advance of the 32nd Division, while the remaining four—the 5th Army Brigade R.F.A., the 231st and 230th Brigades R.F.A., and the 232nd Army Brigade R.F.A.—withdrew out of action and were placed in reserve to the west of the Canal.
The Signal Company meanwhile received instructions to establish a Forward Report Centre at La Baraque, on the site of what had formerly been a small farm at the cross-roads 500 yards north-east of Bellenglise. Here were a number of deep dug-outs and one or two strong cement shelters which had formerly been the Headquarters of one of the German formations holding the main Hindenburg Line east of the Canal. This Report Centre with the necessary signal office and local telephone lines to “G,” “Q,” and other essential offices sited in the neighbouring dug-outs, was completed during the 1st and 2nd October, and communication successfully established with Corps Headquarters; with all three Infantry Brigades in their reserve positions; and with 32nd Division Advanced Report Centre in a dug-out a few yards distant from the new signal office. At the same time three cable detachments were ordered up to La Baraque, ready for a move forward in the event of a break-through, while all the cable which could be got forward in the time was also collected here.
All possible preparations were thus completed to meet any situation which might arise, either in the event of the Division being required to pass through the 32nd Division on a route march through the enemy country, or to reinforce in the event of the battle going against our troops. Subsequent events were to demonstrate that this prevision was to have a decisive bearing on the readiness of the Division to fight the battle, the plans for which