Page:Pentagon-Papers-Part-V-B-4-Book-I.djvu/405

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

Declassified per Executive Order 13526, Section 3.3
NND Project Number: NND 63316. By: NWD Date: 2011


TOP SECRET

TOP SECRET

Paragraph 2. a. (2)LIGHT AVIATION (L-20/L-28/T-28)

PRESENT STATUS

T-28

The US Navy has provided 15 T-28C aircraft on lean basis to Vietnam. They will be shipped from the West Coast aboard the USNS CORE on 20-22 November. These aircraft will be replaced at a later time by 30 Navy combat configured T-28B aircraft with armor plate and self-sealing tanks.

L-20

CINCPAC has requested 9 additional L-20 light aircraft be provided fer expansion of RVNAF light observation capability.

L-28

L-28 aircraft are now being produced at the rate of 2 per month. CIA is taking the current production through December 1961. Beginning January 1962, the US Air Force is planning to procure an additional 14 1-28. They are presently conducting an evaluation of this aircraft for support of SAC missile operations. The evaluation report will be available about 30 January 1962.

FORCES AND EQUIPMENT

15 T-28C aircraft (on lean basis from US Navy)
30 T-28B aircraft (to replace the above)
9 L-20 aircraft
14 L-28 aircraft
TOP SECRET
376