Jump to content

Page:Towards a New Architecture (Le Corbusier).djvu/257

From Wikisource
There was a problem when proofreading this page.

DUCTION HOUSES IN REINFORCED CONCRETE

able of being erected by unskilled labour. The height of two slabs was arranged to

unit of measurement. Contrary to normal practice, the woodwork (mass-produced)

internal partitions; both walls and partitions were worked round the woodwork,

that remained was to install the pipes for the various services.

CONCRETE HOUSES

completed in three days. It comes out from the shuttering like a casting. But this

three days; we must take a year to build it, and we must have pointed roofs,

231