570
UTAH
|
Beginning at the present terminus at U.S. Route 666 at Monticello, then southerly over U.S. Route 191 to the intersection of State Road 95, then northwesterly over SR 95 to the intersection of State Road 245 then westerly and northwesterly over SR 24 to the intersection of U.S. Route 89 at Sigurd. |
VIRGINIA
|
Beginning at the intersection of present U.S. Route 15 and a new facility east of Warrenton, then southerly over the new facility to the intersection of U.S. Route 15 south of Warrenton. Extend present U.S. Route 15 Business between the northern intersection with present U.S. Route 15, then easterly over present U.S. Route 15 to the intersection with the proposed relocation of U.S. Route 15. |
|
Beginning at the intersection of present U.S. Route 29 and a new facility east of Warrenton, then southerly over the new facility to the intersection of present U.S. Route 29 south of Warrenton. Designate present U.S. Route 29 between these points as U.S. 29 Business. |
WASHINGTON
|
Beginning at the intersection of present U.S. Route 97 and U.S. Route 2 at Wenatchee, then northerly over U.S. Route 2 to the intersection of State Road 151 at Orondo, then northeasterly over SR 151 to the intersection of U.S. Route 97 north of Chelan. Designate present Route 97 between these points as U.S. Route 97 Alternate. |