This page has been validated.
382
Page Eight
STATE AND ROUTE |
DESCRIPTION |
VIRGINIA | |
|
Bypass marking to be over new facility beginning at the intersection of present U. S. 33 southwest of Elkton, thence northeast to the intersection of U. S. 33 and U. S. 340 east of Elkton, the present road through Elkton to be designated as Business Route 33. |
|
Bypass designation to be over a newly constructed facility from a point east of Amherst to the intersection with U.S. 29 west of Amherst. The existing U. S. 29 through Amherst to be designated as U.S. 29 Business. |
|
Bypass designation to be over a newly constructed facility from a point east of Pamplin City to the intersection of U. S. 460 west of Pamplin City. The existing U. S. 460 through Pamplin City to be designated U. S. 460 Business. |
WASHINGTON | |
|
Eliminate U. S. 10 designation from the intersection of U. S. 2 in Spokane to the present terminus in Seattle. Route overlaps I-90 in its entirety. |
|
From the British Columbia Line southerly to the intersection of I-5 and U.S. 99E in Portland, Oregon. |
|
From the British Columbia Line southerly to the intersection of I-5 at Bellingham, Washington. |
WEST VIRGINIA | |
|
Beginning at the intersection of U.S. 60 and S. R. 17 at St. Albans, thence over S.R. 17 in northwesterly direction to the intersection of S.R. 17 and existing U.S. 35 in Pt. Pleasant. |