Page:Current Strategies for Engineering Controls in Nanomaterial Production and Downstream Handling Processes.pdf/71

From Wikisource
Jump to navigation Jump to search
This page has been proofread, but needs to be validated.

Table 4 (Continued). Checklist of controls for nanomaterial manufacturing and handling



Industrial Exhaust Ventilation Deficiency Report Worksheet (Continued)
Make-up air System maintenance
□ No replacement air

□ Insufficient air for dilution of fugitive emissions

□ Contaminated by exhaust air

□ Supply diffuser blows on hood face

□ Supply diffuser blocked

□ Temperature inadequate

□ Employee complaints (noise, draft)

□ Does not meet ASHRAE 62 provisions

□ Supply not balanced with exhaust

□ Inadequate maintenance (equipment broken)

□ Lack of ongoing PM program

Worksite Manifold exhaust systems
□ Cluttered, housekeeping poor, dirty

□ Hood positioned near door, window, walkway, other turbulence

□ Fire escape routes blocked

□ Aisles blocked

□ Likelihood of fire/explosion; mixed chemicals

□ Corrosion in manifold

□ Condensation in manifold

□ One hood goes positive

□ Part of system under positive pressure

Notes




SMACNA: Sheet Metal and Air Conditioning Contractors’ National Association



56 Current Strategies for Engineering Controls in Nanomaterial Production and Downstream Handling Processes