | $90,198.80 | |||||||||||||||
Erbil Group D Water Projects | DABV01-04-R-3149 | DABV01-04-C-3264 | 7-Apr-04 | $37,071.00 | |||||||||||||||
Erbil Group E Water Projects | DABV01-04-R-3150 | DABV01-04-C-3265 | 7-Apr-04 | $74,189.10 | |||||||||||||||
Erbil Group F Water Projects | DABV01-04-R-3151 | DABV01-04-C-3266 | 7-Apr-04 | $62,469.00 | |||||||||||||||
Police Video Equipment | DABV01-04-R-3191 | DABV01-04-C-3267 | 7-Apr-04 | $145,150.00 | |||||||||||||||
VEHICLES | DAVB01-04-Q-0031 | DAVB01-04-M-0063 | 7-Apr-04 | $20,676,138.00 | |||||||||||||||
VEHICLES | DAVB01-04-Q-0031 | DAVB01-04-M-0064 | 7-Apr-04 | $14,676,600.00 | |||||||||||||||
Jumpstart Project | DABV01-04-1-0001 | 7-Apr-04 | $5,000,000.00 | ||||||||||||||||
13 RUSAsian personnel Trucks | [n/a] | DABV01-04-M-5079 | 8-Apr-04 | $261,700.00 | |||||||||||||||
Personal Items | DABV01-04-Q-0041 | DABV01-04-M-0070 | 8-Apr-04 | $240,060.00 | |||||||||||||||
Terwanesh - Baloka Road Repair | DABV01-04-R-3132 | DABV01-04-C-3234 | 8-Apr-04 | $1,140,850.00 | |||||||||||||||
Medical Supplies - Ratification | [n/a] | DABV01-04-M-5150 | 9-Apr-04 | $5,000.00 | |||||||||||||||
Dual Chain Excitation System | DABV01-03-Q-2127 | DABV01-04-M-2311 | 9-Apr-04 | $200,819.00 | |||||||||||||||
Thermometer, Infrared | DABV01-04-Q-2368 | DABV01-04-M-2314 | 9-Apr-04 | $447.27 | |||||||||||||||
W008 Survey Equipment | DABV01-04-Q-5010 | DABV01-04-M-5152 | 9-Apr-04 | $14,880.00 | |||||||||||||||
Date Palm Reclamation and Restoration Program | DABV01-04-Q-5096 | DABV01-04-1-5.00 | |||||||||||||||||
9-Apr-04 | $337,639.00 | ||||||||||||||||||
Desertification Shelter Belt/Wind Break Project | DABV01-04-Q-5097 | DABV01-04-1-5001 | 9-Apr-04 | $179,712.00 | |||||||||||||||
RUSAtimiyah Stage 2 Waste Water Treatment Plant | DABV01-04-R-0003 | DABV01-04-C-0030 | 9-Apr-04 | $5,156,906.00 | |||||||||||||||
RUSAtimiyah Stages 0 & 1 | DABV01-04-R-0005 | DABV01-04-C-0032 | 9-Apr-04 | $5,422,127.00 | |||||||||||||||
RUSAtimiyah Electrical 0,1,2 | DABV01-04-R-0006 | DABV01-04-C-0033 | 9-Apr-04 | $1,437,218.00 | |||||||||||||||
Kerkh Waste Water Treatment Plant | DABV01-04-R-0007 | DABV01-04-C-0034 | 9-Apr-04 | $1,422,142.00 | |||||||||||||||
RUSAtimiyah 0,1,2 MCC Low Voltage Switchgear | DABV01-04-R-0008 | DABV01-04-C-0035 | 9-Apr-04 | $1,124,172.00 | |||||||||||||||
HoUSAe of Hope Construction Materials | DABV01-04-R-3074 | DABV01-04-C-3269 | 9-Apr-04 | $93,145.00 | |||||||||||||||
Kornish Parking Lot | DABV01-04-R-3080 | DABV01-04-R-3080 | 9-Apr-04 | $68,000.00 | |||||||||||||||
Renovate Al Taqafia School | DABV01-04-R-3083 | DABV01-04-C-3271 | 9-Apr-04 | $7,897.00 | |||||||||||||||
BODY ARMOR | DAVB01-04-Q-0032 | DAVB01-04-M-0065 | 9-Apr-04 | $3,945,000.00 | |||||||||||||||
BODY ARMOR | DAVB01-04-Q-0032 | DAVB01-04-M-0066 | 9-Apr-04 | $8,400,000.00 | |||||||||||||||
BODY ARMOR | DAVB01-04-Q-0032 | DAVB01-04-M-0067 | 9-Apr-04 | $4,260,000.00 | |||||||||||||||
BODY ARMOR | DAVB01-04-Q-0032 | DAVB01-04-M-0068 | 9-Apr-04 | $7,570,200.00 | |||||||||||||||
Al Kalal Primary School - Nasiriyah | [n/a] | DABV01-03-M-5073/P1 | 10-Apr-04 | $20,855.00 | |||||||||||||||
Basrah Tech Inst. Workshop Equipment | [n/a] | DABV01-04-M-5151 | 10-Apr-04 | $137,517.00 | |||||||||||||||
Basrah Tech Inst. Workshop Equipment | [n/a] | DABV01-04-M-5151 | 10-Apr-04 | $137,517.00 | |||||||||||||||
Development of Water wells of North-Eastren Part of | [n/a] | DABV01-04-M-5148 | 10-Apr-04 | $410,000.00 | |||||||||||||||
Development of Water wells of North-Eastren Part of | [n/a] | DABV01-04-M-5148 | 10-Apr-04 | $410,000.00 | |||||||||||||||
Academy Police Equipment | DABV01-04-Q-0039 | DABV01-04-M-0076 | 10-Apr-04 | $1,591,070.20 | |||||||||||||||
Academy Furniture | DABV01-04-Q-0040 | DABV01-04-M-0077 | 10-Apr-04 | $15,892.50 | |||||||||||||||
Ball Valve 3" | DABV01-04-Q-2380 | DABV01-04-M-2316 | 10-Apr-04 | $32,108.40 | |||||||||||||||
Compact Water & Reverse Osmosis Units | DABV01-04-Q-5093 | DABV01-04-M-5140 | 10-Apr-04 | $2,709,020.00 | |||||||||||||||
Compact Water & Reverse Osmosis Units | DABV01-04-Q-5093 | DABV01-04-M-5140 | 10-Apr-04 | $2,709,020.00 | |||||||||||||||
Compact Water Units | DABV01-04-Q-5093 | DABV01-04-M-5153 | 10-Apr-04 | $476,000.00 | |||||||||||||||
Compact Water Units | DABV01-04-Q-5093 | DABV01-04-M-5153 | 10-Apr-04 | $476,000.00 | |||||||||||||||
Fire Truck w/ Accessory Equipment | DABV01-04-Q-5098 | DABV01-04-M-5154 | 10-Apr-04 | $280,000.00 | |||||||||||||||
Fire Truck w/ Accessory Equipment | DABV01-04-Q-5098 | DABV01-04-M-5154 | 10-Apr-04 | $280,000.00 | |||||||||||||||
Renovate Mosul Public Library | DABV01-04-R-3070 | DABV01-04-C-3256 | 10-Apr-04 | $105,441.00 | |||||||||||||||
Renovate Tal-Abta School | DABV01-04-R-3082 | DABV01-04-C-3273 | 10-Apr-04 | $13,665.00 | |||||||||||||||
4 Ag Ministry Tractors and Implements | DABV01-04-R-3123 | DABV01-04-C-3272 | 10-Apr-04 | $220,000.00 | |||||||||||||||
REGIONAL TRIBAL CTR-GRANT | G-015 | DABV01-04-G-8015 | 10-Apr-04 | $150,000.00 | |||||||||||||||
Nasiriyah - MOHC Bldg | [n/a] | DABV01-03-M-5086/P1 | 11-Apr-04 | $9,150.00 | |||||||||||||||
W11-14 Water Pipeline Equipment - CPA 002c Item | DABV01-04-Q-5002 | DABV01-04-M-5023 | 11-Apr-04 | $0.00 | |||||||||||||||
W011-14 Nasiriya Pipe Fittings | DABV01-04-Q-5083 | DABV01-04-M-5086 | 11-Apr-04 | $496,895.00 | |||||||||||||||
Baqubah Children's Hospital Elevator Repair | DABV01-04-R-3133 | DABV01-04-C-3274 | 11-Apr-04 | $16,400.00 | |||||||||||||||
Body Armor | DAV01-04-Q-0032 | DAVB01-04-M-0078 | 11-Apr-04 | $15,560,000.00 | |||||||||||||||
Police Station Container Bldgs | DABV01-03-Q-5079 | DABV01-03-M-5052/P2 | 12-Apr-04 | $4,000.00 | |||||||||||||||
Coumpound Journal Thrust | DABV01-04-2118 | DABV01-04-M-2231 | 12-Apr-04 | $70,536.10 | Road Checkpoint Uniforms | DABV01-04-R-3198 | DABV01-04-C-3275 | 12-Apr-04 | $62,180.00 | ||||||||||
Faida Road Repair 2 | DABV01-04-R-3203 | DABV01-04-C-3276 | 12-Apr-04 | $59,665.00 | |||||||||||||||
SOCCER STADIUM- MOD | DABV01-03-M-8246,P01 | DABV01-03-M-8246,P01 | 13-Apr-04 | $33,000.00 | |||||||||||||||
Servers for PMO | DABV01-04-Q-0051 | DABV01-04-C-0057 | 13-Apr-04 | $577,680.08 | Transformer | DABV01-04-Q-2332 | DABV01-04-M-2312 | 13-Apr-04 | $820,000.00 | ||||||||||
Basrah Prison Equipment #2 | DABV01-04-Q-5091 | DABV01-04-M-5114 | 13-Apr-04 | $5,940.00 | |||||||||||||||
Mosul Road Repair (II) | DABV01-04-R-3076 | DABV01-04-C-3280 | 13-Apr-04 | $400,000.00 | |||||||||||||||
Equipment for 20 Banks in Al Tamin | DABV01-04-R-3102 | DABV01-04-C-3278 | 13-Apr-04 | $446,809.00 | |||||||||||||||
Peshmerga Transfromation Office | n/a | DABV01-04-1-3011 | 13-Apr | $492,750.00 | |||||||||||||||
Water filtration repair- Khor Az Zubair | [n/a] | DABV01-04-M-5163 | 14-Apr-04 | $119,966.00 | |||||||||||||||
BOOKS FOR LIBRARY | DABV01-04-M-8356 | DABV01-04-M-8356 | 14-Apr-04 | $16,400.00 | |||||||||||||||
Harvest HT-4 Cordless phone | DABV01-04-Q-2350 | DABV01-04-M-2295 | 14-Apr-04 | $5,315.00 | |||||||||||||||
Chalkboards for Muthanna | DABV01-04-Q-5014 | DABV01-04-M-5078 | 14-Apr-04 | $233,440.00 | |||||||||||||||
North Basrah Business Center | DABV01-04-Q-5187 | DABV01-04-M-5159 | 14-Apr-04 | $80,649.00 | |||||||||||||||
Al Qadissiya Water Treatment Plant Renovation | DABV01-04-R-3063 | DABV01-04-C-3279 | 14-Apr-04 | $104,419.00 | |||||||||||||||
Software for PMO | DABV01-04-0058 | 14-Apr-04 | $106,452.44 | ||||||||||||||||
Nasiriyah Nationality Office | [n/a] | DABV01-03-M-5091/P1 | 15-Apr-04 | $38,651.00 | |||||||||||||||
As Samawah Power Plant Soil Testing | [n/a] | DABV01-04-M-5141 | 15-Apr-04 | $3,000.00 | |||||||||||||||
Prosthetic Limb Center - Equipment | [n/a] | DABV01-04-M-5112 | 15-Apr-04 | $20,571.00 | |||||||||||||||
Water Wells for Irrigation of Basrah | [n/a] | DABV01-04-M-5149 | 15-Apr-04 | $295,000.00 | |||||||||||||||
Arbil Boy's Orphanage Well Excavation | DABV01-03-R-3063 | DABV01-04-C-3281 | 15-Apr-04 | $28,010.00 | |||||||||||||||
Ball Valve 3" | DABV01-04-Q-2380 | DABV01-04-M-2319 | 15-Apr-04 | $7,598.10 | |||||||||||||||
Dredging & Wreck Removal, Az Zubayr Port | DABV01-04-Q-5011 | DABV01-04-M-5164 | 15-Apr-04 | $7,000,000.00 | |||||||||||||||
Al Ameen School Rehab | N/A | DABV01-04-C-0052 | 15-Apr-04 | $149,000.00 | |||||||||||||||
Al Moro'a School Rehab | N/A | DABV01-04-C-0053 | 15-Apr-04 | $130,065.00 | |||||||||||||||
Al Zahawe School Rehab | N/A | DABV01-04-C-0047 | 15-Apr-04 | $107,000.00 | |||||||||||||||
Software for PMO | DABV01-04-0059 | 15-Apr-04 | $20,668.04 | ||||||||||||||||
W011-14 Nasiriyah Installation of Mains Project #1 | [n/a] | DABV01-04-M-5166 | 16-Apr-04 | $133,808.00 | |||||||||||||||
W011-14 Nasiriyah Installation of Mains Project #2 | [n/a] | DABV01-04-M-5167 | 16-Apr-04 | $122,511.00 | |||||||||||||||
W011-14 Nasiriyah Installation of Mains Project #3 | [n/a] | DABV01-04-M-5168 | 16-Apr-04 | $63,983.00 | |||||||||||||||
W011-14 Nasiriyah Installation of Mains Project #4 | [n/a] | DABV01-04-M-5169 | 16-Apr-04 | $168,631.00 | |||||||||||||||
W011-14 Nasiriyah Installation of Mains Project #5 | [n/a] | DABV01-04-M-5170 | 16-Apr-04 | $86,280.00 | |||||||||||||||
W011-14 Nasiriyah Installation of Mains Project #6 | [n/a] | DABV01-04-M-5171 | 16-Apr-04 | $34,333.00 | |||||||||||||||
P020 Mobile Sub Station | [n/a] | DABV01-04-M-5058 | 16-Apr-04 | $0.00 | |||||||||||||||
Police Investigation Unit Offices | [n/a] | DABV01-04-M-5172 | 16-Apr-04 | $417,486.00 | |||||||||||||||
W011-14 CAD Work Stations | DABV01-04-Q-5087 | DABV01-04-M-5146 | 16-Apr-04 | $173,700.00 | |||||||||||||||
Salah Ad Din Ambulance Depot | DABV01-04-R-3121 | DABV01-04-C-3282 | 16-Apr-04 | $71,579.00 | |||||||||||||||
College of Nursing Renovation | DABV01-04-R-3135 | DABV01-04-C-3283 | 16-Apr-04 | $130,551.00 | |||||||||||||||
Police Vehicles Dohuk | DABV01-04-R-3204 | DABV01-04-C-3284 | 16-Apr-04 | $49,600.00 | |||||||||||||||
Software for PMO | DABV01-04-0060 | 16-Apr-04 | $46,625.65 | Basrah Sewerage Channel Clearance Project | [n/a] | DABV01-04-M-5174 | 17-Apr-04 | $159,000.00 | |||||||||||
P020 AL QUARNA SUBSTATION | [n/a] | DABV01-04-M-5175 | 17-Apr-04 | $1,644,158.00 | |||||||||||||||
126 Hyundai Troop Carriers | DABV01-04-R-0034 | DABV01-04-C-0062 | 17-Apr-04 | $4,615,380.00 | |||||||||||||||
Dahuk University Refurbishment | DABV01-04-R-3053 | DABV01-04-C-3285 | 17-Apr-04 | $68,298.00 | |||||||||||||||
Dahuk University Renovation | DABV01-04-R-3055 | DABV01-04-C-3286 | 17-Apr-04 | $44,089.00 | |||||||||||||||
Provide NVGs for ICDC | N/A | W914NS-04-M-0081 | 17-Apr-04 | $108,675.00 | |||||||||||||||
Basrah Prison Equipment #3 | [n/a] | DABV01-04-M-5115/P2 | 18-Apr-04 | $900.00 | |||||||||||||||
W011-14 Augmentation Water Mains Project #12 (Az | [n/a] | DABV01-04-M-5156 | 18-Apr-04 | $242,706.00 | |||||||||||||||
W011-14 Augmentation Water Mains Project #8 (Abu | [n/a] | DABV01-04-M-5154 | 18-Apr-04 | $178,118.00 | |||||||||||||||
W011-14 Augmentation Water Mains Project #9 (Al H | [n/a] | DABV01-04-M-5155 | 18-Apr-04 | $49,554.00 | |||||||||||||||
Magnetic Float Switch | DABV01-03-Q-2138 | DABV01-04-M-2228 | 18-Apr-04 | $2,520.00 | |||||||||||||||
Turbine Oil | DABV01-04-Q-2373 | DABV01-04-M-2322 | 18-Apr-04 | $16,200.00 | |||||||||||||||
Basrah Prison Equipment #2 | DABV01-04-Q-5091 | DABV01-04-M-5114/P2 | 18-Apr-04 | $900.00 | |||||||||||||||
Nasiriyah Waste Clean-Up | [n/a] | DABV01-04-M-5178 | 19-Apr-04 | $197,000.00 | |||||||||||||||
Three Water Compact Units | [n/a] | DABV01-04-M-5183 | 19-Apr-04 | $629,820.00 | |||||||||||||||
Riot Police Gear | DABV01-04-Q-0047 | DABV01-04-M-0083 | 19-Apr-04 | $1,694,952.00 | |||||||||||||||
Dahuk University Forum | DABV01-04-R-3202 | DABV01-04-C-3287 | 19-Apr-04 | $5,000.00 | |||||||||||||||
ICDC Barrack Refu | DABV01-04-M-5181 | 19-Apr-04 | $243,219.00 | ||||||||||||||||
Nasiriyah Landfill and Transfer Stations | DABV01-04-M-5177 | 19-Apr-04 | $947,075.00 | ||||||||||||||||
Al Muwafaquia Access Road | [n/a] | DABV01-04-M-5080/P2 | 20-Apr-04 | $19,260.00 | |||||||||||||||
Theatre - Utba bin Qhazwan (not named Al Terbia) | [n/a] | DABV01-04-M-5118 | 20-Apr-04 | $12,675.00 | |||||||||||||||
Specialty Tools | DABV01-03-Q-2313 | DABV01-04-M-2251 | 20-Apr-04 | $249,262.00 | |||||||||||||||
Riot Police Uniform | DABV01-04-Q-0046 | DABV01-04-M-0082 | 20-Apr-04 | $513,502.50 | Renovation of Electrical Directorate | DABV01-04-R-3181 | DABV01-04-C-3288 | 20-Apr-04 | $62,648.00 | ||||||||||
Repave Agoola Road | DABV01-04-R-3190 | DABV01-04-C-3289 | 20-Apr-04 | $176,400.00 | |||||||||||||||
South Amarah Power Generation | [n/a] | DABV01-04-M-5184 | 21-Apr-04 | $489,790.00 | |||||||||||||||
W010 Water Directorate Bldgs (Al Dayr) | [n/a] | DABV01-04-M-5185 | 21-Apr-04 | $9,391.00 | |||||||||||||||
W010 Water Directorate Bldgs (Al Mowafaqitah) | [n/a] | DABV01-04-M-5187 | 21-Apr-04 | $11,375.00 | |||||||||||||||
W010 Water Directorate Bldgs (Al Seef) | [n/a] | DABV01-04-M-5186 | 21-Apr-04 | $15,950.00 | |||||||||||||||
Vanadium Dosing Skids | DABV01-04-Q-2376 | DABV-01-M-2320 | 21-Apr-04 | $108,723.00 | |||||||||||||||
Transformer Oil | DABV01-04-Q-2383 | DABV01-04-M-2325 | 21-Apr-04 | $43,720.00 | |||||||||||||||
Cleanup Vicinity & Routes to the Landfill Site | [n/a] | DABV01-04-M-5199 | 22-Apr-04 | $128,500.00 | |||||||||||||||
Special Clinic Equipment | [n/a] | DABV01-04-M-5003/P1 | 22-Apr-04 | $11,337.00 | |||||||||||||||
38" Barbed Tape Concertina | DABV01-04-Q-2367 | DABV01-04-M-2324 | 22-Apr-04 | $12,592.24 | |||||||||||||||
W011-14 Drilling & Tapping Machines CPA 003 | DABV01-04-Q-5002 | DABV01-04-M-5194 | 22-Apr-04 | $248,500.00 | |||||||||||||||
W011-14 Thi Qar Water Pumps | DABV01-04-Q-5084 | DABV01-04-M-5145 | 22-Apr-04 | $298,275.00 | |||||||||||||||
Basrah Airport Permanent Camp | DABV01-04-Q-5188 | DABV01-04-M-5190 | 22-Apr-04 | $159,042.00 | |||||||||||||||
W11-014 Leak Detection Equipment | DABV01-04-Q-5189 | DABV01-04-M-5188 | 22-Apr-04 | $157,444.00 | |||||||||||||||
W11-014 Domestic Water Meters | DABV01-04-Q-5190 | DABV01-04-M-5189 | 22-Apr-04 | $19,208.00 | |||||||||||||||
W11-014 Nasiriyah Pipework #2 | DABV01-04-Q-5191 | DABV01-04-M-5191 | 22-Apr-04 | $1,106,309.00 | |||||||||||||||
Riot Police Weapons | DABV01-04-Q-0045 | DABV01-04-M-0085 | 23-Apr-04 | $101,395.50 | |||||||||||||||
W011-14 Insertion Meters CPA 002 | DABV01-04-Q-5002 | DABV01-04-M-5195 | 23-Apr-04 | $257,183.00 | |||||||||||||||
11 Forensic Vans | DABV01-04-Q-5197 | DABV01-04-M-5160 | 23-Apr-04 | $140,800.00 | |||||||||||||||
ADDITIONAL CYCLE | [n/a] | DABV01-04-M-5142 | 24-Apr-04 | $8,000.00 | |||||||||||||||
Technical School for Boys Phase Two | [n/a] | DABV01-04-M-5196 | 24-Apr-04 | $139,143.00 | |||||||||||||||
W11-014 Al Amarah Replacement Water Mains As A | [n/a] | DABV01-04-M-5.00 | 24-Apr-04 | $427,700.00 | |||||||||||||||
W11-014 Al Amarah Replacement Water Mains Hai | [n/a] | DABV01-04-M-5201 | 24-Apr-04 | $213,450.00 | |||||||||||||||
Maintenance Material & Solvents | DABV01-04-Q-2359 | DABV01-04-M-2327 | 24-Apr-04 | $33,910.00 | |||||||||||||||
Renovate IPCC Offices Kirkuk | DABV01-04-Q-3113 | DABV01-04-M-3158 | 24-Apr-04 | $49,250.00 |