DREDGE AND DREDGING
565

at an inclination of about 1 in 20, but when the sand was mixed with shells these formed a coating which prevented the stream of water from washing out the shoot, and even with an inclination of 1 in 10 material could not be delivered. A pair of endless chains working down the long shoot overcame the difficulty, and also enabled hard clay in lumps to be dealt with. One dredger turned out about 2000 cub. yds. of thick clay in 15 hours, and when the clay was not hard it could deliver 150,000 cub. yds. in a month for several consecutive months.

Shore delivery has been successfully effected by raising the material by buckets in the ordinary way and delivering it into a vertical cylinder connected with floating jointed pipes through which the dredgings pass to the shore. This, of course, can only be done where the place of deposit is near the spot where the material is dredged. Two plans have been satisfactorily employed for this operation. At the Amsterdam Canal the stuff was discharged from the buckets into a vertical cylinder, and after being mingled with water by a revolving Woodford pump was sent off under a head of pressure of 4 or 5 ft. to the place of deposit in a semi-fluid state through pipes made of timber, hooped with iron. These wooden pipes were made in lengths of about 15 ft., connected with leather joints, and floated on the surface of the water. A somewhat similar process was also employed on the Suez Canal.

A dredger (Plate I. fig. 5), constructed by Messrs Hunter & English for reclamation works on Lake Copais in Greece was fitted with delivery belts running on rollers in steel lattice frames on each side of the vessel supported by masts and ropes. It could deliver 100 cub. metres per hour at 85 ft. from the centre of the dredger, at a cost of 1·82d. per cub. metre for working expenses, with coal at 45s. per ton, including 0·66d. per cub. metre for renewal of belts, upon which the wear and tear was heavy.

Another instance of the successful application of shore delivery apparatus is that of a dredger for Lake Titicaca, Peru, constructed by Messrs Hunter & English, which was fitted with long shoots on both sides, conveying the dredged material about 100 ft. from the centre of the dredger upon either side. The shoots were supported by shear-legs and ropes, and were supplied with water from a centrifugal pump in the engine room. This dredger could excavate and deliver 120 cub. yds. per hour at a cost of 1·725d. per cub. yd. with coal costing 40s. per ton. If coal had been available at the ordinary rate in England of 20s. per ton, the cost of the dredging and delivery would have been 0·82d. per cub. yd. for wages, coal, oil, &c., but not including the salary of the superintendent.

An interesting example of a shore delivering dredger is a light draught dredger constructed by Messrs Hunter & English for the Lakes of Albufera at the mouth of the river Ebro in Spain (Plate I. fig. 6). The conditions laid down for this dredger were that it should float in 18 in. of water and deliver the dredged material at 90 ft. from the centre of its own hull. In order to meet these requirements the vessel was made of steel plates 1/8 in. thick, and longitudinal girders from end to end of the vessel, the upward strain of flotation being conveyed to them from the skin plating by transverse bulkheads at short intervals. The dredger was 94 ft. long, 25 ft. wide, and 3 ft. deep, and the height of the top tumbler above the water was 25 ft. When completed the dredger drew 17 in. of water. The dredgings were delivered by the buckets upon an endless belt, driven from the main compound surface-condensing engine, which ran over pulleys supported upon a steel lattice girder, the outer end of which rested upon an independent pontoon. This belt delivered the dredgings at 90 ft. from the centre of the dredger round an arc of 180°. The dredger delivered 125 cub. yds. per hour of compact clay at a cost of 1·16d. per cub. yd. or 0·86d. per ton for wages, coal and stores. Another method of delivering dredgings is that of pneumatic delivery, introduced by Mr F. E. Duckham, of the Millwall Dock Co., by which the dredgings are delivered into cylindrical tanks in the dredger, closed by air-tight doors, and are expelled by compressed air either into the sea or through long pipes to the land. The Millwall Dock dredger is 113 ft. long, with a beam of 17 ft. and a depth of 12 ft. The draught loaded is 8 ft. It contains two cylindrical tanks, having a combined capacity of 240 cub. yds., and is fitted with compound engines of about 200 i.h.p., with a 20 in. air-compressing cylinder. The discharge pipe is 15 in. diameter by 150 yds. long. The nozzles of the air-injection pipes must not be too small, otherwise the compressed air, instead of driving out the material, simply pierces holes through it and escapes through the discharging pipe, carrying with it all the liquid and thin material in the tanks. The cost of working the Millwall Dock dredger is given by Mr Duckham at 1·75d. per cub. yd. of mud lifted, conveyed and deposited on land 450 ft. from the water-side, for working expenses only. This dredger is believed to be the first machine constructed with a traversing ladder, as suggested by Captain Gibson when dock-master of the Millwall Docks.

Blasting combined with Dredging.—In some cases it has been found that the bottom is too hard to be dredged until it has been to some extent loosened and broken up. Thus at Newry, John Rennie, after blasting the bottom in a depth of from 6 to 8 ft. at low water, removed the material by dredging at an expense of from 4s. to 5s. per cub. yd. The same process was adopted by Messrs Stevenson at the bar of the Erne at Ballyshannon, where, in a situation exposed to a heavy sea, large quantities of boulder stones were blasted, and afterwards raised by a dredger worked by hand at a cost of 10s. 6d. per cub. yd. Sir William Cubitt also largely employed blasting in connexion with dredging on the Severn (see Proc. Inst. C.E. vol. iv. p. 362). The cost of blasting and dredging the marl beds is given as being 4s. per cub. yd. A combination of blasting and dredging was employed in 1875 by John Fowler of Stockton at the river Tees. The chief novelty was in the barge upon which the machinery was fixed. It was 58 ft. by 28 ft. by 4 ft., and had eight legs which were let down when the barge was in position. The legs were then fixed to the barge, so that on the tide falling it became a fixed platform from which the drilling was done. Holes were bored and charged, and when the tide rose the legs were heaved up and the barge removed, after which the shots were discharged. There were 24 boring tubes on the barge, and that was the limit which could at any time be done in one tide. The area over which the blasting was done measured 500 yds. in length by 200 in breadth, a small part being uncovered at low water. The depth obtained in mid-channel was 14 ft. at low water, the average depth of rock blasted being about 4 ft. 6 in. The holes, which were bored with the diamond drill, varied in depth from 7 to 9 ft., the distance between them being 10 ft. Dynamite in tin canisters fired by patent fuse was used as the explosive, the charges being 2 ℔ and under. The rock is oolite shale of variable hardness, and the average time occupied in drilling holes 5 ft. deep was 12 minutes. The dredger raised the blasted rock. The cost for blasting, lifting and discharging at sea was about 4s. per cub. yd., including interest on dredging and other plant employed. The dredger sometimes worked a face of blasted material of from 7 to 8 ft. The quantity blasted was 110,000 cub. yds., and the contract for blasting so as to be lifted by the dredger was 3s. 1d. per cub. yd. A similar plan was adopted at Blyth Harbour (see Proc. Inst. C.E. vol. 81, p. 302). The cost of the explosives per cub. yd. was 1s. 4d., of boring 1s. 9d. per cub. yd., and of dredging 3s. per cub. yd., including repairs, but nothing for the use of plant. The whole cost worked out at 6s. 1d. per cub. yd. on the average.

Sand-pump Dredgers.—Perhaps the most important development which has taken place in dredging during recent years has been the employment of sand-pump dredgers, which are very useful for removing sandy bars where the particular object is to remove quickly a large quantity of sand or other soft material. They are, however, apt to make large holes, and are therefore not fitted for positions where it is necessary to finish off the dredging work to a uniform flat bottom, for which purpose bucket dredgers are better adapted. Pump dredgers are, however, admirable and economical machines for carrying out the work for which they are specially suited.

In the discussion upon Mr J. J. Webster’s paper upon “Dredging-Appliances” (Proc. Inst. C.E. vol. 89) at the Institution of Civil Engineers in 1886, Sir John Coode stated that he had first seen sand-pump dredgers at the mouth of the Maas in Holland. The centrifugal pump was placed against the bulkheads in the after part of the vessel, and the sand and water were delivered into a horizontal breeches-piece leading into two pipes running along the full length of the hopper. The difficulty of preventing the sand from running overboard was entirely obviated by its being propelled by the pump through these pipes, the bottoms of which were perforated by a series of holes. In addition, there were a few small flap-doors fixed at intervals, by means of which the men were able to regulate the discharge. On being tested, the craft pumped into its hopper 400 tons of sand in 22 minutes. The coamings round the well of the hoppers were constructed with a dip, and when the hopper was full the water ran over in a steady stream on either side. The proportion of sand delivered into the hopper was about 20% of the total capacity of the pump. The dredger was constructed by Messrs