Table 4. Checklist of controls for nanomaterial manufacturing and handling
Item | Category | Data |
---|---|---|
Process/task | Category
(select all applicable) □ Weighing □ Mixing □ Transferring □ Drying □ Cleaning □ Cutting/sanding □ Harvesting □ Unpacking ENMs □ Maintenance/repair □ Finishing (drilling, sawing, grinding) □ Packaging/shipping □Others: ________________________
|
Workspace
Duration (min) Frequency (times per day) Number of workers involved PPE type Concentration Size distribution: ___________________ Number: __________________________ Mass: _____________________________ |
Nanomaterial | □ SWCNT
□ MWCNT □ Other carbon-based □ Metals □ Oxides □ Quantum dots □ Composite: ____________________ □ Others: ________________________ |
Processing rate/volume
Primary particle size Concentration at source Number: __________________________ Mass: _____________________________ Concentration at worker breathing zone or area (designate) Number: __________________________ Mass: _____________________________ Breathing zone: ____________________ Area: _____________________________ |
(Continued)
Current Strategies for Engineering Controls in Nanomaterial Production and Downstream Handling Processes
53