and encourages the application of coal washing, processing, conversion, clean-burning and smoke-purifying technologies. At the same time, it is expediting the construction of desulfurizing facilities in coal-fired power plants, requiring that newly built coal-fired power plants must install and use desulfurizing facilities according to the permissible emission standards, and such existing plants must speed up their desulfurization upgrading. The Chinese government strictly prohibits the construction of new coal-fired power plants for the sole purpose of power generation in medium and large cities or on their outskirts.
— Proactive prevention of motor vehicle emission pollution. The development of the automobile industry and the improvement of the people's livelihood have led to a rapid growth in the number of motor vehicles. Consequently, preventing motor vehicle emission pollution has been put high on the environmental protection agenda. China is actively taking effective measures to this end: strictly enforcing vehicle emission standards; intensifying inspection for the environment-friendly production of vehicles; strictly implementing the annual emission inspection system for motor vehicles; strictly forbidding manufacture, sale and import of motor vehicles exceeding the emission limits. At the same time, China encourages the production and use of vehicles burning clean fuels, and the production of hybrid electric vehicles, and supports the development of rail transport and electric buses.
— Exercising strict environmental management of energy projects. Strengthening the environmental management of energy projects is an effective measure to ensure coordinated development between energy construction and environmental protection. China strictly enforces the environmental impact assessment system, restrains extensive mode of economic growth by exercising a strict environment access system. It ensures simultaneous design, construction and launching of environmental protection facilities at new, expansion and rebuilding projects, intensifies safe management of nuclear power projects, reinforces su-