Mold Web Course/Chapter 4/Lesson 3
Jump to navigation
Jump to search
Lesson 3Remediation Plan
The highest priority in a remediation is to protect the health and safety of the building occupants and the remediation workers. Remediation plans vary according to the size and complexity of the job. They may require updating if circumstances change or more extensive contamination is discovered.
The remediation plan should include:
- Whether containment will be required.
- What level of PPE will be used.
- How the water or moisture problem will be fixed so the mold problem does not recur.
- How the moldy building materials will be removed to avoid spreading mold.