Guangzhou-Shenzhen-Hong Kong Express Rail Link (Co-location) Ordinance
Part 3
Ord. No. 23 of 2018
Section 7
A1517
- (c) a right conferred, or an obligation imposed, by a preexisting Court order specified in Schedule 5;
- (d) a right conferred, or an obligation imposed, by any other pre-existing Court order, but only to the extent that the right or obligation may be exercised or discharged in relation to a non-reserved matter.
8. Interpretation of future documents in relation to rights and obligations
(1) This section applies if—
- (a) a future document contains a reference to Hong Kong or part of Hong Kong to describe the geographical scope for a right or obligation (other than a right acquired or accrued, or an obligation incurred, before the commencement date); and
- (b) the future document is none of the following—
- (i) an enactment;
- (ii) a statutory authority;
- (iii) a Court order.
(2) In interpreting the reference, to the extent that the right or obligation may be exercised or discharged in relation to a non-reserved matter, the Mainland Port Area is to be regarded as an area lying outside Hong Kong but lying within the Mainland.
(3) However, subsection (2) may be displaced by a contrary intention.