Page:Simple Sabotage Field Manual.djvu/21

From Wikisource
Jump to navigation Jump to search
This page has been validated.

water, machine tool coolant, or kerosene into the oil tank.

(2) In air-cooled transformers, block the ventilation by piling debris around the transformer.

(3) In all types of transformers, throw carbon, graphite or metal dust over the outside bushings and other exposed electrical parts.

(g) Turbines for the most part are heavily built, stoutly housed, and difficult of access. Their vulnerability to simple sabotage is very low.

(1) After inspecting or repairing a hydro turbine, fasten the cover insecurely so that it will blow off and flood the plant with water. A loose cover on a steam turbine will cause it to leak and slow down.

(2) In water turbines, insert a large piece of scrap iron in the head of the penstock, just beyond the screening, so that water will carry the damaging material down to the plant equipment.

(3) When the steam line to a turbine is opened for repair, put pieces of scrap iron into it, to be blasted into the turbine machinery when steam is up again.

(4) Create a leak in the line feeding oil to the turbine, so that oil will fall on the hot steam pipe and cause a fire.

(h) Boilers

(1) Reduce the efficiency of steam boilers any way you can. Put too much water in them to make them slow-starting, or keep the fire under them low to keep them inefficient. Let them dry and turn the fire up; they will crack and be ruined. An especially good trick is to keep putting limestone or water containing lime in the boiler; it will deposit lime on the bottom and sides. This deposit will provide very good insulation against heat; after enough of it has collected, the boiler will be completely worthless.

17