Page:Tom Swift and His Giant Cannon.djvu/139

From Wikisource
Jump to navigation Jump to search
This page has been proofread, but needs to be validated.
READY FOR THE TEST
129

would be rifled again, to make it true in case of any shrinkage.

Then came the almost Herculean task of shrinking on the great red-hot steel jackets and wire-windings, that would add strength to the great cannon. To do this the central core was set up on end, and the jackets, having been heated in an immense furnace, were hoisted by a great crane over the core, and lowered on it as one would lower his napkin ring over the rolled up napkin.

It took weeks of hard work to do this, and Tom and Ned, with Mr. Damon occasionally for company, remained almost constantly at the plant. But finally the cannon was completed, the rifling was done over again to correct any imperfections, and the manager said:

"You cannon is completed, Mr. Swift. I want to congratulate you on it. Never have we done such a stupendous piece of work. Only for your plans we could not have finished it. It was too big a problem for us. Your cannon is completed, but, of course, it will have to be mounted. What about the carriage?"

"I have plans for that," replied Tom; "but for the present I am going to put it on a temporary one. I want to test the gun now. It looks all right, but whether it will shoot accurately, and