Page:Dangerous Goods (Shipping) Regulation 2012 (Cap. 295F).pdf/41

From Wikisource
Jump to navigation Jump to search
This page has been proofread, but needs to be validated.

Dangerous Goods (Shipping) Regulation 2012

Explanatory Note
L.N. 56 of 2012
Paragraph 11
B2517

11. Section 8 restricts the anchoring and berthing of type 1 vessels carrying on board Class 1 dangerous goods (defined in section 2).

12. Section 9 regulates the movement of type 1 vessels carrying on board Class 1 dangerous goods during a tropical cyclone.

13. Section 10 requires a manifest to be submitted to the Director for dangerous goods loaded onto type 1 vessels.

14. Section 11 allows the loading and unloading of Class 1 dangerous goods onto or from type 1 vessels only at specified places.

15. Section 12 allows the loading or unloading of freight containers containing dangerous goods (other than Class 1 dangerous goods) onto or from type 1 vessels only at specified places.

Part 3

16. This Part contains provisions relating to type 2 vessels.

17. Section 13 regulates the movement of type 2 vessels carrying on board Class 2, 3 or 3A dangerous goods.

18. Section 14 restricts the anchoring and berthing of type 2 vessels carrying on board Class 2, 3 or 3A dangerous goods.

19. Section 15 regulates the movement of type 2 vessels carrying on board Class 2, 3 or 3A dangerous goods during a tropical cyclone.

20. Section 16 provides for precautions to be taken while Class 3 or 3A dangerous goods in bulk (defined in section 2) are handled (defined in section 2) on board type 2 vessels.

Part 4

21. This Part contains provisions relating to type 3 vessels.